Loading...
HomeMy WebLinkAboutAgenda Report - February 17, 2010 D-08AGENDA ITEM b4p% &% CITY OF LODI COUNCIL COMMUNICATION ._N AGENDA TITLE: Adopt Resolution Awarding Contractfor 2010 Alley Reconstruction Projectto George Reed, Inc., of Lodi ($226,454.40) MEETING DATE: February 17, 2010 PREPARED BY: Public Works Director RECOMMENDEDACTION: Adopt a resolution awarding the contract for the 2010 Alley Reconstruction Project to George Reed, Inc., of Lodi, in the amount of $226,454.40. BACKGROUND INFORMATION: This project consists of reconstructing three alleys with 866 tons of asphalt concrete, installing 1,856 lineal feet of pervious concrete valley gutter, and other incidental and related work, all as shown on the plans and specifications for the "2010 Alley Reconstruction Project." The location of the alleys to be reconstructed is provided in Exhibit A. The three alleys planned for reconstruction were selected from Streets Maintenance District 1 because it contains the oldest alleys in the community. All alleys in the Districtwere evaluated and ranked based upon condition, drainage problems, and the number of fronting residences. The City will be using Community Development Block Grant (CDBG) funds to reconstructthe alleys with new asphalt concrete pavement. Due to the relative flatness of the alley, a pervious concrete valley gutter will be installed in the center of the alley to handle the storm drainage. The pervious concrete will allow storm water to percolate to the underlying soil during low -flow situations and will solve the majority of the water ponding problems. The alley will also be graded to drain to the adjacent streets during more intense storm events. This project is the first of its kind in the City for many years and is the first project in the City to use the pervious concrete. If it proves to be successful, future alley projects will be constructed using similar methods. Plans and specifications for this project were approved on January 6, 2010. The City received the following 11 bids for this project on February 2, 2010. Two bids were rejected for failing to includethe mandatory addenda acknowledgements. Bidder Location Bid Engineer's Estimate $247,348.00 George Reed, Inc. Lodi $ 226,454.40 G&L Brock Construction Stockton Bid Rejected A.M. Stephens Construction Lodi $ 257,378.80 Granite Construction Stockton $ 260,985.00 Knife River Construction Stockton $ 268,685.70 P.E. Pacific Engineering Bakersfield $271,272.40 Teichert Construction Stockton $ 303,342.60 Hensley's Paving, Inc. Waterford $ 313,165.82 Haskell & Haskell Company Knights Ferry $ 321,463.99 Donn iker Construction Avery Bid Rejected Robert Burns Construction Stockton $ 323,892.92 APPROVED: Blair Kin i anager K:\WP\PROJECTS\STREETS\AIIeyReconstruction\CAward.doc 2/3/2010 Adopt Resolution Awarding Contractfor 2010 Alley Reconstruction Projectto George Reed, Inc., of Lodi ($226,454.40) February 17,220 10 Page 2 FISCAL IMPACT: There will be a decrease in street maintenancefor the reconstructed alleys. FUNDING AVAILABLE: 08-21 Urban County Funds CDBG $107,000 09-02 EntitlementCDGB $220,000 �.�,•�-- ,e. JordiAAyers Deputy City Manager/Internal Services Director M Prepared by Lyman Chang, Senior Civil Engineer FWS/LC/pmf Attachment cc: CityAttorney Purchasing Officer Streets and Drainage Superintendent Senior Civil EngineerChang ManagementAnalystAreida-Yadav Neighborhood Services Manager A4. F. Wally SAndeYin Public Works Director K:\WP\PROJECTS\STREETSWJIeyReconstruction\CAward.doc 2/3/2010 2010 ALLEY RECONSTRUCTION PROJECT CONTRACT Alley North of Elm Street, Garfield Street to Cherokee Lane Alley North of Pine Street, Washington Street to Central Avenue Alley North of Locust Street, Central Avenue to Garfield Street CITY OF LODI, CALIFORNIA THIS CONTRACT made by and between the CITY OF LODI, State of California, herein referred to as the "City," and GEORGE REED, INC., herein referred to as the "Contractor." WITNESSETH: That the parties hereto have mutually covenanted and agreed, and by these presents do covenant and agree with each other, as follows: The complete Contract consists of the following documents which are incorporated herein by this reference, to -wit: Notice Inviting Bids Information to Bidders General Provisions Special Provisions Bid Proposal Contract Contract Bonds Plans The July 2002 Edition, Standard Specifications, State of California, Business and Transportation Agency, Department of Transportation All of the above documents, sometimes hereinafter referred to as the "Contract Documents," are intended to cooperate so that any work called for in one and not mentioned in the other is to be executed the same as if mentioned in all said documents. ARTICLE I - That for and in consideration of the payments and agreements hereinafter mentioned, to be made and performed by the City and under the condition expressed in the two bonds bearing even date with these presents and hereunto annexed, the Contractor agrees with the City, at Contractor's cost and expense, to do all the work and furnish all the materials except such as are mentioned in the specifications to be furnished by the City, necessary to construct and complete in a good workmanlike and substantial manner and to the satisfaction of the City the proposed improvements as shown and described in the Contract Documents which are hereby made a part of the Contract. ARTICLE II - The City hereby promises and agrees with the Contractor to employ, and does hereby employ, the Contractor to provide all materials and services not supplied by the City and to do the work according to the terms and conditions for the price herein, and hereby contracts to pay the same as set forth in Section 5.600, "Measurement, Acceptance and Payment," of the General Provisions, in the manner and upon the conditions above set forth; and the said parties for themselves, their heirs, executors, administrators, successors and assigns, do hereby agree to the full performance of the covenants herein contained. ARTICLE III - The Contractor agrees to conform to the provisions of Chapter 1, Part 7, Division 2 of the Labor Code. The Contractor and any Subcontractor will pay the general prevailing wage rate and other employer payments for health and welfare, pension, vacation, travel time, CONTRACTLOC -I 02/02/2010 and subsistence pay, apprenticeship or other training programs. The responsibility for compliance with these Labor Code requirements is on the prime contractor. ARTICLE IV - And the Contractor agrees to receive and accept the following prices as full compensation for furnishing all materials and for doing all the work contemplated and embraced in this agreement; also for all loss or damage arising out of the nature of the work aforesaid or from the action of the elements, or from any unforeseen difficulties or obstructions which may arise or be encountered in the prosecution of the work until its acceptance by the City, and for all risks of every description connected with the work; also for all expenses incurred by or in consequence of the suspension or discontinuance of work and for well and faithfully completing the work, and the whole thereof, in the manner and according to the Plans and Contract Documents and the requirements of the Engineer under them, to -wit: The work consists of reconstructing the alleys with 866 tons of asphalt concrete, installing 1,856 lineal feet of pervious concrete alley gutter, and other incidental and related work, all as shown on the plans and specifications for "2010 Alley Reconstruction Project". CONTRACT ITEMS Schedule 1=Alley North of Pine Street, Washington Street to Central Avenue; Alley North of Locust Street, Central Avenue to Garfield Street ITEM EST'D. NO. DESCRIPTION UNIT QTY UNIT PRICE TOTAL PRICE 1. Traffic Control LS 1 $ 6,000.00 $ 6,000.00 2. Clearing and Grubbing LS 1 $ 3,000.00 $ 3,000.00 3. Roadway Excavation CY 676 $ 22.00 $14,872.00 4. Compact Original Ground SF 20,538 $ 0.35 $ 7,188.30 5. Concrete Subgrade Compaction SF 4,304 $ 1.60 $ 6,886.40 6. Asphalt Concrete TON 532 $ 80.00 $42,560.00 7. Concrete Alley Approach SF 2,022 $ 9.00 $18,198.00 8. Install Concrete Band LF 87 $ 20.00 $ 1,740.00 9. Pervious Concrete Alley Gutter LF 1,141 $ 13.00 $14,833.00 10. Adjust Manhole Frame and Cover to Grade EA 4 $ 650.00 $ 2,600.00 Contract.DOC 2 02/02/10 ITEM EST'D. NO. DESCRIPTION UNIT QTY UNIT PRICE TOTAL PRICE 1I. Adjust Monitoring Well Frame and Cover to Grade EA 1 $ 900.00 $ 900.00 12. Adjust Water Valve Frame and Cover to Grade EA 2 $ 500.00 $ 1,000.00 13. Adjust Water Meter Box to Grade EA 37 $ 250.00 $ 9,250.00 14. Adjust Wastewater Cleanout to Grade EA 6 $ 250.00 $ 1,500.00 Schedule 1 Total $ 130,527.70 Schedule 2: Alley North of Elm Street, Garfield Street to Cherokee Lane ITEM EST'D. NO. DESCRIPTION UNIT QTY UNIT PRICE TOTAL PRICE 1. Traffic Control LS 1 $ 6,000.00 $ 6,000.00 2. Clearing and Grubbing LS 1 $ 3,000.00 $ 3,000.00 3. Roadway Excavation CY 530 $ 22.00 $1 1,660.00 4. Compact Original Ground SF 12,870 $ 0.35 $ 4,504.50 5. Concrete Subgrade Compaction SF 2,412 $ 1.60 $ 3,859.20 6. Asphalt Concrete TON 334 $ 80.00 $26,720.00 7. Concrete Alley Approach SF 982 $ 9.00 $ 8,838.00 8. Pervious Concrete Alley Gutter LF 715 $ 13.00 $ 9,295.00 9. Relocate Wastewater Service EA 1 $ 2,500.00 $ 2,500.00 Contract.DOC 3 02/02/10 ITEM EST'D. NO. DESCRIPTION UNIT QTY UNIT PRICE 10. Furnish Water Valve Frame and Cover EA 1 $ 650.00 11. Adjust Manhole Frame and Cover to Grade EA 12. Adjust Water Valve Frame and Cover to Grade EA 13. Adjust Water Meter Box to Grade EA 14. Adjust Wastewater Cleanout to Grade EA 6 $ 900.00 1 $ 500.00 23 $ 250.00 TOTAL PRICE $ 650.00 $ 5,400.00 $ 500.00 $ 5,750.00 29 $ 250.00 $ 7,250.00 Schedule 2 Total $ 95,926.70 Total = Schedule 1 plus Schedule 2 $ 226,454.40 ARTICLE V - By my signature hereunder, as Contractor, I certify that I am aware of the provisions cf Section 3700 of the Labor Code, which requires every employer to be insured against liabilityfor workers' compensation or to undertake self-insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this contract. ARTICLE VI - It is further expressly agreed by and between the parties hereto that, should there be any conflict between the terms of this instrument and the Bid Proposal of the Contractor, then this instrument shall control and nothing herein shall be considered as an acceptance of the said terms of said proposal conflicting herewith. ARTICLE VII - The City is to furnish the necessary rights-of-way and easements and to establish lines and grades for the work as specified under the Special Provisions. All labor or materials not mentioned specifically as being done by the City will be supplied by the Contractor to accomplish the work as outlined in the specifications. ARTICLE VIII - The Contractor agrees to commence work pursuant to this contract within 15 calendar days after the City Manager has executed the contract and to diligently prosecute to completion within 25 WORKING DAYS. WHEN SIGNING THIS CONTRACT, THE CONTRACTOR AGREES THAT THE TIME OF COMPLETION FOR THIS CONTRACT IS REASONABLEAND THE CONTRACTOR AGREES TO PAY THE CITY LIQUIDATED DAMAGES AS SET FORTH IN SECTION 6-04.03 OF THE SPECIAL PROVISIONS. CONTRACTOR AGREES THAT THIS AMOUNT MAY BE DEDUCTED FROM THE AMOUNT DUE THE CONTRACTOR UNDER THE CONTRACT. Contract.DOC 4 O2/O2/10 IN WITNESS WHEREOF, the parties to these presents have hereunto set their hands the year and date written below. CONTRACTOR: CITY OF LODI By: Title (CORPORATE SEAL) By: Blair King City Manager Date: Attest: City Clerk Approved As To Form D. Stephen Schwabauer City Attorney M- Contract.DOC 5 02/02/10 RESOLUTION NO. 2010-15 A RESOLUTION OF THE LODI CITY COUNCIL AWARDING CONTRACT FOR 2010 ALLEY RECONSTRUCTION PROJECT WHEREAS, in answer to notice duly published in accordance with law and the order of this City Council, sealed bids were received and publicly opened on February 2, 2010, at 11:00 a.m. for the 2010 Alley Reconstruction Project, described in the plans and specifications therefore approved by the City Council on January 6,2010; and WHEREAS, said bids have been checked and tabulated and a report thereof filed with the City Manager as follows: Bidder Bid George Reed, Inc. $ 226,454.40 G&L Brock Construction Bid Rejected A.M. Stephens Construction $ 257,378.80 Granite Construction $ 260,985.00 Knife River Construction $ 268,685.70 P.E. Pacific Engineering $ 271,272.40 Teichert Construction $ 303,342.60 Hensley's Paving, Inc. $ 313,165.82 Haskell & Haskell Company $ 321,463.99 Donniker Construction Bid Rejected Robert Bums Construction $ 323,892.92 WHEREAS, two bids were rejected for failing to include the mandatory addenda acknowledgements; and WHEREAS, staff recommends awarding the contract for the 2010 Alley Reconstruction Project to the low bidder, George Reed, Inc., of Lodi, California. NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council does hereby award the contract for the 2010 Alley Reconstruction Project to the low bidder, George Reed, Inc., of Lodi, California, in the amount of $226,454.40. Dated: February 17, 2010 -rrrrrrrrr...-%::-s::::::::.::::::::: I hereby certify that Resolution No. 2010-15 was passed and adopted by the City Council of the City of Lodi in a regular meeting held February 17, 2010, by the following vote: AYES: COUNCIL MEMBERS — Hansen, Hitchcock, Johnson, Mounce, and Mayor Katzakian NOES: COUNCIL MEMBERS — None ABSENT: COUNCIL MEMBERS — None ABSTAIN: COUNCIL MEMBERS — None &J(OHL City Clerk 2010-15