Loading...
HomeMy WebLinkAboutAgenda Report - April 4, 1990 (42)CITY OF LODI COUNCIL COMMUNICATION PURLl[ WORKS DEPARTMENT TO: FROM: MEETING DATE: April 4, 1990 AGENDA TITLE: Contract Award and Appropriation of Funds for Lower Sacramento Road Improvements, 900.Feet'South of Lodi Avenue to 400 Feet North of Tejon Street, and Removal of Stop Signs on Lower Sacramento Road at Park West Drive - This project consists of pavement widening and restriping along Lower X Sacramento Road to provide left turn pockets at the major intersections and construction of traffic signals and street improvement at the intersection of Lower Sacramento Road and Elm Street, including extension of the frontage road to Elm Street. Y Traffic backed up from the stop sign on Lower Sacramento Road at Park West Drive extends into the Elm Street intersection. This will interfere with the operation of the new signal at Elm Street. With the signal and the frontage road extension, the stop sign on Lower Sacramento Road is an unnecessary traffic control device. The bid opening for this project is set for April 4, 1990, the date of the City Council meeting. Assuming there are no problems with the bids, an award recommendation will be made at the meeting. n ' Jack"A . Ronsko '. Pub14 Works Director JLR/RCP/mt cc: Purchasing Officer Street Superintendent APPROVED: na FILE NO. CL0WSAC4/TXTW.02N March 23, 1990 -T0: CITY OF LODI PtIBLIC WORKS DEPARTMENT FROM: MEETING DATE: City Council City Manager. April 4, 1990 COUNCIL COMMUNICATION Project Data Bid Opening Date: 4/4/90 AGENDA TITLE: Contract Award and Appropriation of Funds for Lower Sacramento Road Improvements, -.900 Feet South of Lodi Avenue to 400 Feet North of Tejon Street, and Removal of Stop Signs on Lower Sacramento Road At Park West Drive RECOMMENDED ACTION: That the City Council award the contract for the above project to Claude C. Wood Company in the amount of $340,974.40 with full depth asphalt concrete structural section (Alternate B) and Schedule 1, Median Curb and Gutter South of Elm Street, and authorize the City Manager to reappropriate funds for'the project. BACKGROUND INFORMATION: This project consists of pavement widening and restriping along Lower Sacramento Road to provide left turn pockets at the major intersections and construction of traffic signals and street improvement at the intersection of Lower Sacramento Road and Elm Street, including extension of the frontage road to Elm Street. Traffic backed up from the stop sign on Lower Sacramento Road at Park West Drive extends into the Elm Street intersection. This will interfere with the operation of the new signal at Elm Street. With the signal and the frontage road extension, the stop sign on Lower Sacramento Road is an unnecessary traffic control device. Plans and specifications for this project were approved on March 21, 1990. The City received one bid for this project. A bid tabulation is attached. Staff has reviewed the bid with Claude C. Wood Company and sees no reasonable way to substantially reduce the cost of the project. Other potential bidders were aisc contacted. Apparently the volume of work presently underway or being bid precluded receiving additional bids. The total cost of the project and recommended funding is shown below. Project Costs Final Engineering & City -Furnished Signal Materials $ 30,000 Construction Contract 341,000 Contingencies & Construction Engineering 34,000 405,000 APPROVED: CL0WSAC5/TXTW.02M FILE NO. April 4, 1990 City Council Lower Sacramento Road Improvements April 4, 1990 Page 2 Funding Already Budgeted (non4AU) Unappropriated TDA,..(124 Fund) Unappropriated.Gas:Tax (32 Fund) Church Street: Overlay Misc. Curb & Gutter (33 Fund) Misc. Widening (33 Fund), Lodi Avenue Over Misc. Water,,Wasteaater & Storm Jack.L. Ronsko Public Works. Director JLR/RCP/mt Attachment cc: Purchasing Officer Street Superintendent a CL0WSAC5/TXTW.02M April 4. 1990 City of Lodi - Public Work Department Bid Tabulation Project:! Lower Sacramento Road Improvement i Bids Opened: April 4th, 1990 { Engineer's Estimate Claude C. Wood Total I Unit; Unit Kam Description 1 quanti Unit Price! Total Price! Tata! 1 Clearing & Grubbing 11LS 570.000.00 1 $10.000.00 $11,000.00 511,000.00 2 : ompact Original Ground 83.2251 3.225 SF 0.151 12,483.75 0.20 16645.00 3 IPavernent Grinding (1.51 3.564i LF 0.751 2.673.00 0.601 2138.40 4 Misc. Concrete Subgrade Comp. i 2,7501 SF 1.001 2.750.00 2.001 5500.00 5 Vertical Curb & Cutter ( 4471 LF I 15.00 1 6.705.00 12.00 T5364.00 6 Median Curb I 1081 LF 13.00 1,404.00 10.00 I 1080.00 7 AC Curb { 132 LF 8.00 1,056.00 10.001 1320.00 8 Sidewalk ! 1,522 SF 1 4.00 6,088.00 6.00 9132.00 9 Signs & Delineators 1 LS 1,500.00 1.500.00 6.500.00 6500.00 10 Tmtr#c SWW Elm Lwr Sac 1 i LS 50.000.00 50,000.00 72.000.00 72000.00 11 Pavement Striping & Markers 1 j LS 3.000.00 3,000.00 8.000.13D, 8000.00 12 Removal Of Striping & Markers I 1' LS 7,500.00 I 7,500.00 8.500.00 8500.00 13 Traffic Control ; 1 LS 2,000.00 2.000.00 13,500.00 13500.00 14 Street Light 11 EA 2,000.00 I 2,000.00 1,600.00 1600.00 15 S- Water Main 801 LF 60.001 4.800.00 50.00 4000.00 16 Blow -Off I 11 EA 200.001 200.00 550.00 ( 550.00 17 Adjust Water Valve Frame &Cover 1 4 EA 00 3.00 1.200.00 1600.00 18 12' Storm Drain 291 LF 60.001 1,740.00 _400.00 200.00 5800.00 19 Drop Inlet Catch Basin 1 EA 800.00 800.00 850.00 1 850.00 20 Abandon Drop Inlet Catch Basin 1 { EA , 22M.001 200.00 500.00 T 500.00 21 Adjust Manhole Frame & Cover 4 EA ; 315.001 1.260.00 450.001 1800.00 22 JEcavation Safety 1 i LS i 500.00 I 500.00 500.001, 500.00 i 1 Base Bid Subtotal 5119.859.75 $177.879.101 Structure Section - Alternate A I I { I Roadway Excavation 4,014: CY $10.00 $40.140.03 $11.001 $44,154.00 2 Aggregate Base 3.312: Ton ! 17.W 56.304.00 15-oo ' 49680.00 3 Asphalt Concrete 1.791; Ton 34.00 60.894.00 38.00 68058.00 Alternate A Subtotal $157.338.00 $161.892.00 Structural Section - Altemate B I 1 1 1 Roadway Excavation. 3.113r Cy j $11.00 $34.243.00 572.00 $37,356.00 2 Asphalt Concrete 1 3.3011 Ton 1 33.50 110.583.50 36.00 118336.00 Alternate B Subtotal $144.826.50 - $156.192.00 •Laver Alternate Cost = _ _ _ _ > Subtotal Base + Alternate A Subtotal Base + Alternate B $277.197.75 $264.686.25 _"' $339.771.40 $334.071.40 Schedule 1 - East Side Median (S/Elm) 1 Vertical Curb & Gutter 341: LF $15.00 53.115.00 _ $12.00. $4.092.00 2 Misc. Concrete Subgrade Como. 937 SF 1.00 937,00 3.00 2.611.00 Schedule 1 Subtotal $6.052.00 56.903.00 Base Subtotal + Lower Alternate + Schedule 1 270.738.25 $340,974.40 !I City of Lodi - Public Work Department I Bid Tabulation Project: Lower Sacramento Road Improvement I Bids Opened:! April 4th. 1990 I ; I i Engineer's Estimate Claude C.Wood Total Unitl unit kem Description Ouantity Unit Price Total Price Total 1 Clearing & Grubbing --- -t-----1 LS 1$10.000.00 $10,000.00 $11,000.00 1 Si 1.000.00 2 Cmpact Original Ground 83=51 SF 0.15 12,483.75 0.201 16645.00 3 Pavernent Grinding (1.51 3,564 LF 0.75 2,673.00 0.60 2138.40 4 5 Misc. Concrete Subgrade Comp. Vertical Curb & Gutter 2,750 SF 447 LF 1.00 15.00 1 2,750.00 6,705.00 - 2.00 12.00 5500.00 _ 5364.00 6 Median Curb _ I --- 108 LF 13.00 i 1,404.00 10.00 _- --10.00 _ _1080.00 - 7 AC Curb _ --- * 1321 LF 8.00 1,056.00 1320.00 8 9 Sidewalk Signs & Delineators I 1,5221 SF4.00 1 i LS 1,500.00 6,088.00 1,500.00 6.00 6,500.00 9132.00 6500.00 10 Traffic Signal Elm / Lwr Sac --- 1' LS 50,000.00 50,000.00 72,000.00 72000.00 11 Pavement Striping & Markers 1 LS 3.000.00 - 3,000.00 8,000.00 8000.00 12 Removal Of Stri "rig & Markers 1 II LS 7,_500.00 7,500.00 8,500.00 8500.00 13 _ Traffic Control I _ 11 LS I 2,000.00 2,000.00 13,500.00 _ 13500.00 14 _ Street Light 11EA 1 . 2,000.00 --- 1,600.00 1600.00 15 8• Water Main --- -- - _ - - 80L LF 60.001 4.800.00 Blow -Off t EA i _ 200.001 200.00 Adjust Water Valve Frame & Cover 4i EA t 300.00 1,200.00 12' Storm Drain i 29 i LF 1 60.001 1,740.00 Drop inlet Catch Bazin 11 EAI 80).00' 800.00 - - ------ --- i ------------ .- •--- -+ - --- f- - --- - -- Abandon Drop Inlet Catch Basin ! 1 ! EA ' 200.00 ; 200.00 50.00 , 4000.00 550.001 550.00 400.00 1600.00 200.00 i 5800.00 850.00 i 850.00 - - - - - --- 500.001 500.00 16 17 18 19 ----- 20 21 22 - Adjust Manhole Frame & Cover ! Excavation Safety ----- 4; EA 1 LS 315.00 ` 500.00 ; 1,260.00 500.00 450.00 ' 500-0011 1800.00 500.00 Base Bid Subtotal $119,859.75 '- $177,879.40 Structure Section - Alternate A 1 2 RoadwayExcavation ---- - Aggregate_Base Asphalt Concrete --4,014 _'Y 3,312 Ton 1,791. Ton ' $10.00 17.00 34.00 $40.140_00 56.304_00 60.894.00 .___.. $11.00 !--$44.154.00 15.00 38-001 49680.00 68058.00 3 Alternate A Subtotal $157,338.00 $161,892.00 1 _2 Structural Section - Alternate B Roadway Excavation Asphalt Concrete 3.113 CY $11.00 3,301 Ton ' 33.50 $34,243.00 110,583.50 $12.00 36.00 $37356.00 118836.00 Alternate B Subtotal $144,826.50 $156,192.00 'Lower Alternate Cost = _ _ _ _ % Subtotal Base + Alternate A Subtotal Base + Alternate B $277.197.75 $264.686.25 $339.771.40 $334.071.40 1 2 Schedule 1 - East Side Median (S/Elm) Vertical Curb & Gutter Misc. Concrete Su rade Comp. 341 LF $15.00 937 SF 1.00 $5.115.00 937.00 $12.00 3.00 $4,092.00 2.811.001 Schedule 1 Subtotal $6.052.00 $6,903.00 Base Subtotal + Lower Alternate + Schedule 1 $270.738.2.5 $340.974.40 RESOLUTION KO. 90-53 A RESOLUTION OF THE LODI CITY COUNCIL AWARDING THE CONTRACT AND APPROPRIATING FUNDS FOR LOWER SACRAMENTO ROAD IMPROVEMENTS, 900 FEET SOUTH OF LODI AVENUE TO 400 FEET NORTH OF TEJON STREET, AND REMOVAL OF STOP SIGNS ON LOWER SACRAMENTO ROAD AT PARK WEST DRIVE ssxaacsssxa sxaaas=sxssaxscsssssassaxssssaasssssxsssaaxax WHEREAS, in answer to notice duly published in accordance with law and the order of this City Council, sealed bids were received and publicly opened on April 4, 1990 at 11:00 a.m. for the contract for Lower Sacramento Road improvements, 900 feet south of Lodi Avenue to 400 feet north of Tejon Street, and removal of stop signs on Lower Sacramento Road at Park West Drive, described in the specifications therefor approved by the City Council on March 21, 1990; and WHEREAS, only one bid was received for this project from Claude C. Wood Company, and said bid has been compared, checked, and tabulated and a report thereof filed with the City Manager as shown on Exhibit A attached hereto; and WHEREAS, the City Manager recommends that award of the contract for Lower Sacramento Road improvements, 900 feet south of Lodi Avenue to 400 feet north of Tejon Street, and removal of stop signs on Lower Sacramento Road at Park West Drive be made to the sole bidder, Claude C. Wood Company for full depth asphalt concrete structural section (Alternate B) and Schedule 1, Median Curb and Gutter South of Elm Street; NOW, THEREFORE, BE IT RESOLVED by the Lodi City Council that award of contract for Lower Sacramento Road improvements, 900 feet south of Lodi Avenue to 400 feet north of Tejon Street, and removal of stop signs on Lower Sacramento Road at Park West Drive be and the same is hereby awarded to the sole bidder, Claude C. Wood Company, for full depth asphalt concrete structural section (Alternate B) and Schedule 1, Median Curb and Gutter South of Elm Street, in the amount of $340,974.40; and BE IT FURTHER RESOLVED, that the City Council hereby authorizes the City Manager to reappropriate funds for the project. Dated: April 4, 1990 I hereby certify that Resolution No. 90-53 was passed and adopted by the City Council of the City of Lodi in a regular meeting held April 4, 1990 by the following vote: Ayes: Council Members - Hinchman, Olson, Pinkerton, Reid and Snider (Mayor) Noes: Council Members - None Absent: Council Members - None Alice M. Rei the City Clerk 9G-53