AGENDA ITEM C 4
'• CITY OF LODI
COUNCIL COMMiJ1VICATION
AGENDA TITLE: Adopt Resolution Approving Payment of Wastewater Capacity Impact Mitigation
Fees for Central Plume PCE/TCE Groundwater Clean -Up and Appropriating Funds
($1,784,189)
MEETING DATE:
PREPARED BY:
March 16, 2011
PublicWorks Director
RECOMMENDED ACTION: Adopt resolution approving payment of wastewater capacity impact
mitigation fees for Central Plume PCE/TCE groundwater clean-up
and appropriating funds in the amount of $1,784,189.
BACKGROUND INFORMATION: On March 17,2010, City Council awarded the contract for the
Central Plume PCEITCE Interim Remedial Measures Projectto
Diede Construction, Inc. During the past year, the design and
permitting has been completed and the construction is nearing
completion. The treated groundwaterfrom the facilities will be discharged to the wastewater system until
such time the California Public Health Department grants permission to the City to include this water as
part of the potable system. The duration of the discharge to the wastewater system is unknown.
Dischargers to the wastewater system are required to pay the wastewater capacity impact mitigation fee
based upon the volume and characteristics of the discharge. Payment of the fee is a building permit
condition and shall be made priorto startup of the facilities. The fee has been calculated to be
$1,784,189. Funding for the fee payment comes from court -approved settlements with the potentially
liable parties. When the discharge to the wastewater system is concluded, the fee may be refunded to
the Central Plumefunds.
FISCAL IMPACT: Wastewater Impact Mitigation Fee Fund 173 receives needed funds.
FUNDING AVAILABLE: RequestedA propriation: Central Plume (190) - $1,784,189
Jordan yers
Deputy City Man ger/Internal Services Director
�W
F. Wally SEvandelin
Public Works Director
FWS/pmf
APPROVED:
Konradt Bartlam, City Manager
K:\WP\PROJECTS\WATER\PCE,TCE\Central\Cwwcapacityfees.doc 3/8/2017
1. AA#
2. JV#
TO: Internal Services Dept. - Budget Division
3. FROM7 Rebecca Areida-Yadav 5. DATE7 02/18/2011
4. DEPARTMENT/DIVISION: Public Works/Administration
FUND # I BUS. UNIT # I ACCOUNT # I ACCOUNT TITLE AMOUNT
A. 1 190 1 1 3205 IFund Balance $ 1.784.189.00
OF
B. 190 190121 1 1
USE OF
FINANCING
ial Measures 1 $ 1.784.1
17. REQUEST IS MADE TO FUND THE; FOLLOWING PROJECT NOT INCLUDED IN THE CURRENT BUDGET I
Please provide a description of the project, the total cost of the project, as well as justification for the
requested adjustment. If you need more space, use an additional sheet and attach to this form.
On March 17, 2010 the City Council awarded the contract for the Central Plume PCE/TCE Remedial Measures project.
During the past year the design and permitting has been completed and the constructin is nearing completion. The treated
groundwater from the facilities will be discharged to the wastewater system. Dischargers to the wastewater system are
required to pay the wastewater capacity impact mitigation fee. Payment of the fee is a buliding permit condition and shall be
made prior to startup of the facilities.
If Council has authorized the appropriation adjustment, complete the following:
Meeting Date: Res No: Attach copy of resolution to this form
Department Head Signature: U.`-QLx--Q-
IIyer uti , CI i n •/ 9 a 1 5 � 1 n.t.
Submit completed form to the Budget Division with any required documentation.
Final approval will be provided in electronic copy format.
RESOLUTION NO. 2011-32
A RESOLUTION OF THE LODI CITY COUNCIL
APPROVING PAYMENT OF WASTEWATER CAPACITY
IMPACT MITIGATION FEES FOR CENTRAL PLUME
PCE/TCE GROUNDWATER CLEAN-UP AND FURTHER
APPROPRIATING FUNDS
WHEREAS, on March 17, 2010, the City Council awarded the contract for the
Central Plume PCE/TCE Remedial Measures Project to Diede Construction, Inc., and
the construction is nearing completion. The treated groundwaterfrom the facilities will
be discharged to the wastewater system until such time the California Public Health
Department grants permission to the City to include this water as part of the potable
system; and
WHEREAS, dischargers to the wastewater system are required to pay the
wastewater capacity impact mitigation fee based upon the volume and characteristics of
the discharge. Payment of the fee is a building permit condition and shall be made prior
to startup of the facilities. The fee has been calculated to be $1,784,189; and
WHEREAS, when the discharge to the wastewater system is concluded, the fee
may be refunded to the Central Plume funds.
NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council does hereby
approve payment of wastewater capacity impact mitigation fees for Central Plume
PCE/TCE groundwater clean-up in the amount of $1,784,189; and
BE IT FURTHER RESOLVED that funds in the amount of $1,784,189 be
appropriated from the Central Plume Fund for this payment.
Dated: March 16, 2011
-------------------------------------------------------------------
...................................................................
hereby certify that Resolution No. 2011-32 was passed and adopted by the City
Council of the City of Lodi in a regular meeting held March 16, 2011, by the following
vote:
AYES: COUNCIL MEMBERS — Hansen, Katzakian, Mounce, Nakanishi,
and Mayor Johnson
NOES: COUNCIL MEMBERS — None
ABSENT: COUNCIL MEMBERS— None
ABSTAIN: COUNCIL MEMBERS— None
HL
City Clerk
2011-32