Loading...
HomeMy WebLinkAboutAgenda Report - January 4, 1989 (33)•- CITYOF LORI • PUBLIC WORKS DEPARTMENT TO: FROM: NEEM DATE: City Council City Manager January 4, 1989 Project Data O r ig i n a 11 y Budgeted: Budgeted Fund : Amount Budgeted: Total Project Estimate Bid Opening Date: 1987/88 140-502.64-323 $50,000.00 (this phase): $100,000.00 12/20/88 AGENDA TITLE. Award Contract for Installation of Mechanical Equipment and Iry Roof on Cafetei is Building at Hutchins Street Square, 600 West Oak Street BACKGROUND INFORMATION: This project consists of re -roofing the cafeteria building with a sing a -ply roof membrane system, locating and tying in two 15 -ton air conditioning units salvaged from the demolished Hale Park building, and providing electrical requirements to service those units. Bids were opened for this project on Tuesday, December 20, 1988, and three bids were received: Diede Construction $83,997.00 Don Hughes Construction $93,373.00 Modem Engineering $94,630.00 The cost is higher than the original estimate because of several reasons: - Additional structural wojk is needed to strengthen the glue -laminated beam over which the air conditioning equipment is located. - The re -roof is a single -ply, long-term roof that was not originally planned,for. The original estimate was for patching the existing roof. Structural engineering was necessary. Electrical engineering and upgrading of the existing electrics service is necessary. It is recommended that the City Council award the contract to Diede Construction for $83,997.00. Total funding for the project, including inspection, contingencies, architectural fees , and struci',iral engineering , +vi 11 be approximately $100,000. The method of funding will be discussed with the City Council at the January 4'e1989 meeting. cc: Purchasing Officer Jac L. Ronsko Bu i i d i n & Equip. Maint. Supt. Publ 'c Woks Director . Center Director Pit ED: FILE N0. O 4 -- CHUTCHI8/TXTW.02M December 28, 1988