CITY OF LODI COUNCIL COMMUNICATION
AGENDA TITLE: Contract Change Order, White Slough Water Pollution
Control Facility Capacity Expansion Improvements,
12751 North Thornton Road
MEETING DATE: November 6, 1991
PREPARED BY: Public Works Director
RECOMMENDED ACDON: This item is for information only, no action is required.
ACKGROUND INFORMATION: This information is being given to the City Council in
accordance with the Contract Change Order Policy approved
by Resolution 85-72. One of the requirements of this
policy is that vve inform the City Council of all change
orders in excess of $25,000. Attached Contract Change Order #6, approved by the
City Manager, was in the amount of $66,954 which is .7% of the contract. This
Change Order includes additional asphalt paving,painting, existing sludge digester
No. I and 2 repair, chlorine building electrical and instrumentation wiring,
Digester No. 3 handrail, pipe supports, modification top OWP-N1, as well as
deletion of the following items from the contract, grit ho per cover, isolation
,transformers at SSPS, bubbler panel tubing, plug valves (2r, and granular fill at
1 he irrigation ditch. A complete description of the work and backup data is in the
I ublic Works Department files. The time of completion was extended allowing 36
a,dditional days for this Change Order.
- e total cost of all change orders to date, including Change Order #6, is $376,598,
&r,3,r gf the contract. The oriinal contraf price was $9,681,218. The contract
price inc uding change orders is 110,057,816.
$300,000 was budgeted for change orders and other contingencies on the
White Slough Water Pollution Control Facility Expansion Project. A
special allocation will be processed at the. time of completion to cover
this and any additional &rpm,
Ja k L. Ronsko
Prepared by Sharon Blaufus , Administrative Assistant
JLR/SB/lm
cc: Finance Dept.
Attachment
APPROVED:
CWSWPC25/TXTW.02M (CO -COM)
AAS A. PeTi RS /'
City Manager
4"A
Ivor
cc -1
Octob-er 28, 1991
CITY OF L001 i
PUBLIC WORKS DEPARTMENT
0 C 17 91 CONTRACT CHANGE ORDER NO. 6
V"
Sheet 1 of 3
Date Qctober 1. 1991
Account No. 17TqT0=bu
PROJECT: White Slough Hater Pollution Control Facilities
Capacity Expansion Improvements
CONTRACTOR: Alder Engineering and Construction Co.
3939 South 500 West
Salt Lake City, UT 84123
You are directed to make the following changes or do the following work not included
in the Plans and Specifications on this contract.
..................................................................................
Description of work to be done, estimate of quantities, and prices to be
paid. Specify whether additional work is at contract price, agreed
price, or force account. Unless otherwise stated, rates for rental of
equipmerit cover only such time as equipment is actually used and no
allowance will be wade for idle time.
The major items for this $66,954. change order includes, additional asphalt paving,
painting, existing sludge digesters No. 1 and 2 repair, chlorine bldg. electrical
and instrumentation wiring, .Digester No.3 handrail, pipe supports, modification to
pump UNP -H1, and a contract time extension for 36 days -
The following items were deleted for a credit to the contract, grit hopper cover,
isolation transformers @ SSPS, bubbler panel tubing, plug valves (2), and granular
fill at the irrigation ditch.
Percent of
Contract
Original Contract Price $ 9.681.218.00
Total Cost of This Change Order NOT TO EXCEED $ 66.954.00 0.7 %
Previous Change Orders $ 309,644.00
Total Cost of All Change Orders to Date $ 376,598.00 3.9 %
Contract Price, Including All Change Orders, will be: $10.057,816 AO
Time of completion will
By - --------
Submitted
Approval Reiommende
Approved, P is Hor �r coria _- Date
CCOroved, gt�ha e o 0 or 1 eact CCO or $25,000 totar—
Date /o /p-
The undersigned contraRVr %M& carefully considered the change proposed, agrees,
if this proposal is approved, to provide all equipment, furnish all materials,
except as othemise noted above, perform all services necessary for the work above
specified, and accept as full payment the prices shown above.
ACCEPTED n
Pate i0 �i Contractor Gwen nginLlprinn and Gongmoo.
ByTitle Project Manager
W 6.r,/)p
be adjusted as follows: 36 additional days _(Nov 8, 1991)
5 ------! ------------- - -----Date
2 IV
If the Contrartor des not sign acceptance of this order, the Contragtor should
refer to the General Conditions regarding filing a written protest within the
specified time.