HomeMy WebLinkAboutAgenda Report - April 7, 2010 D-09AGENDA ITEM 0�bcl
fih CITY OF LODI
,. COUNCIL COMMUNICATION
Im
AGENDA TITLE: Adopt Resolution Awarding Contractfor Lodi GrapeLine Bus Stop Improvementsto
Mo/Jas Construction Company, of Stockton ($35,314)
MEETING DATE: April 7, 2010
PREPARED BY: Public Works Director
RECOMMENDED ACTION: Adopt a resolution awarding the contractfor the Lodi GrapeLine Bus
Stop Improvementsto Mo/Jas Construction Company, of Stockton,
in the amount of $35,314.
BACKGROUND INFORMATION: This project consists of constructing improvementsto 18 bus stop
locations on Lodi's fixed -route bus system at various locations. Bus
shelters with benches will be installed at six locations, and benches
will be provided at nine other locations, At three locations concrete
will be placed behind the sidewalk and the existing benches will be moved to providefor a wider
pedestrian path of travel. The 18 locations are shown in ExhibitA. After these improvements are
constructed, there will be 144 remaining bus stop locations without shelters. Improvementsto
approximately 10 to 20 additional bus stop locations are planned using $100,000 in federal funds
(American Recovery and ReinvestmentAct) recently approved by the City Council.
Staff is recommending that Council waive an informality in the bid proposal from Mo/Jas Construction
and award the Lodi GrapeLine Bus Stop Improvements contract to this contractor. Mo/Jas Construction
did not include a Receipt of Addendum No. 1 as part of its bid proposal. The missing Receiptof
Addendum was caused by the purchase of an incomplete set of plans and specifications from
Stockton Blue Reprographics. This incomplete set did not include Addendum No.1 nor did it include the
Receipt of Addendum form. As a result, the Receipt of Addendum No. 1 was not included with the bid
proposal from Mo/Jas Construction. Other bidders received the complete bid package. Addendum No. 1
provided the bidders with an updated schedule of federal wage rates and gave the bidders approximate
weights for the material that needed to be transferred to the bus stop locations. As the updated federal
wage rates only revised pay rates for non-relatedjob classifications (i.e. asbestos workers and plumbers)
and for job classifications outside of San Joaquin County, staff feels that Addendum No. 1 had no impact
on the bid proposal prepared by Mo/Jas Construction.
Plans and specifications for this project were approved on February 3, 2010. The City received the
following 11 bids for this project on March 10, 2010.
Bidder
Engineer's Estimate
*Mo/Jas Const.
George Reed, Inc.
A.M. Stephens Construction
APPROVED:
K UP\PROJECTS\TRANSITSus stop improvements\CAward.doc
Location Bid
$ 41,050.00
Stockton $ 35,314.00
Lodi $ 40,395.00
Lodi $ 40,450.00
Blair King, Cit M ager
3/29/2010
Adopt Resolution Awarding Contractfor Lodi GrapeLine Bus Stop Improvementsto Mo/Jas Construction
Company, of Stockton ($35,314)
April 7 , 2010
Page 2
Bidder
Location
Bid
Quimu Contracting
Dixon
$
41,150.00
Diede Construction
Lodi
$
41,896.50
HartDev, Inc.
Stockton
$
44,753.00
G & L Brock Construction
Stockton
$
45,945.00
T & S Intermodal
Stockton
$
48,484.00
UDB Enterprises
Stockton
$
49,450.00
*C & R Construction Group
Sacramento
$
53,298.30
Dahl Taylor Associates
Santa Ana
$
57, 468.00
* No Receipt of Addendum was included with the Bid Proposal.
FISCAL IMPACT: There will be a slight increase in the long-term maintenance costs
associated with the installation of these new improvements.
FUNDING AVAILABLE: Federal Transit Administration/
Transportation DevelopmentAct Funds (125080) : $50,000
Jordan Ayers
Deputy City Manager/Internal Services Director
F. Wally ndelliin
Public Works Director
Prepared by Wesley K. Fujitani, Senior Civil Engineer
Attachment
cc: CityAttorney
Purchasing Officer
Streets and Drainage Superintendent
ManagementAnalystAreida-Yadav
Transportation Planner
K:\WP\PROJECTS\TRANSIT\Bus stopimprovements\CAward.doc 03/23/2010
OF
r O
CITY OF LODIPUBLIC WORKS DEPARTMENT
GRAPELINE
BUS STOP
LOCATIONS
uf
0
E
N R Elementary
K a a mezaox a�l , wme I I stood I PROPOSED BUS
d E y l Ati ° STOP
IMPROVEMENT
LOCATIONS
HARN Y LN
LODI TRANSIT
STATION
194 A901 . . AM
LODI GRAPELINE BUS STOP IMPROVEMENTS
VARIOUS LOCATIONS CONTRACT
CITY OF LODI, CALIFORNIA
THIS CONTRACT made by and between the CITY OF LODI, State of California, herein
referred to as the "City," and MO/JAS CONSTRUCTION, INC., herein referred to as the
"Contractor."
WITNESSETH:
That the parties hereto have mutually covenanted and agreed, and by these presents do
covenant and agree with each other, as follows:
The complete Contract consists of the following documents which are incorporated herein by
this reference, to -wit:
Notice Inviting Bids
Information to Bidders
General Provisions
Special Provisions
Bid Proposal
Contract
Contract Bonds
Plans
The July 2002 Edition,
Standard Specifications,
State of California,
Business and Transportation Agency,
Department of Transportation
All of the above documents, sometimes hereinafter referred to as the "Contract Documents,"
are intended to cooperate so that any work called for in one and not mentioned in the other is to
be executed the same as if mentioned in all said documents.
ARTICLE I - That for and in consideration of the payments and agreements hereinafter
mentioned, to be made and performed by the City and under the condition expressed in the two
bonds bearing even date with these presents and hereunto annexed, the Contractor agrees
with the City, at Contractor's cost and expense, to do all the work and furnish all the materials
except such as are mentioned in the specifications to be furnished by the City, necessary to
construct and complete in a good workmanlike and substantial manner and to the satisfaction
of the City the proposed improvements as shown and described in the Contract Documents
which are hereby made a part of the Contract.
ARTICLE II - The City hereby promises and agrees with the Contractor to employ, and does
hereby employ, the Contractor to provide all materials and services not supplied by the City and
to do the work according to the terms and conditions for the price herein, and hereby contracts
to pay the same as set forth in Section 5.600, "Measurement, Acceptance and Payment," of the
General Provisions, in the manner and upon the conditions above set forth; and the said parties
for themselves, their heirs, executors, administrators, successors and assigns, do hereby agree
to the full performance of the covenants herein contained.
ARTICLE III - The Contractor agrees to conform to the provisions of Chapter 1, Part 7, Division
2 of the Labor Code. The Contractor and any Subcontractor will pay the general prevailing
wage rate and other employer payments for health and welfare, pension, vacation, travel time,
CONTRACT. DOC I 03/16/2010
and subsistence pay, apprenticeship or other training programs. The responsibility for
compliance with these Labor Code requirements is on the prime contractor.
ARTICLE IV - And the Contractor agrees to receive and accept the following prices as full
compensation for furnishing all materials and for doing all the work contemplated and embraced
in this agreement; also for all loss or damage arising out of the nature of the work aforesaid or
from the action of the elements, or from any unforeseen difficulties or obstructions which may
arise or be encountered in the prosecution of the work until its acceptance by the City, and for
all risks of every description connected with the work; also for all expenses incurred by or in
consequence of the suspension or discontinuance of work and for well and faithfully completing
the work, and the whole thereof, in the manner and according to the Plans and Contract
Documents and the requirements of the Engineer under them, to -wit:
Perform the work necessary to install six bus shelters and sixteen benches at various bus stop
locations and other incidental and related work, all as shown on the plans and specifications for
"Lodi GrapeLine Bus Stop Improvements, Various Locations".
CONTRACT ITEMS
ITEM EST'D.
NO. DESCRIPTION UNIT QTY UNIT PRICE TOTAL PRICE
1. Bus Stop Improvements at
2420 West Kettleman Lane LS 1 $ 2,111.00 $ 2,111.00
2. Bus Stop Improvements at
North/West Corner of
Central Avenue and
Cypress Street LS 1 $ 2,026.00 $ 2,026.00
3. Bus Stop Improvements at
620 South Cherokee Lane LS 1 $ 2,111.00 $ 2,111.00
4. Bus Stop Improvements at
53 South Cherokee Lane LS 1 $ 2,026.00 $ 2,026.00
5. Bus Stop Improvements at
Ham Lane South of Vine Street LS 1 $ 2,026.00 $ 2,026.00
6. Bus Stop Improvements at
Hutchins Street North of
Vine Street LS 1 $ 2,204.00 $ 2,204.00
7. Bus Stop Improvements at
215 East Lodi Avenue LS 1 $ 2,475.00 $ 2,475.00
Contract.DOC 2 03/16/10
ITEM EST'D.
NO DESCRIPTION UNIT QTY UNIT PRICE TOTAL PRICE
8.
Bus Stop Improvements at
South/West Corner of
Lodi Avenue and
Lower Sacramento Road
LS
9.
Bus Stop Improvements at
North/East Corner of
Hutchins Street and
Century Boulevard
LS
10.
Bus Stop improvements at
Hutchins Street North of
Mendocino Drive
LS
11.
Bus Stop Improvements at
Hutchins Street North of
Chestnut Street
LS
12.
Bus Stop Improvements at
Stockton Street North of
Almond Drive
LS
13.
Bus Stop Improvements at
Hutchins Street South of
Kettleman Lane
LS
14.
Bus Stop Improvements at
Lockeford Street West of
Crescent Avenue
LS
15.
Bus Stop Improvements at
Lower Sacramento Road South
of Tejon Street
LS
16.
Bus Stop Improvements at
Elm Street (Westbound) West of
Ham Lane
LS
Contract.DOC
1 $ 4,724.00 $ 4,724.00
1 $ 4,368.00 $ 4,368.00
1 $ 802.00 $ 802.00
1 $ 802.00 $ 802.00
1 $ 802.00 $ 802.00
1 $ 802.00 $ 802.00
1 $ 1,608.00 $ 1,608.00
1 $ 802.00 $ 802.00
1 $ 1,754.00 $ 1,754.00
3 03116110
ITEM EST'D.
NO. DESCRIPTION UNIT QTY UNIT PRICE TOTAL PRICE
17. Bus Stop Improvements at
Elm Street (Eastbound) West of
Ham Lane LS 1 $ 2,026.00 $ 2,026.00
18. Bus Stop Improvements at
Lockeford Street West of
Ham Lane LS 1 $ 1,845.00 $ 1,845.00
TOTAL $35,314.00
ARTICLE V - By my signature hereunder, as Contractor, I certify that I am aware of the
provisions of Section 3700 of the Labor Code, which requires every employer to be insured
against liability for workers' compensation or to undertake self-insurance in accordance with the
provisions of that code, and I will comply with such provisions before commencing the
performance of the work of this contract.
ARTICLE VI - It is further expressly agreed by and between the parties hereto that, should
there be any conflict between the terms of this instrument and the Bid Proposal of the
Contractor, then this instrument shall control and nothing herein shall be considered as an
acceptance of the said terms of said proposal conflicting herewith.
ARTICLE VII - The City is to furnish the necessary rights-of-way and easements and to
establish lines and grades for the work as specified under the Special Provisions. All labor or
materials not mentioned specifically as being done by the City will be supplied by the Contractor
to accomplish the work as outlined in the specifications,
ARTICLE VIII - The Contractor agrees to commence work pursuant to this contract within 15
calendar days after the City Manager has executed the contract and to diligently prosecute to
completion within 20 WORKING DAYS.
WHEN SIGNING THIS CONTRACT, THE CONTRACTOR AGREES THAT THE TIME OF
COMPLETION FOR THIS CONTRACT IS REASONABLE AND THE CONTRACTOR AGREES
TO PAY THE CITY LIQUIDATED DAMAGES AS SET FORTH IN SECTION 6-04.03 OF THE
SPECIAL PROVISIONS. CONTRACTOR AGREES THAT THIS AMOUNT MAY BE
DEDUCTED FROM THE AMOUNT DUE THE CONTRACTOR UNDER THE CONTRACT.
Contract.DOC 4 03/16/10
IN WITNESS WHEREOF, the parties to these presents have hereunto set their hands the year
and date written below.
CONTRACTOR: CITY OF LODI
By:
Blair King
City Manager
By: Date:
Title
(CORPORATE SEAL)
Attest:
City Clerk
Approved As To Form
D. Stephen Schwabauer
ney
Contract. DOC 5 03/16/10
RESOLUTION NO. 2010-39
A RESOLUTION OF THE LODI CITY COUNCIL WAIVING
INFORMALITY IN BID PROPOSAL AND AWARDING CONTRACT FOR
LODI GRAPELINE BUS STOP IMPROVEMENTS
WHEREAS, in answer to notice duly published in accordance with law and the order of this City
Council, sealed bids were received and publicly opened on March 10, 2010, at 11:00 a.m. for the Lodi
GrapeLine Bus Stop Improvements described in the plans and specifications therefore approved by the
City Council on February 3,2010; and
WHEREAS, said bids have been checked and tabulated and a report thereof filed with the City
Manager as follows:
Bidder
Bid
*Mo/Jas Construction
$
35,314.00
George Reed, Inc.
$
40,395.00
A.M. Stephens Construction
$
40,450.00
Quimu Contracting
$
41,150.00
Diede Construction
$
41,896.50
HartDev, Inc.
$
44,753.00
G & L Brock Construction
$
45,945.00
T & S Intermodal
$
48,484.00
UDB Enterprises
$
49,450.00
*C & RConst. Group
$
53,298.30
Dahl Taylor Associates
$
57,468.00
* No Receipt of Addendum was included with the Bid Proposal
WHEREAS, Mo/Jas Construction did not include a Receipt of Addendum No. 1 as part of its bid
proposal, due to the purchase of an incomplete set of plans and specifications from Stockton Blue
Reprographics. Addendum No. 1 provided the bidders with an updated schedule of Federal wage rates
and gave the bidders approximate weights for the material that needed to be transferred to the bus stop
locations. As the updated Federal wage rates only revised pay rates for non-relatedjob classifications
(i.e. asbestos workers and plumbers) and forjob classifications outside of San Joaquin County, staff feels
that Addendum No. 1 had no impact on the bid proposal prepared by Mo/Jas Construction; and
WHEREAS, staff recommends waiving the bid informality and awarding the contract for the Lodi
GrapeLine Bus Stop Improvementsto the low bidder, Mo/Jas Construction, Inc., of Stockton, California.
NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council does hereby waive the bid
informality and award the contract for the Lodi GrapeLine Bus Stop Improvements to the low bidder,
Mo/Jas Construction, Inc., of Stockton, California, in the amount of $35,314.00.
Dated: April 7, 2010
--------------------------------------------------------------------------------
--------------------------------------------------------------------------------
I hereby certify that Resolution No. 2010-39 was passed and adopted by the City Council of the City
of Lodi in a regular meeting held April 7, 2010, by the following vote:
AYES: COUNCIL MEMBERS — Hansen, Hitchcock, Johnson, and Mayor Katzakian
NOES: COUNCIL MEMBERS — None
ABSENT: COUNCIL MEMBERS — Mounce
ABSTAIN: COUNCIL MEMBERS — None
HL
City Clerk
2010-39