BACKGROUND INFORMATION: With this communication, the Draft Fiscal Year (FY) 2010/1 1
Financial Plan and Budget is hereby provided to the City Council.
The General Fund budget for the FY 2010/11 is balanced without the use of reserves. The beginning
unreserved fund balance in the General Fund is $3.8 million. Significant one-time revenues have been
used to partially cover operating expenses and to address a portion of the City deferred maintenance
needs.
Employee contributions from all bargaining groups are a key component to having a balanced budget.
The City is grateful to the bargaining groups for their understanding and cooperation.
The budget document continues with a presentation that provides for summary data at the City-wide and
departmental levels.
FISCAL IMPACT: The draft 2010/11 budget provides an expenditure plan for all funds. The all Funds
budget is $179,333,640, an increase of $9.1 million, or about 5.4 percent over the
previous year. The General Fund Budget is $41,321,750, which includes one-time funding of
approximately $1.2 million. Absent the one-time funding, the General Fund reflects a growth of $266,000
over the prior year.
Jordan Ayers, Deputy City'MgfKager
APPROVED:
Ronradt Bartlam, Interim, City Manager
FY 2010/11 Budget
Department Presentations
City cou0cil
Ma
Parks Division
FY 2010/11 budget
FY 2009/10 original budget
Change
General Fund ratio
Funded positions FY 10/11
Unfunded positions
$2,292,700
$2,293,696
($996) 0%
6%
22
3
Service adjustments: Reduced park maintenance due to
three unfunded positions
2
Recreation Fund
Fund Balance
Beginning Fund Balance Unreserved
Revenues
Expenditures
Net Difference (Revenues Less Expenditures)
Fund Balance
Ending Fund Balance Unreserved
54,410 55,722
1,675,808 1,844,318 1,858,318 2,004,990
1,621,398 1,856,178 1,857,006 2,004,790
54,410 (11,860) 1,312 200
54,410 (11,860) 55,722 55,922
ki
.� Recreation Division
FY 2010/11 budget
FY 2009/10 original budget
Change
General Fund support
Funded positions FY 10/11
Unfunded positions
$2,004,790
$1,844,318
$160,472
9%
$493,180
9.5
I
E!
Parks & ReC/ Accomplishments
Parks
. Completed Phase 1 ADA improvements
• Partner with EUD on the Zupo Lighting Project
. Grape Bowl lighting retrofit
Recreation
. Increase attendance in adult sports programs
Partnered with LUSD on summer school programs
Programmed additional special events
6i
� Parks &Recreation/Emphasis
Parks
. Completed all-weather turf project at the Grape Bowl
. Complete lighting upgrades at Zupo Field
. Continue ADA improvements at the Grape Bowl
• Roadway and Curb Project at Lodi Lake
Recreation
. Continue to establish a special events unit
• Look for indoor facility opportunities
• Revise LUSD/P&R Joint -Use Agreement
. Continue to expand adult sports opportunities
6
Community Center
Center Fund
Fund Balance
Beginning Fund Balance Unreserved
Revenues
Expenditures
Net Difference (Revenues Less Expenditures)
Fund Balance
Ending Fund Balance Unreserved
`,ITuNu4+
(232,211) (201,833)
1,944,784
1,859,673
1,859,673 1,850,570
2,176,995
1,861,923
1,829,295 1,850,570
(232,211)
(2,250)
30,378
(232,211) (2;250) (201,833) (201,833)
N
Community Center
FY 2010/11 budget
FY 2009/10 budget
Change
General Fund support
$1,850,570
$1,859,673
($9,103)
-1%
$1,162,570
Funded positions FY 10/11
Unfunded positions
Service adjustment: Continue deferring maintenance
6.5
I
Community Center/Accomplishments
• Maintained revenues for the Performing Arts Center
• Co-produced major concert in the Grape Bowl
• Increase senior programming in partnership with UOP
• Maintained an aggressive activity schedule in negative
economy
Established the Lodi Arts Project
. Transition the pool to Recreation
9
,. community Center/Emphasis
• Continue to develop new revenue -generating programs
• Deferred maintenance
• Complete the new Art in Public Places Policy Guide
• Increase use of the Performing Arts Center
• Increase assistance for special events throughout the
City
• Maintain revenues for the next fiscal year
• Meld programming with Recreation to provide efficient
services to the Community
10
Community Development
Fund Balance
Beginning Fund Balance Unreserved
Revenues
Expenditures
Net Difference (Revenues Less Expenditures)
Fund Balance
Ending Fund Balance Unreserved
(167,024) (702,127) (713,886) (921,716) (566,223)
1,479,536 1,126,039 1,427,891 1,468,290 1,102,990
2,014,639 1,345,628 1,126, 074 1,112, 797 1,065,500
(535,103) (219,589) 301,817 355,493 37,490
(702,127) (921,716) (412,069) (566,223) (528,733)
11
ty Development
Fund balance history
12
I
5 ;
MIN r
{
,
9'
�ii
y
A
�. f
[
/ � ij
a � ' � �Y� FF'k �
�� £ I
� Yk ��� E �r
k✓ ". € � � �,!
.�
II y �f�:., Yw✓ Jr/ I
SEs
"ei"`.��'
G �
2 '' � k-.;
\°�
� �>. ii' S'; �
�' 5i
"✓ 4jS � y �:
�
�
�
�
�• ����
��� .-
��� ��
€ 5 �ti
?- �`
� � - ;f� -elf`
_. /�
s
12
FY 2009/10 original budget $1,123,218
Change ($57)718)
General Fund support
Funded Positions FY 10/11
Unfunded positions
-5%
$150,200
10
3
Service adjustments: Reduced support for public, longer
wait times for applicants, reduced Planning Commission
support
13
Community Dev./Accomplishments
• Completed General Plan update
• Processed Reynolds Ranch Shopping Center project
• Maintained plan -check goals 90% of the time
• Implemented Cost Analysis Study, adopted new fee
schedule for Building and Planning Divisions
• Performed fire plan review and inspection in
Community Development
• Transitioned from Urban County CDBG program
• Completed entitlements for senior housing project
at Roget Park
14
Community Dev,/ Emphasis
a Continue to achieve 90% cost recovery in the
Department
a I nitiate new Development Code
a Teach code update classes for Building Industry
Association and contractors and interested groups
a Assist Eden Housing in grant funding for senior housing
project
a Close out all CDBG projects funded through the Urban
County Program
a Plan Check and Inspect the Reynolds Ranch buildings
15
CDBG Fund
FY 2010/11 budget
FY 2009/10 budget
$1)1601610
$751,256
16
Library
Fund Balance
Beginning Fund Balance Unreserved
Revenues
Expenditures
Net Difference (Revenues Less Expenditures)
Fund Balance
Ending Fund Balance Unreserved
659,572 685,687
79,758 11,903 9,974
1,764,025 1,573,856 1,453,901 1,692,009 1,452,700
1,737,910 2,247,640 1,667,519 1,693,938 1,427,930
26,115 (673,784) (213,618) (1,929) 24,770
685,687 11,903 (133,860) 9,974 34,744
17
Fund balance history
800,000a�a�
Library Fund Balance
700,000
�4
600,000
500,000—
�
E i �' 3
5��t- �d,�'-` Y y � v °- o�� s� � �r-r/ .�i
R
,✓
400 000411''�
300 000
ifr
�i S
f •C^+ lg l 3`hY, Y'f cl „�
200 000
100,000
(�` � ssk; r ..,
a�� PC �r�Y
4
� .."_ �_
2.�, , s•..T., �.................. �..,.. ,. �����•
0
_ .. ,z
. «e2+ +a. .v'�0x4+ .
...��w .,.1 ..
.
2004-05
2005-06 2006-07 2007-08 2008-09 2009-10 2010-1 1
1
FY 2010/11 budget
FY 2009/10 budget
Change
General Fund support
Funded positions FY 10/11
Unfunded positions
$1,427,930
$1,667,519
($239,589) -14%
$1,349,180
12
F
Service adjustments: Less customer support, reduced
public hours
19
Library/Accomplishments
• Completed Phase I of Library Renovation
Project
. Public survey to determine public interest,
satisfaction and suggestions
. Maintained service standards despite
decreased hours
. Continued development of technology and
strategic plans
20
Library/Emphasis
. Maintain commitment to reading, literacyand
learning
• Continue to develop targeted marketing
strategies
. Re -institute Computer Learning Center
• Work toward completion of Phase II
renovation
. Establish stronger partnership with LUSID
21
zz BOE) 6uipnlDxa '@DUeleq qs2:) JeDOJ
6VO £88 8 669 Z£Z Z4 606`699`£4 £0G`£00`ZG M'6££ 44 03uele8 yseO 6uipu3
0auele8 yseO
(099`6ti£`£) 969`6ZZ 060`189 61ti`£99 Oti£`114`9
0Z6`8G9`9L 6ZZ`ZZZ`£L OZ£`£9£`£L W't9OU 041`999`£9
OLZ`69Z`£L 9Z8`G9ti`£L OW096`£L 9L9`LG£`9£4 090`ti£L`69
669`Z£Z`Z G EOCEOOK 6 WZLO`£ 4 tiZ9`6££` G 4 vsz'z 4`9
(s0an}ipuedx3 ssel senueneb) 83=8111a ION
seanlipuedx3
senUeA@�
0auele8 yseO 6uiuu1688
03ueIe8 yseO
Electric Utility
Fund balance history
Electric Utility Enterprise Fund Balance
23
hl
III illigl;j III
fifll
23
KIII,Electric Utility
FY 2010/11 budget
FY 2009/10 budget
Change
Funded positions FY 10/11
Unfunded positions
$76,618,920
$72,634,564
$3,984,356 5%
6111
1
24
Electric Utility/Accomplishments
• Completed Phase II development work for Lodi Energy
Center
• Lodi Energy Center received CEC permit, completed
Phase III agreements, closed financing
. Continued CEQA review of Westside 60kV Power Line
. Successfully demonstrated cable rejuvenation by
injection
. Applied for Moods rating
Drafted New Sales Tax Economic Development Rate
. Obtained American Recovery and Reinvestment Act
stimulus funding for local energy programs
25
,,�Eledlric Utility/Emphasis
• Accelerate maintenance and replacement
• Begin construction on Lodi Energy Center
• Begin fuel acquisition for Lodi Energy Center
• Complete installation of remote -read meters for all
residences and some businesses. Begin installation
of fixed network to receive meter data
• Complete environmental work on Westside 60kV
Transmission Project
• Complete environmental and engineering work for
development of new Westside Substation
26
FY 2010/11 budget
FY 2009/10 original budget
Change
General Fund ratio
Funded positions FY 10/11
Unfunded positions
$15,970,480
$14,955,058
$1,015,422 6.8%
12
39.2%
113
Unfunded sworn positions 5
Service adjustments: Less proactive policing, reduced bike patrol &
parking enforcement, reduction in admin staff, longer waits for public,
PALS staffing Animal Shelter Office 27
Police Department/Accomplishments
. Completed Quality of Service Survey
• Completed implementation of OSSI Sungard System
. Awarded COPS Grant to fund 4 new police officer
positions for 3 years
. Awarded $285,000 in state and federal grant funding
• Developed crime alert system for Neighborhood
Watch
• Animal Shelter Office now being managed by PALS
• Completed majority of Animal Shelter improvements
• Increased proactive activities
• Community Improvement developed Mobile Vendor
Program
Police Department/Emphasis
. Continue focus on vision of a safe and secure
community
. Increase Neighborhood Watch
• Problem locations/offenders
• Community Improvement outreach
• Implementing aspects of strategic plan
• Enhance community outreach through website and
social networking sites
• Re-establish participation in National Night Out
29
FY 2010/11 budget
FY 2009/10 original budget
Change
General Fund ratio
Funded positions FY 10/11
Unfunded positions
$9,125,280
$8,696,662
$428,618 4.9%
22.4%
•1
EJI
Service adjustments: Apparatus brownouts, reduced
number of firefighters on duty, reduction in fire
prevention, public education and inspection services
30
Fire Department/Accomplishments
. Homeland Security grant for Radio
Infrastructure
. Implement Mobile Computer Terminals
. I n service OES Engine- 3 State deployments in
2009
. Implemented approved fees for annual
inspections
31
Fire Department/Emphasis
• Seek grant funding
• Complete Master Radio communications upgrades
• Meet six -minute response goal at least 90 percent of
time
• Work to reduce overtime/CTO expenses and address
Fire Prevention
• Adoption of 2010 California Fire Code with
amendments
. Work to reduce the number of engine brownouts
32
Public
orks (General Fund)
FY 2010/11 budget
FY 2009/10 original budget
Change
General Fund ratio
Funded positions FY 10/11
Unfunded positions
$1,709,690
$1,920,501
($210,811) -13%
4%
i ICA
L
33
Public WorkS/Accomplishments
!Ci ^b: ..... �.S:G4. f�Wul�.f,,ue�.,'�. �tv..�,w 5's'.hr.. ',.x..: •,..� .,
• Water meter program started
• Usage based water and wastewater rates
• Infrastructure replacement projects continued
• Harney Lane Specific Plan design project
• Lodi Avenue project construction
• Library remodel projects completed
• Street overlays of Ham Lane &Vine Street
. PCE/TCE Central Plume cleanup construction
. Transit services contracted to fit budget constraints
. Water treatment plant design completed
4M
� Public Works/Emphasis
• Update Impact: Mitigation Fee Program & Utility master
plans
• Surface Water Treatment Plant
. 5,500 new water meters
. Storm drainage facilities at De6enedetti Park
Photovoltaic power to Transit Maintenance Facility
35
� Public Works/Water Utility
Utiiity Enterprise Fund
Cash Balance
Beginning Cash Balance (475,262) 13,434,921 15,761,074 20,272,801 24,717,657
Revenues 23,293,009 17,343,265 14,186,738 13,992,174 12,741,980
Expenditures 9,382,826 10,505,385 22,810,040 9,547,318 11,528,790
Net Difference (Revenues Less Expenditures) 13,910,183 6,837,880 (8,623,302) 4,444,856 1,213,190
Cash Balance
Ending Cash Balance 13,434,921 20,272,801 7,137,772 24,717,657 25,930,847
36
Public Works/Water Utility
Fund balance history
30,000,000
25, 000, 00
20,000,000
15, 000, 000
10,000,000
5,000,000
Z
-5,000,000
Water Utility Fund Balance
2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11
Public Works/Water Utility
FY 2010/11 budget $11,528,790
FY 2009/10 original budget $12,500,365
Change ($971,r575) -8%
Funded positions FY 10/11 (Water & WW) 43
Unfunded positions 0
Public Works/Wastewater
Cash Balance
Beginning Cash Balance 4,956,069 6,766,472 4,568,929 7,499,323 6,077,513
Revenues
Expenditures
Net Difference (Revenues Less Expenditures)
Cash Balance
Ending Cash Balance
38,421,977
11,146,850
15,572,730
15,433,571
17,054,390
36,611,574
10,413,999
18,345,451
16,855,381
14,194,540
1,810,403
732,851
(2,772,721)
(1,421,810)
2,859,850
6,766,472 7,499,323 1,796,208 6,077,513 8,937,363
39
Public Works/Wastewater
Fund balance history
10,000,000
9,000,000
8,000,000
7,000,000
6,000,000
5,000,000
4,000,000
3,000,000
2,000,000
1,000,000
0
Wastewater Utility Fund Balance
2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-1 1
Public Works/Wastewater
FY 2010/11 budget
FY 2009/10 original budget
Change
$14)194)540
$16)343)361
($2)148,821) -13%
41
Public
orks/Transit
Fund Balance (Net Assets)
Beginning Fund Balance (Net Assets) Unreserved
1,445,398
1,883,660
1,856,155
1,826,897
2,165,636
Revenues
4,391,974
4,844,254
4,232,831
4,072,817
6,624,560
Expenditures
3,953,712
4,901,017
4,483,657
3,734,078
6,113,210
Net Difference (Revenues Less Expenditures)
438,262
(56,763)
162,386
338,739
511,350
Fund Balance (Net Assets)
Ending Fund Balance (Net Assets) Unreserved 1,883,660 1,826,897 2,018,541 2,165,636 2,676,986
42
Public
/Transit
Fund balance history
43
1 -, ,-�
v�
t�.
x �•��,���
�7
`il
�Y
f,�
,��
cif
43
,,,� Public Works/Transit
FY 2010/11 budget
FY 2009/10 budget
Change
Funded positions FY 10/11
Unfunded positions
$6,113,210
$4,070,445
$2,042,765 50%
CEI
Public Works/Streets & Drainage
a MIR "I' M, ",I .
Fund Balance
Beginning Fund Balance Unreserved 6,546,231 7,907,130 8,512,374 7,443,639 7,035,734
Revenues
Expenditures
Net Difference (Revenues Less Expenditures)
Fund Balance
Ending Fund Balance Unreserved
5,612,485
4,054,484
5,754,174
4,688,909
4,940,150
4,251,586
4,517,975
8,137,000
5,096,814
5,903,360
1,360,899
(463,491)
(2,382,826)
(407,905)
(963,210)
7,907,130 7,443,639 6,129,548 7,035,734 6,072,524
45
Public Works/Streets Drainage
Fund balance history
9,000,000
8,000,000
7,000,000
6,000,000
5,000,000
4,000,000
3,000,000
2,000,000
1,000,000
0
Street Fund Balance
2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-1 1
m
Public Works/Streets & Drainage
FY 2010/11 budget
FY 2009/10 budget
Change
Funded positions FY 10/11
Unfunded positions
$5,903,360
$3,017,491
$2,885,869
X• ' •
20
0)
Service Adjustments: Proposing the layoff of 2 positions —
Tree Operations Supervisor and Streets Maintenance
Worker III
47
Public Works/Fleet Services
Fund Balance (Net Assets)
Beginning Fund Balance (Net Assets) Unreserved
Revenues
Expenditures
Net Difference (Revenues Less Expenditures)
Fund Balance (Net Assets)
Ending Fund Balance (Net Assets) Unreserved
8,472 8,472
1,090,871 1,240,230 1,960,170 1,897,467 2,052,770
1,090,871 1,231,758 1,960,170 1,897,467 2,052,770
8,472
8,472 8,472 8,472
Public
/Fleet Services
FY 2010/11 budget
FY 2009/10 original budget
Change
Funded positions FY 10/11
Unfunded positions
$2,052,770
$1,960,170
$92,600 5%
lip
EI
Internal Services
Budget& Treasury, Financial Services,
Human Resources, Information Systems
t
FY 2010/11 budget $3,411,600
FY 2009/10 budget $3,667,493
Change ($255,893) -7%
General Fund ratio 9%
Funded positions FY 10/11 30
Unfunded positions S
50
Internal Services/Accomplishments
• Published 2009/10 Budget and Budget -in -Brief
. Received clean audit opinion and GFOA Award
for Excellence in Financial Reporting
• Implemented pay station payment options
• Updated policies, procedures and practices
• Variety of supervisory and managerial skill
building forums
. Secured Homeland Security and ARRA grants
for Radio system and server upgrades
51
c Internal Services/Emphasis
Monitor economic conditions and adjust budget if
needed
O Complete upgrade of JDE to current version
O Finish updates to Admin. Policy & Procedures,
Personnel Rules and Employer -Employee Relations
document
Continue to provide supervisory training workshops
• Establish banking services contract
Implement metered water billing
Implement A-87 Cost Allocation Plan
52
Non -D
FY 2010/11 budget
FY 2009/10 budget
Change
General Fund ratio
rtmental
*Excluding Onetime Funds
$5,997,130*
$6,232,858
($235,728) -4%
I5%
53
City Clerk
FY 2010/11 budget
FY 2009/10 budget
Change
General Fund ratio
Funded positions FY 10/11
Unfunded positions
$606,100
$546,606
$59,494 11%
1%
Ell
0
54
irk/Accom plishments
�+r��aysx•,aex�sm�a:c+xa�n czar.�s.use;r.n,^�rx�ssw�ax+.,rxsux� .,, ...
. Completed ordinance subsection of e -Records from
City's incorporation to the present
• Created and implemented Electronic Contracts Database
for all City contracts/agreements
Ensured compliance with Political Reform Act through
campaign statement filings
55
City Clerk/Emphasis
• Conduct November Z 2010 General Municipal Election
• Administer FPPC campaign disclosure statements for
candidate -controlled committees and PACs
• Update Bi -annual Conflict of Interest Code
• Ensure AB 1234 Compliance for Elected Officials
56
City Attorney
FY 2010/11 budget
FY 2009/10 budget
Change
General Fund ratio
Funded positions FY 10/11
Unfunded positions
$468,150
$462,890
$5,260 1
1%
C
57
City Attorney/Accomplishments
• Negotiated and secured PCE clean-up agreements with land
owners
• Arbitrated dismissal of employee discipline appeal and assisted
with multiple Public Employees Relations Board (PERB)
complaints
• Drafted Mobile Food Ordinance, medical marijuana moratorium,
and Skate Park ordinance
• Managed Wastewater Discharge Permit appeal and assisted with
Central Valley City Water Association writ
• Implemented new CPI indexing for Enterprise Funds
• Drafted and negotiated multiple agreements related to Lodi
Energy Center and managed White Slough clean-up activities
City Attorney/ Emphasis
. Enforce code compliance through court action
. Drift massage and medical marijuana
ordinances
. Develop wastewater expertise and assist with
permit approval and Central Valley City Water
Association litigation
■ Continue workinq with Human Resources to
resolve contract, -grievances and discipline
issues
W
�, City Manager
FY 2010/11 budget
FY 2009/10 budget
Change
General Fund ratio
Funded positions FY 10/11
Unfunded positions
$564,600
$538,610
$25,990
5%
1%
on
City Manager/ Accomplishments
• Completed the General Plan
• Negotiated with bargaining groups to meet budgetary
challenges
• Developed a Capital Improvement Program
• Negotiated favorable terms associated with the Lodi
Energy Center
• Hired a Fire Chief and Electric Utility Director
61
City Manager/Emphasis
. Implement policies associated with the recently
adopted General Plan
. Proactively respond to economic conditions to
maintain financial viability
• Hire permanent City Manager and Police Chief
FY 2010/11 budget
FY 2009/10 budget
Change
General Fund ratio
velopment
$583,050
$556,527
$26,523 5%
1%
63
� Economic Development programs
. Visit Lodi! Conference &Visitors Bureau ($76,000)
• San Joaquin Partnership ($30,000)
• Lodi District Chamber of Commerce ($2,120)
• Fireworks ($16,000)
. SJC Enterprise Zone administration ($22,500)
• Downtown Lodi Business Partnership ($28,500)
. Arts grants ($42,500)
Econ. Develop./Accomplishments
. Held downtown summit and pursuing
resulting recommendations
. Assisted with ensuring that a General Motors
dealership successfully appealed its closure
. Moving forward with the Reynolds Ranch
development and have received applications
from Costco and Home Depot
■ Kohl's opened informer Mervyns location
65
� Econ. Development/Emphasis
. Promote concept of "green" business incubator
and work to attract alternative energy start-ups
. Expand visitor opportunities downtown
• Continue funding local economic development
organizations
• Continue to recruit additional retailers
. Promote new development opportunities
resulting from revised General Plan