Loading...
HomeMy WebLinkAboutAgenda Report - April 6, 2011 C-07AGENDA ITEM CITY OF LODI ,. COUNCIL COMMUNICATION AGENDA TITLE: Adopt Resolution Authorizing City Managerto Execute Contract for 2011 Streets Crack Sealing Projectwith American Asphalt Repair and Resurfacing Company, of Hayward ($42,788.13) MEETING DATE: April 6, 2011 PREPARED BY: Public Works Director RECOMMENDED ACTION: Adopt resolution authorizing City Managerto execute contract for 2011 streets crack sealing project with American Asphalt Repairand Resurfacing Company, of Hayward, in the amount of $42,788.13. BACKGROUND INFORMATION: This project consists of crack sealing approximately 1,500,000 square feet of various City streets. The primary cause of asphalt failure is water infiltration into the street subgrade. Crack sealing is one of the most cost-effective preventative maintenance practices, but the work can only be performed during the warm summer months. In an effortto seal as much street area as possible over this short timeframe, this work will supplement crack sealing performed by City crews. Plans and specifications for this project were approved on February 16, 2011. The City received the following six bids for this project on March 16, 2011. Bidder Location Bid Engineer's Estimate $ 50,000.00 American Asphalt Repair and Resurfacing Company Hayward $ 42,788.13* Rubberized Crackfiller Sealant, Inc. Fullerton $ 44,204.00 Graham Contractors, Inc. San Jose $ 44,343.87* Valley Slurry Seal Company West Sacramento $ 52,208.92* California Pavement Maintenance Company Sacramento $ 79,854.37* Intermountain Slurry Seal Company Sacramento $ 120,654.96 *Corrected total FISCAL IMPACT: By increasing the crack sealing effort, the useful life of the City streets will be extended. FUNDING AVAILABLE: Measure K Maintenance Funds (325028): $50,000 Jordan Ayers Deputy City Manager/Internal Services Director F. Wally Syfdelin PublicWorks Director Prepared by Curt Juran, Streets and Drainage Superintendent FWS/CJ/pmf cc: Deputy Public Works Director— Utilities Streets and Drainage Superintendent APPROVED: KAWMCOUNCIL12011 WwardStreetsCrackSealing.doc Bartlam, City Manager 3/17/2011 201 1 CRACK SEALING VARIOUS CITY STREETS CONTRACT THIS CONTRACT, made by and between the CITY OF LODI, State of California, herein , referred to as "City"and AMERICAN ASPHALT REPAIR AND RESURFACING COMPANY herein referred to as "Contractor". WITNESSETH: That the parties hereto have mutually covenanted and agreed, and by these presents do covenant and agree with each other, as follows: The complete contract consists of the following documents, which are filed in the Public Works Department, and which are incorporated herein by this reference, to -wit: Notice Inviting Bids Information to Bidders General Provisions Special Provisions Bid Proposal Contract Vicinity Map The July 1992 Edition Standard Specifications, State of California Business and Transportation Agency, Department of Transportation All of the above documents, sometimes hereinafter referred to as the "Contract Documents," are intended to cooperate so that any work called for in one and not mentioned in the other is to be executed the same as if mentioned in all said documents. ARTICLE I That for and in consideration of the payments and agreements hereinafter mentioned, the Contractor agrees with the City, at Contractor's cost and expense, to do all the work and furnish all the materials except such as are mentioned in the specifications to be furnished by the City, necessary to maintain in a good workmanlike and substantial manner to the satisfaction of the City the proposed maintenance of landscaped areas. ARTICLE 11 The Contractor agrees to conform to the provisions of Chapter 1, Part 7, Division 2 of the Labor Code. The Contractor and any Subcontractor will pay the general prevailing wage rate and other employer payments for health and welfare, pension, vacation, travel time, and subsistence pay, apprenticeship or other training programs. The responsibility for compliance with these Labor Code requirements is on the prime contractor. ARTICLE III And the Contractor agrees to receive and accept the following prices as full compensation for furnishing the work contemplated and embraced in this agreement; also for all loss or damage arising out of the nature of the work aforesaid or from the action of the elements, or from any unforeseen difficulties or obstructions which may arise or be encountered in the prosecution of the work until it's acceptance by the City, and for all risks of every description connected with the work; also for all expenses incurred by or in consequence of the suspension or discontinuance of work; and for well and faithfully completing the work, and the whole thereof, in the manner and according to the Contract Documents and the requirements of the Engineer under them, to -wit: ARTICLE IV By my signature hereunder, as Contractor, I certify that I am aware of the provisions of Section 3700 of the Labor Code, which requires every employer to be insured KAWP\C0UNCIL\2011\2011 Crack Sealing Contract.doc 1 03/16/2011 against liability for Workers' Compensation or to undertake self-insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this contract. Road NameI From Address I To Address I I Approximate price per Street area SQ FT Cherry St. Garfield St. W/O Central. 27,720 $831.60 Eden St. Stockton St. Garfield St. 89,692 $2,690.76 Mission St, Stockton St. Garfield St. 56.508 $1,695.24 Redwood St. I Washington St. I Stockton St. I 19,800 I $594.00 I Watson St. I Washington St. I Stockton St. I 31,656 I $949.68 Wellswood Av. Vine St. I S END 28,350 $850.50 I Voelker Dr. I Kettleman Ln. I END 12,460 I $373.80 I Voyager Dr. I Culbertson Dr. I Oriole Ln. I 45,255 I $1,357.65 I Woodrow PI. I Woodrow St. W END I 2,832 $84.96 I Woodrow St. Hale St. Delores St. 53,909 I $1,617.27 I Arlington Dr. I Hampton Dr. I Huntington Dr. I 18,360 I $550.80 Atherton Dr. I Iris Dr. N END I 39,204 $1,176.12 Ash Dr. Cardinal St. I Park St. 51,345 $1,540.35 Cardinal St Ham Ln Ash Dr 42,000 $1,26000 -park St Downing Dr Ham Ln 51,310 $1,53930 Bordeau Dr Zinfandel Dr Burgundy Dr 14,105 $423 15 Burgundy Ct Burgundy Dr E END 3,672 $110 16 Burgundy Ln Ham Ln Burgundy Dr 7,910 $23730 Burgundy Dr Vin Rose Dr Zinfandel Dr 56,035 $1,681 05 Chablis Dr Burqundy Dr Ham Ln 40,460 $1.21380 Zinfandel Dr. Vin Rose Dr. Sherry Ct. 8,925 $267.75 Rockingham Cir. ALL 56,700 $1,701.00 La Vida Dr. Cabrillo Cir. END 13.140 $394.20 Alto Wy. I Corbin Ln. I Tokay St. I 7,650 $229.50 Corbin Ln. Lower Sacramento Rd. Camellia Wy. 82,042 $2,461.26 Summerset Ct. Cochran Rd. NM END 14,130 $423.90 Cochran Rd. Evert Ct. Lower Sacramento Rd. E END 97,791 $2,933.73 Vine St. N END 7,500 $225.00 Evert Ct. Vine St. S END 4,740 $142.20 Kramer Dr. Vine St. Wightman Dr. 20,760 $622.80 Sunwest Dr. Laver Ct. W END 38.675 $1.160.25 Wintergreen Ct. I Cochran Rd. I N/E END 10,530 I $315.90 Geneva Ln. I Tyler Wy I Petersburg Wy. I 21,245 I $637.35 I Laver Ct. I N END I Vine St. 4,740 $142.20 Laver Ct. I Vine St. Sunwest Dr. 9,555 I $286.65 Petersburg Wy. I Geneva Ln. I Vienna Dr. I 9,625 I $288.75 I Tyler Wy I Vienna Dr. Geneva Ln. 9,590 $287.70 K:\WP\COUNCIL\2011\2011 Crack Sealing Contract.doc 2 03/16/2011 Road Name From Address To Address Approximate Price per Street Willow Point I Lakeshore Dr. I N END Area SQ FT $278.25 Vienna Dr. I Tienda Dr. I TylerWy 1 56,280 I $1,688.40 Timberlake Cir. East of Lakeshore Dr. I All 63,885 ( $1,916.55 Willow Point I Lakeshore Dr. I N END I 9,275 $278.25 Lakeshore Dr. I Mills Ave. Kettleman Ln. I 111,965 $3,358.95 Newport Dr. I Camphor Wy. I Lakeshore Dr. I 9,590 + $287.70 I Winding Oak St. I Amber Leaf Wy. I CamphorWy. I 21,560 I $646.80 Windy Tree I Amber Leaf Wy Autumn Wy. I 8,925 $276.75 Orchis Ct. G V I All I I 13,640 I $409.20 Sand Creek Dr. I MiIlsAve. I Sylvan Wy. I 20,930 I $627.90 I Total I $42,788.13 ARTICLE V It is further expressly agreed by and between the parties hereto that, should there be any conflict between the terms of this instrument and the Bid Proposal of the Contractor, then this instrument shall control and nothing herein shall be considered as an acceptance of the said terms of said proposal conflicting herewith. K:\WP\COUNCIL\2011\2011 Crack Sealing Contract.doc 3 03/16/2011 WHEN SIGNING THIS CONTRACT, THE CONTRACTOR AGREES THAT THE PERIOD FOR THIS CONTRACT IS IN EFFECT FROM 10 DAYS FOLLOWINGAWARD OF CONTRACT THROUGH JUNE 30,2011, AND THE CONTRACTOR AGREES TO SUBMIT MONTHLY BILLINGS NO LATERTHAN THE 10TH OF EACH MONTH. IN WITNESS WHEREOF, the parties hereto have hereunder set their hands the day and year first written. CONTRACTOR Authorized Signature Title TYPE OF ORGANIZATION Individual, Partnership or Corporation Address CITY OF LODI A Municipal corporation Konradt Bartlam City Manager Attest: Randi Johl City Clerk Approved as to Form: D. Stephen Schw uer City Attorney KAWMCOUNCIL\2011\2011 Crack Sealing Contract.doc 4 Dated: 2011 (Affix corporate seal if Corporation) Telephone Date Date Date 03/16/2011 RESOLUTION NO. 2011-43 A RESOLUTION OF THE LODI CITY COUNCIL AUTHORIZING THE CITY MANAGER TO EXECUTE CONTRACT FOR THE 2011 STREETS CRACK SEALING PROJECT WHEREAS, in answer to notice duly published in accordance with law and the order of this City Council, sealed bids were received and publicly opened on March 16, 2011, at 11:00 a.m., for the 2011 Streets Crack Sealing Project described in the plans and specifications therefore approved by the City Council on March 2, 2011; and WHEREAS, said bids have been checked and tabulated and a report thereof filed with the City Manageras follows: Bidder Bid American Asphalt Repair and Resurfacing Company $ 42,788.13* Rubberized Crackfiller Sealant, Inc. $ 44,204.00 Graham Contractors, Inc. $ 44,343.87* Valley Slurry Seal Company $ 52,208.92* California Pavement Maintenance Company $ 79,854.37* Intermountain Slurry Seal Company $ 120,654.96 *Corrected total WHEREAS, staff recommends awarding the contract for the 2011 Streets Crack Sealing Project to the low bidder, American Asphalt Repair and Resurfacing Company, of Hayward, California, in the amount of $42,788.13. NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council does hereby authorize the City Manager to execute the contract for the 2011 Streets Crack Sealing Project with the low bidder, American Asphalt Repair and Resurfacing Company, of Hayward, California, in the amount of $42,788.13. Dated: April 6, 2011 ------------------------------------------------------------------- ------------------------------------------------------------------- I hereby certify that Resolution No. 2011-43 was passed and adopted by the City Council of the City of Lodi in a regular meeting held April 6, 2011, by the following vote: AYES: COUNCIL MEMBERS — Hansen, Katzakian, Mounce, Nakanishi, and Mayor Johnson NOES: COUNCIL MEMBERS — None ABSENT: COUNCIL MEMBERS— None ABSTAIN: COUNCIL MEMBERS— None 2011-43 (.&0 City Clerk