HomeMy WebLinkAboutAgenda Report - January 17, 1990 (66)CITY OF LODI PUBLIC WORKS DEPARTMENT 7O: City Council FROM: City Manager MEETING DATE: January 17, 1990 COUNCIL COMMUNICATION AGENDA TITLE: Contract Award for White Slough Water Pollution Control Facility Expansion Project, 12751 North Thornton Road RECOMMENDED ACTION: That the City Council award the contract (Base Bid witW-educt ve Alternates A and D) for the above project to Alder Engineering and Construction Company in the amount of $9,681,218.00. BACKGROUND INFORMATION: Bids on this project were first opened on November 1 t that time, the City received six bids ranging from approximately $12M to $16M. The engineer's estimate was $8.8M and since Lodi did not have sufficient funds to award the project as bid, the City Council rejected all bids on November 21, 1989. The City Council also approved a revised set of plans and specifications which removed certain items from the bid document and also provided for deductive alternate bids. Bids were again opened on December 15, 1989 and again six bids were received. These bids include a base bid plus six deductive alternates. The base bids ranged from $9.9M to 11.OM. Alder Engineering was low by over $500,000 based on the deductive alternates chosen. The submittal by the low bidder was challenged by the second low bidder, F&H Construction. On January 3, 1990, the City Council again rejected all bids and the project was again readvertised. On January '16, 1990, bids were opened and only two bids were received. Alder Engineering was again low bidder and F&H Construction submitted the other bid. Recaps of the January 16, 1990 and the December 15, 1989 bids are both shown on the attached sheeet. A recap of the base bids with deductive alternates A and D is shown below: Base Bid Deductive Alternate A Deductive Alternate D APPROVED: CWSWPCI7/TXTW.02M Alder F&H Engineering Construction $9,962,114 $10,347,000 [242,3601 [212,0001 38,536 48,0001 $9,681,218 $10,087,000 Difference $405,782 r FILE NO. January 17, 1990 City Council White Slough January 17, 1990 Page 2 The Finance Department has determined that we will have approximately $11,250,000 available. The expenditures to complete the project are estimated as follows: Construction Contract Contract Administration, Inspection and 0&M Manual Discharge Permit and Dilution Study Contingencies Estimated Cost Total Estimated Funds Available Jack L. Ronsko Publi Works Director Mt Attachment cc: City Attorney Finance Director Purchasing Officer Water/Wastewater Superintendent Black & Veatch $ 9,681,218 581,000 23,000 300,000 $10,585,218 $11,250,000 CWSWPCI7/TXTW.02M January 17, 1990 CITY CSF LODI PUBLIC WORKS DEPARTMENT COUNCIL COMMUNICATION TO: City Council FROM: City Manager NIETWJ DATE: January 17, 1990 AGENDA TITLE: Contract Awad for White Slough Water Pollution Control Facility Expansion Project, 12751 North Thornton Road The bid opening for this protebids, an award ct is scheduled for January 16, 1990. Assuming there are no problems with the recommendation will be made at the City Council meeting of January 17, 1990. i t.VUoi6koirector Pub is Works Direct, JLR/mt cc: Purchasing Officer Water/Wastewater Superintendent FILE NO. I w CWSWPCI6/TXTW.02M January 8, 1990 P— RESOLUTION NO. 90-11 A RESOLUTION OF THE LODI CITY COUNCIL AWARDING THE CONTRACT FCR WHITE SLOUGH WATER POLLUTION CONTROL FACILITY EXPANSION PROJECT, 12751 NORTH THORNTON ROAD aaa:==aaa==as=ao=c===aaaasaaza=a WHEREAS, in answer to notice duly published in accordance with law and the order of this City Council, sealed bids were received and publicly opened or. November 1, 1989 at 11:00 am for the contract for White Slough Water Pollutior, Control Facility Expansion Project, 12751 North Thornton Road, described in the specifications therefor approved by the City Council on July 19, 1989; and WHEREAS, at a noticed special meeting of the City Council held November 21, 1989, the City Council : 1) rejected a I I bids received on November 1, 1989, since the City had insufficient funds to award the project; 2) approved a revised set of plans and specifications removing certain items from the bid document; and 3) authorized readvertising of bids for the project; and WHEREAS, in answer to notice duly published in accordance with law and the order of this City Council, sealed bids were received and publicly opened on December 15, 1989 at 11:00 am for the above described project; and WHEREAS, based on the findings that the low bidder, Alder Engineering and Construction, had omissions in their bid which made it nonresponsive, and that the second lowest bid of F & H Construction Company was approximately $500,000 higher than the low bid, the City Council at its regular meeting of January 3, 1990 again rejected all bids and authorized readvertising of bids for the project; and WHEREAS, in answer to notice duly published in accordance with law and the order of this City Council, sealed bids were received and publicly opened on January 16, 1990 at 11:00 a.m. for the above described project, and only two bids were received. Alder Engineering was again low bidder and F&H Construction submitted the other bid; and WHEREAS, recaps of the January 16, 1990 and the December 15, 1989 bids are both shown on Exhibit A attached hereto; and WHEREAS, said bids have been compared, checked, and tabulated and a recap of the base bids with deductive alternates A and D has been filed with the City Manager as follows: 4 Resolution No. 90-11 Januar 17, 1990 Page YW Base Bid Deductive Alternate A Deductive Alternate D Alder Engineering $9,962,114 [242,360 38,536 $9,681,218 Difference $405,782 F&H Construction $10,347,000 (212,000 48,000 $10,087,000 WHEREAS, the City Manager recommends that award of the contract for White Slough Water Pollution Control Facility Expansion Project, 12751 North Thornton Road (Base Bid with Deductive Alternates A and D), be made to Alder Engineering and Construction, Salt Lake City, Utah; NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Lodi that award of contract for White Slough Water Pollution Control Facility Expansion Project, 12751 North Thornton Road be and the sane is hereby awarded to Alder Engineering and Construction in the amount of $9,681,218. Dated: January 17, 1990 I hereby certify that Resolution No. 90-11 was passed and adopted by the City Council of the City of Lodi in a regular meeting held January 17, 1990 by the following vote: Ayes: Council Members - Hinchman, Olson, Reid and Snider (Mayor) Noes: Council Members - Pinkerton Absent: Council Members - None ']—knife". Perrin Deputy City Clerk for Alice M. Reimche City Clerk 90-11 RES9011/TXTA.02J -... -- 1 jU - I IT A City of Lodi White Slough Water Pollution Control Facility Expansion Bid Tabulations Bid Opening: 11: 00 am, Dec. 15,1989 Carnegie Forum, Lodi CA Rebid f.".,. I -'N V. Deductive Alternates Bidder f Base Bid $ a krwion am t o-F*Qc-w*'L'wpwmELEw*'F- Add SO M" Alder Engineering & Const. $ 9,933.405. 227.294.! 326,671.1 152,108.1 92,4N. 5.000.1 0. Salt Lake City, UT ........ ....... .. .... ...... ... ........ • F&H Construction I s 10,397,000. '1 181,000.1 212,370.1 247.600.' 45,000j 4,494. OR Stockton. CA • •ims - - —w- KaweahConstructlon $ 10,650,000.1 200,000.1 320,000.! 210.000.1 40,000.1 3,000.1 0. Fresno, CA Idid not rebid I I i Dan Caputo CO. S 10.667.000. 296.000.! 98.500.: 186.000. 44,000.1 30,000. { 30.000. San Jose, CA j did not rebid Gateway/Mark$ 10,796,500. 240,417.1 222,969.! 136,461.' 53,052.! 3,559. 30,000. Sacramento,CA idid notrebid C.W. Roen Construction S 10,977,400. 257.000.: 215.000.: 285.000. 43,000.1 25,000.) 1,000. Danville, CA did nor rebid !Engineer's Estimate S 10,700.000. r-7-7 -... -- 1 jU - I IT A