Loading...
HomeMy WebLinkAboutAgenda Report - March 17, 2010 D-04AGENDA ITEM CITY OF LODI ,. COUNCIL COMMUNICATION AGENDA TITLE: Adopt Resolution Awarding Contractfor DeBenedetti Park— Phase I Improvements, 2350 South Lower Sacramento Road, to Hemington Landscape Services, Inc., of Cameron Park ($883,562) MEETING DATE: PREPARED BY: March 17, 2010 Public Works Director RECOMMENDED ACTION: Adopt a resolution awarding the contractforthe DeBenedetti Park— Phase I Improvements, 2350 South Lower Sacramento Road to Hemington Landscape Services, Inc., of Cameron Park, in the amount of $883,562. BACKGROUND INFORMATION: This project consists of providing and installing anew 6 -foot high chain link, fence, concrete mow strip, concrete flatwork, stamped concrete driveway, automatic irrigation system, Maxicom irrigation control equipment, 50 -horsepower irrigation booster pump, drop inlet catch basins and piping, placement and compaction of salvaged asphalt concrete grindings, soil amendments, grading, hydro -seeding of "no -mow" turf, mechanical sprig planting of Bermuda turf and other incidental and related work. The completion of this projectwill allow the Parks and Recreation Departmentto add new play areas for its soccer, flag football, and softball programs. The new fields should be ready for program use in the spring of 2011. This project will also install a "no-mow"turf in the storm drain detention basin area to provide some measure of erosion control and dust control on the slopes of this basin. Plans and specifications for this projectwere approved on January 6, 2010. The City received the following 18 bids for this project on February 24, 2010. Bidder Location Bid Engineer's Estimate $ 1,502,646.20 Hemington Landscape Services, Inc. Cameron Park $ 883,562.00 Parker Landscape Sacramento $ 890,361.96 A. M. Stephens Construction Lodi $ 892,676.00 ValleyCrest Landscape Sacramento $ 903,484.40 Diede Construction Lodi $ 907,401.15 Elite Landscape Clovis $ 913,046.77 Perma Green HydroSeed Gilroy $ 935,105.85 Knife River Construction Stockton $ 950,565.20 Goodland Landscape Tracy $ 965,001.28 Granite Construction Stockton $ 968,923.00 Watkins-Bortolussi San Rafael $ 970,046.33 Gateway Landscape Livermore $ 979,600.00 APPROVED: I Blair King, City er K:\WP\PROJECTS\PARKS\DeBenedetti(G-Basin)\Phase 1 Improvements\CAward.doc 3/2/2010 Adopt Resolution Awarding Contract for DeBenedetti Park — Phase I Improvements, 2350 South Lower Sacramento Road, to Hemington Landscape Services, Inc., of Cameron Park ($883,562) March 17, 2010 Page 2 Bidder Location Bid Blossom Valley San Jose $ 987,088.05 Cleary Brothers Danville $ 997,877.80 Suarez & Munoz Construction Hayward $ 999,467.00 Star Construction San Bruno $ 1,071,663.50 ICE Builders Anaheim $ 1,088,581.78 George Reed, Inc. Lodi $ 1,164,568.40 FISCAL IMPACT: There will be an increase in long-term park and storm drain maintenance costs. FUNDING AVAILABLE: Parks Impact Fees (1217040) $390,000 Storm Drain Impact Fee (326040) $595,000 Jordan Ayers Deputy City Manager/Internal Services Director Akzu-4 F. Wally Ondelin PublicWorks Director Prepared by Wesley K. Fujitani, Senior Civil Engineer cc: City Attorney Purchasing Officer Streets and Drainage Superintendent Parks Superintendent Management Analyst Areida-Yadav K:\WP\PROJECTS\PARKS\DeBenedetti(G-Basin)\Phase 1 Improvements\CAward.doo 3/2/2010 DeBENEDETTI PARK PHASE I IMPROVEMENTS 2350 South Lower Sacramento Road CONTRACT CITY OF LODI, CALIFORNIA THIS CONTRACT made by and between the CITY OF LODI, State of California, herein referred to as the "City," and HEMINGTON LANDSCAPE SERVICES, INC., herein referred to as the "Contractor." WITNESSETH: That the parties hereto have mutually covenanted and agreed, and by these presents do covenant and agree with each other, as follows: The complete Contract consists of the following documents which are incorporated herein by this reference, to -wit: Notice Inviting Bids Information to Bidders General Provisions Special Provisions Bid Proposal Contract Contract Bonds Plans The July 1992 Edition, Standard Specifications, State of California, Business and Transportation Agency, Department of Transportation All of the above documents, sometimes hereinafter referred to as the "Contract Documents," are intended to cooperate so that any work called for in one and not mentioned in the other is to be executed the same as if mentioned in all said documents. ARTICLE 1 - That for and in consideration of the payments and agreements hereinafter mentioned, to be made and performed by the City and under the condition expressed in the two bonds bearing even date with these presents and hereunto annexed, the Contractor agrees with the City, at Contractor's cost and expense, to do all the work and furnish all the materials except such as are mentioned in the specifications to be furnished by the City, necessary to construct and complete in a good workmanlike and substantial manner and to the satisfaction of the City the proposed improvements as shown and described in the Contract Documents which are hereby made a part of the Contract. ARTICLE II - The City hereby promises and agrees with the Contractor to employ, and does hereby employ, the Contractor to provide all materials and services not supplied by the City and to do the work according to the terms and conditions for the price herein, and hereby contracts to pay the same as set forth in Section 5.600, "Measurement, Acceptance and Payment," of the General Provisions, in the manner and upon the conditions above set forth; and the said parties for themselves, their heirs, executors, administrators, successors and assigns, do hereby agree to the full performance of the covenants herein contained. ARTICLE I I I - The Contractor agrees to conform to the provisions of Chapter 1, Part 7, Division 2 of the Labor Code. The Contractor and any Subcontractor will pay the general prevailing wage rate and other employer payments for health and welfare, pension, vacation, travel time, and subsistence pay, apprenticeship or other training programs. The responsibility for compliance with these Labor Code requirements is on the prime contractor, Contract.doc 1 03/02/10 ARTICLE IV - And the Contractor agrees to receive and accept the following prices as full compensation for furnishing aii materials and for doing all the work contemplated and embraced in this agreement; also for all loss or damage arising out of the nature of the work aforesaid or from the action of the elements, or from any unforeseen difficulties or obstructions which may arise or be encountered in the prosecution of the work until its acceptance by the City, and for all risks of every description connected with the work; also for all expenses incurred by or in consequence of the suspension or discontinuance of work and for well and faithfully completing the work, and the whole thereof, in the manner and according to the Plans and Contract Documents and the requirements of the Engineer under them, to -wit: The work consists of providing and installing new 6 foot high chain link fence, concrete mow strip, concrete flat work, automatic irrigation system, Maxicom irrigation control equipment, 15HP irrigation booster pump, drop inlet catch basins and piping, underground electrical, placement and compaction of salvaged asphalt grinding roadway, soil amendments, fine grading, hydro -seeding of "no -mow" turf, mechanical sprig planting of Bermuda turf and other incidental and related work, all as shown on the plans and specifications for the project. DeBENEDETTI PARK LOW FLOW AREA CONTRACT ITEMS ITEM EST'D NO. DESCRIPTION UNIT QTY UNIT PRICE TOTAL PRICE 1. Clearing and Grubbing LS 1 $7,200.00 $7,200.00 2. Dust Control LS 1 $8,415.01 $8,415.01 3. Furnish, Install and LS 1 $2,700.00 $2,700.00 Maintain Storm Water Pollution Prevention Plan 4. Furnish All Labor, SF 696,960 $0.05 $34,848.00 Materials and Equipment for Grading basin Areas 5. Furnish and Install LS 1 $750.00 $750.00 30 -Inch x 60 -Inch Water Meter Box 6. Furnish and Install New LS........ 1 $850.00 $850.00 6 -Inch Water gate Valve and 6 -Inch Blow -Off 7. Furnish and Install LF 475 $30.00 $14,250.00 6 -Inch Ductile Iron Water Line 8. Furnish and Install Drop EA 3 $750.00 $2,250.00 In -Let Catch Basins with 12 -Inch Laterals, Concrete Aprons and Rip Rap Outlets 9. Furnish and Install SF 16,700 $3.00 $50,100.00 8 -Foot Wide Concrete Walkway Contract.doc 2 03/02/10 ITEM EST'D NO. DESCRIPTION UNIT QTY 10 Furnish and Install EA 2 26 64 1,400 1,080 2,515 675 1 2 UNIT PRICE $1,050.00 $17.34 $21.00 $5.00 $3.00 $34.00 $25.00 $3,800.00 $1,080.00 TOTAL PRICE $2,100.00 $450.84 $1,344.00 $7,000.000 $3,240.00 $85,510.00 $16,875.00 $3,800.00 $2,160.00 1 Concrete Curb Returns $803.00 1 with Truncated Domes ......... ......... _.. - $559.00 11. Furnish and Install LF 2,150 6 -Inch x12 -Inch $3,977.50 1,750 Concrete Curb $9,345.00 12. Furnish and Install LF Vertical Curb and Gutter 13. Furnish and Install SF 6 -Inch Re -Enforced Concrete Driveway Pads 14. Furnish and Install New SF Concrete Flat Work Utility Enclosure 15. Furnish and Install LF 6 -Foot Chain Link Fence with 24 -Inch Wide Concrete Mow Strip 16. Furnish and Install LF 6 -Foot Chain Link Fence 17. Furnish and Install EA 26 -Foot Wrought iron Double Swing Gate with Plate Lettering 18. Furnish and Install EA 16 -Foot Double Swing Gates 19. Furnish and Install EA 8 -Foot Double Swing Gate................. 20. Furnish and Install EA 4 -Foot Man Gate 21. Remove and Re -Install LF Existing Temporary Chain Link Fencing 22. Furnish and Install LF Portable Chain Link Fencing 23. Furnish and Install LF Recycled Plastic Header Board and Steel Stakes 24. Place and Compact CY Salvaged Asphalt Grindings Contract.doc 26 64 1,400 1,080 2,515 675 1 2 UNIT PRICE $1,050.00 $17.34 $21.00 $5.00 $3.00 $34.00 $25.00 $3,800.00 $1,080.00 TOTAL PRICE $2,100.00 $450.84 $1,344.00 $7,000.000 $3,240.00 $85,510.00 $16,875.00 $3,800.00 $2,160.00 1 $803.00 $803.00 1 $559.00 ......... ......... _.. - $559.00 2,150 $2.68 $5,762.00 2,150 $1.85 $3,977.50 1,750 $5.34 $9,345.00 320 $26.44 $8,460.80 3 03/02/10 ITEM EST'D NO. DESCRIPTION UNIT QTY UNIT PRICE TOTAL PRICE 25. Furnish and Install CY 30 $77.00 $2,310.00 Compacted Base Rock at Lwr. Sac. Driveway 26. Furnish and Install SF 450 $13.50 $6,075.00 Stamped Concrete Driveway at Lwr. Sac. Rd. 27. Furnish and Install TON 14 $236.00 $3,304.00 Asphalt Concrete Paving S at Lwr. Sac. Rd. Driveway 28. Furnish and Install EA 1 $5,500.00 $5,500.00 6-Inch Double Check Valve Assembly 29. Furnish and Install 50 HP EA 1 $49,100.00 $49,100.00 RainBird VFD Irrigation Booster Pump 30. Furnish and Install SF 872,210 $0.23 $200,608.30 Automatic Irrigation System 31. Furnish and Install LS 1 $42,322.00 $42,322.00 RainBird Maxicom Irrigation Controllers and Enclosures 32. Furnish All Labor, SF 696,960 $0.23 $160,300.80 Materials and Equipment for Soil Amendments and Fertilizer 33. Furnish and Install SF 175,250 $0.08 $14,020.00 Hydro-Seeded "No-Mow" Turf Application 34. Furnish and Install SF 696,960 $0.10 $69,696.00 Mechanical Sprig "Bermuda" Turf Application 35. Furnish All Labor, LBS 1,600 $1.50 $2,400.00 Materials and Equipment for Pre-Emergent Herbicide Application 36. Furnish& Install 2-Inch LF 50 $20.00 $1,000.00 Ductile Iron Water Line with Ball Valve & Cap 37. Provide a 180-Day LS 1 $50,113.00 $50,113.00 Landscape maintenance Period Contract doc 4 03/02/10 ITEM EST'D NO. DESCRIPTION UNIT QTY UNIT PRICE TOTAL PRICE 38. Furnish All Labor, LS 1 $1,800.00 $1,800.00 materials and Equipment to Relocate (E) Fire Hydrant 39. Furnish All Labor, EA 10 $100.00 $1,000.00 Materials and Equipment to Remove and Re - Install (E) "No Parking" Signs 40. Excavation Safety LS 1 $1,262.75 $1,262.75 TOTAL: $883,562.00 ARTICLE V - By my signature hereunder, as Contractor, I certify that I am aware of the provisions of Section 3700 of the Labor Code, which requires every employer to be insured against liability for workers' compensation or to undertake self-insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this contract. ARTICLE VI - It is further expressly agreed by and between the parties hereto that, should there be any conflict between the terms of this instrument and the Bid Proposal of the Contractor, then this instrument shall control and nothing herein shall be considered as an acceptance of the said terms of said proposai conflicting herewith. ARTICLE VII - The City is to furnish the necessary rights-of-way and easements and to establish lines and grades for the work as specified under the Special Provisions. All labor or materials not mentioned specifically as being done by the City will be supplied by the Contractor to accomplish the work as outlined in the specifications. ARTICLE VIII - The Contractor agrees to commence work pursuant to this contract within 15 calendar days after the Mayor has executed the contract and to diligently prosecute to completion within 120 WORKING DAYS. WHEN SIGNING THIS CONTRACT, THE CONTRACTOR AGREES THAT THE TIME OF COMPLETION FOR THIS CONTRACT IS REASONABLE AND THE CONTRACTOR AGREES TO PAY THE CITY LIQUIDATED DAMAGES AS SET FORTH IN SECTION 6-04.03 OF THE SPECIAL PROVISIONS. CONTRACTOR AGREES THAT THIS AMOUNT MAY BE DEDUCTED FROM THE AMOUNT DUE THE CONTRACTOR UNDER THE CONTRACT. Contract.doc 5 03/02/10 IN WITNESS WHEREOF, the parties to these presents have hereunto set their hands the year and date written below. CONTRACTOR: M Title (CORPORATE SEAL) CITY OF LODI Blair King City Manager, City of Lodi Attest: Randi Johl City Clerk Dated: Approved as to form: p n Schwabaue` City Attorney Contract.doc 6 03/02/10 RESOLUTION NO. 2010-25 A RESOLUTION OF THE LODI CITY COUNCIL AWARDING CONTRACT FOR DEBENEDETTI PARK PHASE I IMPROVEMENTS, 2350 SOUTH LOWER SACRAMENTO ROAD WHEREAS, in answer to notice duly published in accordance with law and the order of this City Council, sealed bids were received and publicly opened on February 24, 2010, at 11:00 a.m. for the DeBenedetti Park Phase I Improvements, 2350 South Lower Sacramento Road, described in the plans and specifications therefore approved by the City Council on January 6,2010; and WHEREAS, said bids have been checked and tabulated and a report thereof filed with the City Manager as follows: Bidder Bid Hemington Landscape Services, Inc. $ 883,562.00 Parker Landscape $ 890,361.96 A. M. Stephens Construction $ 892,676.00 ValleyCrest Landscape $ 903,484.40 Diede Construction $ 907,401.15 Elite Landscape $ 913,046.77 Perma Green HydroSeed $ 935,105.85 Knife River Construction $ 950,565.20 Goodland Landscape $ 965,001.28 Granite Construction $ 968,923.00 Watkins-Bortolussi $ 970,046.33 Gateway Landscape $ 979,600.00 Blossom Valley $ 987,088.05 Cleary Brothers $ 997,877.80 Suarez & Munoz Construction $ 999,467.00 Star Construction $1,071,663.50 ICE Builders $1,088,581.78 George Reed, Inc. $1,164,568.40 WHEREAS, staff recommends awarding the contract for the DeBenedetti Park Phase I Improvements, 2350 South Lower Sacramento Road, to the low bidder, Hemington Landscape Services, Inc., of Cameron Park, California. NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council does hereby award the contract for the DeBenedetti Park Phase I Improvements, 2350 South Lower Sacramento Road, to the low bidder, Hemington Landscape Services, Inc., of Cameron Park, California, in the amount of $883,562.00. Dated: March 17, 2010 I hereby certify that Resolution No. 2010-25 was passed and adopted by the City Council of the City of Lodi in a regular meeting held March 17, 2010, by the following vote: AYES: COUNCIL MEMBERS— Hansen, Hitchcock, Johnson, Mounce, and Mayor Katzakian NOES: COUNCIL MEMBERS — None ABSENT: COUNCIL MEMBERS— None ABSTAIN: COUNCIL MEMBERS— None I JOHL City Clerk 2010-25