HomeMy WebLinkAboutAgenda Report - April 20, 2011 C-03AGENDA ITEM C 05 fib CITY OF LODI COUNCIL COMMUNICATION Im AGENDA TITLE: Approve Request for Proposals and Authorize Advertisement for Final Design and Construction of Municipal Service Center (MSC) Transit Vehicle Maintenance Facility Solar Power Project MEETING DATE: April 20, 2011 PREPARED BY: Public Works Director RECOMMENDED ACTION: Approve request for proposals and authorize advertisement for final design and construction of Municipal Service Center (MSC) Transit Vehicle Maintenance Facility solar power project. BACKGROUND INFORMATION: At its May 6, 2009 meeting, City Council accepted the Short Range Transit Plan which included the Transit Vehicle Maintenance Facility solar power project. Since then, staff has finished space planning, technical specifications and schematic design drawings to complete a set of "Bridging Documents"for the project, which will be funded by the federal American Recovery and ReinvestmentAct of 2009. The bridging documents will be used by a contractor/design team to complete the design and construct the new facility. The next phase in the project is to request proposals for the selection of the contractor/design team. The project includes approximately 5,300 square feet of roof space for mounting 240 photovoltaic solar panels to provide 56.4 Kilowatt Standard Test Conditions (KWSTC) of electrical power. The structure will also serve as a protective cover for the material storage bunkers adjacent to the Transit Vehicle Maintenance Facility. Electricity generated by the new facility will help offset electrical costs at the Transit Vehicle Maintenance Facility. A qualification process is included to determine eligible contractor/design teams and ensure they have the necessary experience to perform the work. The proposals require a guaranteed maximum price for the design and construction of the project. The bridging documents provide a framework for the contractor/design team to build the facility to the City's specifications. The bridging documents include basic plans and detailed performance specifications, which were developed by City staff. The selected contractor/design team will complete the facility design, obtain the building permit and constructthe facility. Staff will seek Council approval of the successful contractor/design team selection. The request for proposals is on file in the Public Works Department. FISCAL IMPACT: Failure to award the contract could result in the loss of the funding of approximately $1,000,000 for construction of the facility. FUNDING AVAILABLE: Funding is from the American Recoveryand ReinvestmentAct (125091). F. Wally Sartaelin Public Works Director Prepared by Gary R. Wirnan, Construction Project Manager FWS/GW/pmf cc: Paula J. Fernandez, Transportation Manager APPROVED: Konradt t gram, City Manager K:\WP\PROJECTS\TRANSMMSC NMF Solar Structure Project= APSA,doc 0411212011