HomeMy WebLinkAboutAgenda Report - May 18, 2011 C-03AGENDA ITEM
AN CITY OF LODI
' COUNCIL COMMUNICATION
Im
AGENDA TITLE: Approve Plans and Specifications and Authorize Advertisement for Bids for
2011 Alley Reconstruction Project
MEETING DATE: May 18,2011
PREPARED BY: Public Works Director
RECOMMENDED ACTION: Approve plans and specifications and authorize advertisement for
bids for 2011 alley reconstruction project.
BACKGROUND INFORMATION: This project will consist of the reconstruction of the alley north of
Tokay Street from Stockton Street to Washington Street and the
alley north of Eden Street from Washington Street to Garfield Street
with 756 tons of asphalt concrete and the installation of 1,790 lineal
feet of pervious concrete alley gutter and 368 lineal feet of 1O -inch storm drain. The location of the alleys
to be reconstructed is provided in Exhibit A.
The alleys planned for reconstruction were selected based on field review of the eastside alleys. These
alleys appear to have the most severe drainage and pot holes problems from the site survey. The City
will be using Community Development Block Grant (CDBG) funds to reconstructthe alleys with new
asphalt concrete pavement and pervious concrete alley gutter. The pervious alley concrete gutter was
used in last year's alley reconstruction project and has proven to enhance the alley storm water drainage.
Site visits after rain storms showed no signs of water ponding problems in the improved alleys.
The plans and specifications are on file in the PublicWorks Department. The planned bid opening date
is June 29, 2011. The project estimate is $280,000.
FISCAL IMPACT: The project will reduce the maintenance costs in the reconstructed alleys.
FUNDING AVAILABLE: The money for this project will becoming from Community Development
Block Grant (CDGB) funds.
%41aAl� )Ianllat
F. -Wally SAhdelin
Public Works Director
Prepared by Lyman Chang, Senior Civil Engineer
FWS/LC/pmf
Enclosure
cc: Neighborhood Services Manager
Senior Civil Engineer Chang
APPROVED:
V Konradt Bartlam, City Manager
KAMTROJECTS\STREETS\201 1AIIeyReconstruction\CPS&A.doc 4/28/2011
n CITY OF LODI
• s1 PUBLICWORKSDEPARTMENT
MNE RIVER
'OU
44
O
3�p L DI
LAK
w \
J
_J \
\
LOCKEFORD ST \ �\
ELM ST
LODI AVE
HARNEY LANE
z
J
Q
2
CENTURY BLVD
EXHIBIT A
VICINITY MAP
2011 ALLEY RECONSTRUCTION
Alley N/Tokay, Stockton to Washington
Alley N/Eden, Washin,gton to Garfield
T
TO
SACRAMENTO
33 MI.
rn
I
I
I
I
I
I
IN
I�
z
J
W
Y
O
U
0
am
TO
STOCKTON
10�M1.
TURNER RD I�
I
I
I
S.P.R.R. I VICTOR RD.
HWY. 12
> I
Q
tL
I
I
I
PROJECT LOCATION
I
UI
UI
0 1/8 1/4 3/8 1/2 MILE
0 1000 2000 3000 FEET
G
�-
3TAYLOR RD
TO
HWY.
LO2WS S
1
KETTLEMAN LN
E I-5
5 MI.
O
Z
ujuj
a
ir
w
3
O
J
HARNEY LANE
z
J
Q
2
CENTURY BLVD
EXHIBIT A
VICINITY MAP
2011 ALLEY RECONSTRUCTION
Alley N/Tokay, Stockton to Washington
Alley N/Eden, Washin,gton to Garfield
T
TO
SACRAMENTO
33 MI.
rn
I
I
I
I
I
I
IN
I�
z
J
W
Y
O
U
0
am
TO
STOCKTON
10�M1.
TURNER RD I�
I
I
I
S.P.R.R. I VICTOR RD.
HWY. 12
> I
Q
tL
I
I
I
PROJECT LOCATION
I
UI
UI
0 1/8 1/4 3/8 1/2 MILE
0 1000 2000 3000 FEET