CITY OF LODI
,. COUNCIL COMMUNICATION
AGENDA TITLE: Conduct a Public Hearing to Consider the Adoption of a Resolution to Update the
Planning Division's Hourly Rate and Setting Various Fire Inspection Fees.
MEETING DATE: November4,2009
PREPARED B Y Community Development Department
RECOMMENDEDACTION: Conduct a public hearing to consider the adoption of a resolution to
update the Planning Division's hourly rate and setting various fire
inspectionfees.
BACKGROUND INFORMATION: In June 2006, the City Council adopted the Planning Division hourly
rate for billing purposes and setting the deposit amounts for various
Planning applications. Since that time, the cost for personnel and services has increased. A new analysis
was prepared by the Finance Department that indicates the fully burdened rate for Planning services to
be $132.00 per hour.
In August 2008, the City contracted with the firm MGT of America to prepare a cost of services analysis
that would meet legal requirements and methodologyfor Building -related fees (this report is available for
review upon request). The City Council adopted this methodology and a new fee schedule earlier this
year. The fully burdened hourly rate for Building services was set at $135.00 per hour. As part of this
year's budget, the Community Development Department took on the tasks of providing Fire Inspection
services for development related projects. We are now looking to apply the Building services hourly rate
to those services. In 2005, the current Fire Department Fee schedule was approved by the City Council.
That schedule based Fire Department fees at a rate of $75.00 per hour. The fees shown in the attached
table have been increased as a result in the difference in hourly rate from $75.00 per hour to $135.00 per
hour.
The Building Industry Association has been notified about these fee changes. To date they have not
provided any comment/concern.
FISCAL IMPACT: There should be a positive fiscal impact as a result of the recommended action
by relating the revenue collected to the actual cost of service. The Community
Development Department operates as a Special Revenue Fund which looks to
set rates in order to not burden the General Fund for private development.
FUNDING AVAILABLE: N/A
Attachments
t
KorradfBartlam
Community Development Director
APPROVED:
Pair K' g, City Manager
2009/10 Planning Division Hourly Rate
Planning Staff
Direct hourly rate
$
78.90
Internal overhead hourly rate
$
15.90
External overhead hourly rate
$
19.87
Planning Division Hourly Rate
$
114.68
15% reserve
$
17.20
Total Rounded
$
132.00
Direct Cost
Planning Staff
142,228
Supplies/Materials
41,775
184,003
Billable hours
2332
Direct hourly rate
78.90
Internal Overhead Cost
Planning Commision (100%)
3,400
Administrative Secretary (40%)
33,680
37,080
Billable hours
2332
Internal overhead hourly rate
15.90
External Overhead Cost
Allocated Costs 2009 Revision
46,344
Billable hours
2332
External overhead hourly rate
19.87
New Development and Tenant Improvements
Plans Review Fee
Site Planning
150+
Annexation
150+
Land Use
150+
Lot Line Adjustments
150+
Parcel Map
150+
SPARC
150+
Zoning Variance
150+
Subdivision/Lot Splits
225+
1- 4 Lots
150
5 - 24 Lots
300
25 or more Lots
450
Fire & Life Safety Plans Review and Inspections
Fire Review of Building Construction
Add 25% to building plan check & permit fee
Certificate of Occupancy (Fire) X135+
Fire Protection Equipment Plans Review and
Inspections
Civil Improvement Site Plan (no underground
inspection) 4270+
Compressed Gas System (each)
Hazardous Materials 376+675+
Medical Gas 450810+
Fire Alarm System 450+-810+
Fire Alarm System for Fire SprinklerMonitor388+540+
Fire Flow/Hydrant Test 150+270+
Fire Pump 900+1620+
Fire Sprinkler (per riser)
1- 6 Heads 225 405
7 - 19 Heads 374-675
20 - 99 Heads 7-501350
100 - 199 Heads 4-050 1890
>= 200 Heads (plus 0.50 per head) 4-,3502430
Halon/Clean Agent System 450+810+
Hood & Duct Fire Suppression System*(each)300+540*
*hood requires separate building permit
Plan Maintenance Fee*Add 5% 10%to plan check fee
*compressed gas systems, fire alarm system,
alarm system for sprinkler monitor, fire pump,
fire sprinkler system, halon/ clean agent system,
hood & duct suppression system, spray booth,
standpipe/ hose stations
Smoke Management Systems 750* 1350+
Spray Booth (each) 450-810+
Standpipe/Hose Stations -270+
Miscellaneous Devblopment Fee
Administrative Charge
Design Review Consultation/Conference 75+
Minimum Intake Fee (not otherwise specified) -75 135
Second and Subsequent Plan Revision
Submittals (each) 450-270
Temporary Certificate of Occupancy 150
Special Plan Review Request
After Hours 225$405+
Not Otherwise Specified 4270+
Cancellation— < 24 hours notice, not ready,
no show 75-135
Technical Report/Alternate Materials or Methods*
*per code item plus consultantfee plus 20%
admin fee 4270+
Annual Fire and Life Safety Inspections
State Mandated Inspections
E-3 Occupancies—Day Care
7 -49 clients
150+
50 -149 clients
187.50+
>= 150 clients
225+
Pre -inspection <= 25 clients
50
Pre -inspection> 25 clients
100
Occupancies—Institution
150+
1-1 or 12 occupancies < 6 patients
150+
1-1 or 12 occupancies >= 6 patients
225+
1-3 occupancies (detention)
no charge
R-1 Occupancies—Apartments/Hotels/Motels
3 - 16 units
112.50+
17-32 units
150+
>= 33 units
187.50+
R-2 Occupancies—Residential Care Facilities
Contact not at scene in 60 minutes
>= 7 residents
225+
Pre -inspection < 25 residents
50
Pre -inspection>= 26 residents
100
R-3 Occupancies—Large Family Day Care
75+
7 - 14 clients
75+
Pre -inspection
50
R-6 Occupancies—Halfway Houses, etc.
admin fee
>= 7 residents
225+
Pre -inspection < 25 residents
50
Pre -inspection >= 26 residents
100
Business Fire & Life Safety Inspections
Fire Company Business Inspection
Initial plus 1 re -inspect no charge
Additional re-inspections(each) 75+
Miscellaneous Charges Fee
Administrative Charge
Appeals (Fire Chief denies application) 250
Environmental Impact Report Document Search
75+
OtherActivities Not Listed
74+-135+
Refund Processing
3.50 67.50
Weed Abatement (per parcel)
150+
Emergency Response (per company)
Hazardous Materials
131+
False Alarms—2 or fewer per calendar
year
no charge
Third False Alarm
75
Fourth False Alarm
150
Fifth and Subsequent (each)
393
Contact not at scene in 60 minutes
131
Failureto notify LFD of test
131
Fire Investigations (per person)
75+
Fire Reports and Other Documents (per page) 0.25
Investigation —NoConstruction Permit
75+
Occupancy Load Calculation
75+
Photograph Reproduction (per print)
Actual cost plus 20%
admin fee
Standby (per person)
75+
Standard Hourly Rate
LFD Personnel
75
Engine or Truck Company
131
+ Minimum Fee, actual cost may vary
Fees based on $7-5 $135 per hour (in quarter-hour
increments)
RESOLUTION NO. 2009-157
A RESOLUTION OF THE LODI CITY COUNCIL
APPROVING THE PLANNING DIVISION HOURLY
RATE AND SETTING VARIOUS FIRE CODE
RELATED FEES
WHEREAS, the Lodi Municipal Code requires the City Council to set fees for various
services provided by the City of Lodi to recover the costs associated with providing specific
services and programs.
NOW, THEREFORE, BE IT RESOLVED that the City Council finds as follows:
That the Planning Division hourly rate of $132.00 per hour attached hereto as
ExhibitA, is approved; and
2. That the Fire Code related permit/inspection fees attached hereto as
Exhibit B, are approved; and
3. All resolutions or parts of resolutions in conflict herewith are repealed insofar
as such conflict may exist; and
4. This resolution shall be published one time in the "Lodi News -Sentinel," a daily
newspaper of general circulation printed and published in the City of Lodi, and
shall be in force and take effect on December 4, 2009, which date is at least
thirty (30) days after the passage of this Resolution.
Dated: November 4, 2009
----------------------------------------------------------------------
----------------------------------------------------------------------
hereby certify that Resolution No. 2009-157 was passed and adopted by the City
Council of the City of Lodi in a regular meeting held November 4, 2009, by the following vote:
AYES: COUNCIL MEMBERS —Hitchcock, Johnson, Katzakian, and
Mayor Hansen
NOES: COUNCIL MEMBERS — None
ABSENT: COUNCIL MEMBERS — Mounce
ABSTAIN: COUNCIL MEMBERS — None
g1I11sX&fl
EXHIBIT A
Direct hourly rate
Internal overhead hourly rate
External overhead hourly rate
Plannina Division Hourly Rate
15% reserve
Th+a V,14 u:.
n -AM'
Y Rate:
142,228
$
78.90
$
15.90
$
19.87
$
114.68
$
17.20
$�
132.00
Planning Staff
142,228
Supplies/Materials
41,775
184,003
Billable hours
2332
Direct hourly`rafie
Internal Overhead Cost
Planning Commision (100%)
Administrative Secretary (40%)
Billable hours
3,400
33,680
37,080
2332
Internal overhead hourly rate 15.90 1
External Overhead Cost
Allocated Costs 2009 Revision
Billable hours
46,344
2332
Ecternal overhead hourly
i
New Development and Tenant Improvements
Plans Review Fee
Site Planning
150+
Annexation
150+
Land Use
150+
Lot Line Adjustments
150+
Parcel Map
150+
SPARC
150+
Zoning Variance
150+
Subdivision/Lot Splits
225+
1- 4 Lots
150
5 - 24 Lots
300
25 or more Lots
450
Fire & Life Safety Plans Reviewand Inspections
Fire Review of Building Construction
Add 25% to building plan check & permitfee
Certificate of Occupancy (Fire) 75+-135+
Fire Protection Equipment Plans Review and
Inspections
Civil tmprovement Site Plan (nounderground
inspection) 4-58-+-270+
Compressed Gas System (each)
Hazardous Materials 37-5+675+
Medical Gas 458+-810+
Fire Alarm System 4810+
Fire Alarm System for Fire Sprinkler Monitor388#-540+
Fire Flow/Hydrant Test 450+ 270+
Fire Pump 909-+ 1620+
Fire Sprinkler (per riser)
1 - 6 Heads 225 405
7 -19 Heads 374-675
20 - 99 Heads 758 1350
100 - 199 Heads 4-,9501890
1890
>= 200 Heads (plus 0.50 per head) 4;59 2430
Halon/Clean Agent System 450--810+
Hood S Duct F%e Suppression System*(each)300-+540+-
"hood requires separate building permit
Plan Maintenance Fee*Add 514 10% to plan check fee
*compressed gas systems, fire alarm system,
alarm system for sprinkler monitor, fire pump,
fire sprinkler system, halon/ clean agent system,
hood & duct suppression system, spray booth,
standpipe/ hose stations
Smoke Management Systems 759-- 1350+
Spray Booth (each) 4a8$ 810+
Standpipe/Hose Stations 458---270+
0scellanebus Dene ,op -men Fee
Administrative Charge
Design Review Consultation/Conference 75+
Minimum Intake Fee (not otherwise specified)74 135
Second and Subsequent Plan Revision
Submittals (each) 4W270
Temporary Certificate of Occupancy 150
Special Plan Review Request
After Hours 225+405+
Not Otherwise Specified 49)-+270+
Cancellation —< 24 hours notice, not ready,
no show X135
Technical Report/Alternate Materials or Methods*
*per code item plus consultantfee plus 20%
admin fee 458$-270+
Annual Fire and Life Safety inspections
Sfafe Mandatedlnspecdons
E-3 Occupancies—Day Care
7 -49 clients
150+
50 -149 clients
187.50+
>= 150clients
225+
Pre -inspection<= 25 clients
50
Pre -inspection> 25 clients
100
I Occupancies—Institution
67,50
1-1 or 12 occupancies< 6 patients
150+
1-1 or 1-2 occupancies>= 6 patients
225+
1-3 occupancies (detention)
no charge
R-1 Occupancies—Apartments/Hotels/Motels
3 -16 units
112.50+
17-32 units
150+
>= 33 units
187.50+
R-20ccupancies—Residential Care Facilities
393
>= 7 residents
225+
Pre -inspection < 25 residents
50
Pre -inspection >= 26 residents
130
R-3 Occupancies—Large Family Day Care
7 -14 clients
75+
Pre -inspection
50
R-6 Occupancies—Halfway Houses, etc.
>= 7 residents
225+
Pre -inspection< 25 residents
50
Pre -inspection= 26 residents
100
Business Fire & Life Safetylnspections
Fire Company Business Inspection
Initial plus 1 re -inspect no charge
Additional re-inspections(each) 75+
Miscellaneous Charges Fee
Administrative Charge
Appeals (Fire Chief denies application)
250
Environmental Impact Report DocumentSearch
75+
OtherActivities Not Listed
76+-135+
Refund Processing 3.59
67,50
Weed Abatement (per parcel)
150+
Emergency Response (per company)
Hazardous Materials
131+
False Alarms -2 or fewer per calendar year
no charge
Third False Alarm
75
Fourth False Alarm
150
Fifth and Subsequent (each)
393
Contact not at scene in 60 minutes
131
Failureto notify LFD of test
131
Fire Investigations (per person)
75+
Fire Reports and Other Documents (per page) 0.25
Investigation—No Construction Permit
75+
Occupancy Load Calculation
75+
Photograph Reproduction (per print)
Actual cost plus 20%
admin fee
Standby (per person)
75+
Standard Hourly Rate
LFD Personnel
75
Engineor Truck Company
131
+M nir=Fee,actualcostmayvary
Fees based on $75 $135 per hour (in quarter-hour
increments)
EXHIBIT B
Planning Table Fee
2009/10 Planning Division Hourly Rate
Direct hourly rate $ 78.90
Internal overhead hourly rate $ 15.90
External overhead hourly rate $ 19.87
Planning Division Hourly Rate $ 114.68
15% reserve $ 17.20
Total Rounded $ 132.00
Planning Table Fee
Direct Cost
Planning Staff 142,228
Supplies/Materials 41,775
184,003
Billable hours 2332
Direct Hourly Rate $ 78.90
Internal Overhead Cost
Planning Commision (100%) 3,400
Administrative Secretary (40%) 33,680
37,080
Billable hours 2332
Internal Overhead Hourly Rate $ 15.90
Planning Table Fee
External Overhead Cost
Allocated Costs 2009 Revision 46,344
Billable hours
Internal Overhead Hourly Rate
2332
19.87
Fire Table Fee
Fire Protection Equipment Plans Review and Inspections
Fee in $
Civil Improvement Site Plan (no underground inspection)
+56+
270+
Compressed Gas System (each)
Hazardous Materials
3761
675+
Medical Gas
-4580
810+
Fire Alarm System
456*
810+
Fire Alarm System for Fire Sprinkler Monitor
566*p
540+
Fire Flow/Hydrant Test
458*
270+
Fire Pump
-9ee+
1620+
Fire Sprinkler (per riser)
1 - 6 Heads
mL2&
405
7 - 19 Heads
3-il&
675
20 - 99 Heads
1-5)-
1350
100 - 199 Heads
4-,656
1890
>= 200 Heads (plus 0.50 per head)
1,556
2430
Halon/Clean Agent System
45e+
810+
Hood & Duct Fire Suppression System(each)
366+
540+
Plan Maintenance Fee add to Plan Check amount
-50
10%
Smoke Management Systems
-TM+
1350+
Spray Booth (each)
-450+
810+
Standpipe/Hose Stations
158
270+
Fire Table Fee
Miscellaneous Development
Fee in $
Administrative Charge
Other Activities Not Listed
Minimum Intake Fee (not otherwise specified)
-�.r
135
Second and Subsequent Plan Revision Submittals (each)
+5&
270
Special Plan Review Request
After Hours
225*
405+
Not Otherwise Specified
150
270+
Cancellation— < 24 hours notice, not ready, no show
�,r
135
Technical Report/Alternate Materials or Methods*
*per code item plus consultant fee plus 20% admin fee
45&+
270+
Certificate of Occupancy (Fire)
-7.5+
135+
Miscellaneous Charges
Fee in $
Administrative Charge
Other Activities Not Listed
-7-f* 135+
Refund Processing
9:7.56 67.50
OFFICERS
Mahesh Ranchhod
American -USA Homes
Jeremy White
The Grupe Company
Randy Bling
Florsheim Hanes
Dudley McGee
Kimball Hill Homes
Debbie Armstrong
Old Republic Title Company
Matt Arnaiz
H.D. Arnaiz Corporation
Rod Attebery
Newniller& Beardslee
Ramon Batista
River Islands@ Lathrop
Rey Chavez
Kelly=Moore Paint Company
Ryan Gerding
Pulte Homes
Cathy Ghan
Oak Valley Coininunity Bank
Steve Herum
Herum Crabtree Brown
Wayne LeBaron
LeBaron Ranches
John Looper
Top Grade Construction
Terry Miles
Teich ert Construction
Carol Ornelas
Visionary Home Builders, Inc.
Jim Panagopoulos
A.G. Spans Companies
Dennis Bennett
Bennett Development
Bill Fihos
AKF Development, LLC
Mike Hakeem
Hak=n, Ellis& Marengo
Jeffrey Kirst
Tokay Development
Steve Moore
Westervelt
Zandra Morris
Old RepublicTitle Company
Toni Raymus
Raymus Homes, Inc.
Tony Souza
Souza Realty & Development
BUILDING INDUSTRY ASSOCIATION
OF THE DELTA
315 N. SAN JOAQUIN ST., SUITE 202
STOCKTON, CA 95202
209-235-7831.209-235-7837 fax
November 3,2009
Mayor Larry Hansen
City of Lodi
221 W. Pine St.
Lodi, CA 95240
Re: Lodi City Council Agenda Item H-01
Mayor Hansen,
The BIA would like to express our concerns regarding the Planning
Division's hourly rate fee update. We have two issues we would like to
raise at this time.
The first issue is the inclusion of a 15% increase to the fee amount for
reserves. Although we are supportive of a 15%reserve policy the support
for a policy allowing a fee-based department to maintain a reserve of 15%
is very different from an increase in fees of 15% designed to achieve the
15%more quickly.
Conceptually a reserve policy should allow a department to accumulate
excess revenues during economic boom times in order to cover losses
during downturns tben business activity has dropped off. Without a
reserve policy in place when a city accumulates excess revenues from fees
the city is mandated to reduce the fees. Even with a reserve policy of 15%
when a city accumulates a reserve account of 15% the city is still
mandated to reduce the fees so as to not collect more in fees than the cost
of the services provided. To do otherwise would be a violation of the
Mitigation Fee Act.
The proposal before the Council calls for an increase in planning fees by
$17.20 per hour for reserves. Accumulating reserves is not a cost to the
city. Accumulating reserves is a prudent management strategy supported
by the BIA. But this management strategy does not create a reimbursable
cost to the city for which they may charge a fee. We request the line item
of 15%reserve at $17.20 per hour be removed from the planning fee
update.
R-
Mavor Hansen
November 3. 2009
Page 2 cf2
We also are concerned about the timing of this fee update. The "Great
Recession" has caused financial hardships to all the cities of California
and we sympathize with the City's need for revenues. However, instead
of raising the cost of doing business in Lodi we strongly encourage the
City to take a stimulative approach and encourage business activity in
Lodi by j oining with the 94 other government entities who have either
reduced or deferred development fees. Attached you will fmd the Local
Impact Fee Deferral/Reduction Matrix compiled by the California
Building Industry Association.
We would like the City to defer all impact fees to either the close of
escrow or certificate of occupancy. Furthermorewe ask the City to offer a
one year reduction of building fees of 50%. These actions will spur new
construction activity and through the increase in sales tax and property
taxes achieved, provide more than adequate compensation to the City's
general fund to offset any losses in building fees.
This last year has proven the connection between a robust construction
sector and robust city revenues. The sooner that construction is resumed
the sooner our local economy will recover leading to rising city revenues.
S tqcerely,
John R. Beckman
Chief Executive Officer
2
Local Impact Fee Deferral/Reduction
Matrix
9-3-09
Fee
]D.A +;-. Fees Deferred or Reduced
Date Deferral/
Reduction
Ordinance Became
Effective
Date
Deferral/Reductio
n Ordinance
Expires
!if snvl
Bonding or
Letter of
Fee Payment Credit
n'Aarmd Until Ramdramenta
Upon Certificate of
NO
'County of Fresno • Fire Facilities
2002
None
• Police Facilities
occupancy
• Parks Capital
• Quimby Parkland
• Traffic Signal
• Major Street
• Community Sanitation
Total deferred - $11,856
City of Fresno
Parks and Fire fees extended to about a dozen July 30
Nearly unlimited
developers (970 residential lots)
extension
Savings of about $3.4 million.
City of Clovis
• Fire Facilities 1998
None
Upon close of
NO
• Police Facilities
escrow
• Parks Capital
• Traffic Signal
• Major Street
• Community Sanitation
• Underground Utilities
Total deferred - $15,601
county of Imperial
• General Government; SF $1,699, MF $977 April 1,2008
12 months w/
At application for
NO
• Sheriff; SF $936, MF $727
possible 12 month
Certificate of
• Parks and Recreation; SF & MF $452
extension
Occupancy/ Final
• Fire; SF $1,273, MF $977
Inspection
• Public Works; SF $1,894, MF $1,453
Total deferral: SF $6,254, MF $4,933
Rp
Imperial County Air Pollution
Rule 310 Operational Development Fees Cut
February 3,2009
12 months w/
At application for
NO
Control District (DC)
by 50% to:
possible 12 month
Certificate of
• $258.00/SFU
extension
Occupancy/Final
• $196.50/WU
Inspection
• $0.80/s .ft. Com
City of Brawley (DC)
Development Impact Fees
January 1,2008
Undetermined
At Building Permit
NO
Delayed increase of $8,596
City of El Centro (DC)
Development Impact Fees
June 1,2008
Undetermined
On a case-by-case
Negotiated
basis after meeting
w/ builder and a
review of market
conditions
(4) El Centro School Districts
School Fees —
May 1,2009
N/A
City has backed the
NIA
(DC)
Average Combined $5.00/sq. ft.
industry, denied
McCabe Elementary
Demanding$15.10- $18.00/sq.ft.
MarshallKrupp's
Central Union High School
Extorting thru delay tactics in CEQA process
(Districts) tactics,
Heber Elementary
approved EIR
El Centro Elementary
City of Imperial (DC)
Development Impact Fees
August 1,2008
12 months w/
At application for
Negotiated
possible 12 month
Certificate of
signed
extension
Occupancy/Final
agreementat
Inspection
building
permit
7
County of Madera
Street Impact Fees
2000
None
Upon Certificate of
NO
occupancy
City of Madera
• Park Facilities
2001
None
Upon Certificate of
NO
• Street Impact
occupancy
• Traffic Signal
City of Irvine
• System Development Charges
Approved
7/23/2009
Upon issue of
NO
7
• IBC Development Impact Fees
Certificateof
• Park Fees
occupancy
• Street Slurry Seal Fees
• Affordable Housing In -Lieu Fees
Total deferral- Up to $33,000 per unit
Reduced DIF fees by 26% for 5 years
City of Santa Ana
One year deferral up to $15,852
Approved
10/1/2009
Upon issue of
NO
Certificate of
7A decrease in Building & Planning Fees
occupancy
City of Mission Viejo
Permanent deferral of all DIF's
Approved
None
Upon issue of
Certificate of
occupancy
County of Orange
Impact Fees — does NOT include Police or
Approved
5/8/2009
Upon issue of
NO
Fire
Certificateof
occupancy
Total deferral- Up to $40k per unit
7% decrease in Buildin & Planning Fees
City of Orange
. Police facility fee
• Park impact fees
Approved
None
Upon issue of
Certificate of
NO
• Library impact fees
occupancy
• Fire protection facility impact fees
• Transportation systems improvement
program fees
• Quimby park fees
Total deferral - Up to $13k per unit
City of Anaheim
• Parks
Approved
7/5/2010
Upon issue of
NO
• Electrical Service fee
Certificate of
• Drainage fee
occupancy
• Signal impact fee
• Traffic and Roads impact fee
Total deferral- Up to $10k per unit
differed
City of Tustin
TBD —Based on density
Approved
10/1/2009
City of Huntington Beach
Total Deferral —up to $30,000
Approved
3/30/2010
City of Costa Mesa
TBD Deferral Program
Pending
City of Fullerton
TBD Deferral Program
Pending
Anaheim Union High School
School Fees - $20,000
Approved
12/31/2009
Upon issue of
District
Certificateof
occupancy
OC SanitationDistrict Enabling Resolution for Deferral —Approx
Approved
7/31/09
$5,000
County of Riverside
Impact Fees
7/14/09
At application for
Certificate of
Reduced fees by 50%
Occupancy/ Final
Pbs: $4,057
Inspection
Savings: $2,028.50
Deposit Based Fees for Transportation/Plan
16 -Jan -08
None
Depositpriorto
Check
inspection 2%
instead of 3 of
construction cost -
$50,000 max,
initial deposit
Deposit Based Fees for
16 -Jan -08
None
Depositpriorto
Transportation/Inspection Fees
inspection 3%
removed deposit
for water and sewer
construction costs -
$75,000 max.
initial deposit
City of Banning
• Administrative program processing fee
5 -Mar -08
12 months
Upon issue of
• Development impact fee
Certificate of
• Fire protection facilities fee
Occupancy
• General facility and equipment fee
• General plan
• Parklandfee
• Police facilities fee
• Solid waste facility and equipment fee
• Traffic control facility fee
• Water capital facilities fee
City of Indio
Quimby Fees - $2,193.75 per unit
19 -Dec -07
None
From Map
Application to
Building permit
City of Moreno Valley
Impact Fees - $13,745
8 -Jan -08
None
Upon issue of
Certificate of
occupancy
City of Palm Desert
Planning and ServiceFee Increase
13 -Dec -07
Six (6) months w/
At submittal for
N/A
possible extension
service deposit
based
City ofBeaumont
$5,217/DU reduction (32%) in Development
February 2009
July 2012
Impact Fees and a deferral of DIF collection
until "prior to final building inspection"
�ity of Corona
401/o reduction of development impact fees
Approved (5/6/2009)
Two years (May
2011)
�ity of Perris
Fees reduced by 50%
6/30/09
Upon issue of
Certificate of
Pbs:$12,668
occupancy
Savines: $6.334.00
Perris High School District
School fees reduced by $2,960.00
City of Lake Elsinore
Deferral of all impact fees to COO
Upon issue of
Certificate of
occupancy
City of Hemet
Deferral of all impact fees to COO
Upon issue of
Certificate of
occupancy
City of San Jacinto
Deferral of all impact fees to COO
Upon issue of
Certificate of
occupancy
Eastern Municipal Water District
District postponed the imposition of an
April 1,2009
July 1,2009
approved fee increase of over $3,000 per
EDU.
(Approved (May, 2008) but not instituted fee
$10,427.00/EDU. Fee until July 1,2009
$7,275/EDU. Savin s:$3,152.00/ED
Western Riverside Council of
TUMF Master Ordinance
Upon issue of
Governments
Certificate of
occupancy
City of Menifee
Development Impact Fee's cut by 65%
July 7,2009
June 30,2010 or
Hourly rate for planning services reduced by
upon the issuance
20%
of 500 permits
(whichever comes
first
Coachella Valley Association of
Transportation Uniform Mitigation Fee
September 1,2008
2010 will see a
Fees were
Governments (DQ
(TUNE)
new nexus study
scheduled to
(SFU- $1,837.44)
for potential
increasetwice
increase
during this time
Period based on
ENR -CCI
CoachellaValley Multiple SpeciesHabitat
October2,2008
None — Subject to
Fees do upon
Conservation Plan (CVMSHCP) —Local
periodicreview
applicationfor
Development Mitigation Fee (FDMF)
Certificate of
(SFU - $1.284)
Occunancv
Coachella Valley Water District
Water System Backup Facility Charge;
December24,2007
12 months w/
Fees due at close cf
Negotiated
(DC)
Supplemental Water Charge; Sanitation
possible 12 month
Escrow or no later
signed
Charge
extension
than six months
agreement—
after installation
Board
Approval
Water System Backup Facility Charge
September 1,2008
July 1,2010
Will delay
NO
Extended May 2009
For evaluation
increasingvalid fee
$3,557 proposed $3,755
rates intil mid -2010
($198 difference)
Supplemental Water Charge
$9,530 proposed $17,027
($7,497 difference
Sanitation Capacity Charge
May 1,2009
July 1,2010
Will delay
NO
$3,995 proposed $4,231
For re-evaluation
increasingvalid fee
($235 difference)
rates until mid -
2010
Coachella Valley Unified School
School Impact Fees
June 24,2009
12 months or until
Fees due at
NO
District (DC)
next SFNA
Building Permit
Reduced from $3.78 to $3.00 due to legal
challenge
City of Desert Hot Springs (DC)
Development Impact & Public Art Fees —
April 20,2009
NIA
Outlined terms of
NIA
Tolling Agreement Proposed $11,000 increase
agreement reducing
w/o basic nexus support
proposed fee
$6.600
Desert Water Agency (DC)
Backup Facility Charges — Supplemental
September 20,2007
12 months w/
Fees due at Escrow
Negotiated
possible 12 month
signed
extension
agreement
City of La Quinta (DC)
D, l 3 I li t ti, of adopted /
)l 7, 2008
wl possible 12
Fees due at
NIA
supportable Development Impact Fee
month extension
Building Permit
:son construction
City of Palm Springs (DC)
Public Arts and Quimby Fees
February 4,2009
12 months w% At application for
possible 12 month Final
extension Inspection/Certific
ate
Not Stated
Planning Land Use, InspectionFees
February 4,2009
12 months w/ Delayed
N/A
possible 12 months implementation of
extension fee increase
San Bernardino
Total Deferral:
Pending
None Unon issue of
Single Family Detached (SFD) — $15,506.60I
Certificate of
Single Family Attached (SFA) — $10,997.20
occupancy
• Law enforcement facilities, vehicles and
equipment; SFD, $535; SFA, $474
• Fire suppression facilities, vehicles and
equipment; SFD, $663; SFA, $818
• Regional circulation system; SFD, $2,435;
SFA, $1,626
• Local circulation system; SFD, $195; SFA,
$130
• Quimby Act Parkland and open space
acquisition and park improvement; AB
1600parkland and open space acquisition
and park improvement; SFD, $6,688; SFA,
$5,293
• Library facility and collection; SFD, $534;
SFA, $423
• Public meeting facilities; SFD, $765.60;
SFA, $605.60
• Aquatics facilities; SFD, $273; SFA, $216
• Storm Drain Development; SFD, $3,418;
SFA, $1,411
Victorville
• Roads, $4,470.05
Six (6) months w/
Upon issue of
• Fire, $328.81
possible extension
Certificate of
• Police, $139.07
occupancy
• Parks, $5,054.87 — Temp. Adjustment, $0
• Facilities, $1,334.35 —Temp. Adjustment,
$0
DIF Fees dropped from $11,300 to $4,900
per unit
City of Visalia
All Development Impact Fee's deferred
1994
Ongoing
City of Porterville
All Development Impact Fee's deferred
March 2009
Ongoing
Farmersville
All Development Impact Fee's deferred
March 2009
Ongoing
Porterville Unified School
School Fees deferred
April 2009
One year
District
Burton School District
$choojFees deferred
Aril 2009
Ongoing
Visalia Unified School District
$ch991 Fw_s deferred
June 2009
June 2010
Tulare City School District
SchoolFees deferred
June 2009
June 2010
City of Ventura
Impact Fees—Determinedon a case by case
Approved
Six months w/
Upon issue of
basis
possible six month
Certificate of
extension
Occupancy
City of Santa Paula
Impact Fees
Approved
Upon issue of
Certificate of
Occupancy
City of Thousand Oaks
Temporary rollback of IZ in lieu fees to $0
Approved
:tune 30s', 2010
Savings:
:Detached single family dwelling 9,000
dwelling unit
'Townhouse condo 25,000 dwellingunit
City of Roseville
Total Deferral: $30,092.43
Approved
31-Dec-08
Close of Escrow
NO
1$258permit
Fees paid at Issuance of Building Permit
jprocessing fee
• Fire Service Construction 7ax,$1,107.30
• Public Facilities Fee, $2,821.50
• Regional SewerFee, $5,815
• Local SewerFee, $305
• Water Connection Fee, $4,675
• Traffic Mitigation Fee, $4,4 11.13
DevelopmentAgreement Fees
• Water meter retrofit program, $135
• Public Benefit Fee, $1,280
• General fund contribution, $1,060
• Traffic signal coordination fee, $100
• South Placer animal control shelter fee, $50
• Transit shuttle service tat., $52.50
Other Fees
• Electric direction installationfee, $2,000
• Solid waste impact fee $410
City of Lincoln
Fees deferred:
Approved
Permanent
Certificateof
NO
Occupancy or up to
Sewer
12 months
Water
following issuance
CAT
of building permit,
Drainage
which ever occurs
Community Services Fee
first.
Traffic Mitigation
Dollar amount depends on location in the city.
Could be as high as $41,521.
10
Issuance of a Final
NO
City of Elk Grove
• Capital Facilities Fee
Approved
The Ordinance
• Affordable Housing Fee
implementing the
Inspection; OR to
• Very Low -Income Housing Trust Fund Fee
program will
the close of escrow
• Citywide Roadway Fee
expire on June 30,
OR to the
2010
maximum allowed
deferralperiod (24
$18,595 for SF*
months)
$11,931 for MF*
*Total deferral may depend on proj ect or part
After this period,
of the city.
residential projects
may apply for an
extension (12
months at the
discretion of the
City Manager)
during which
interestwill accrue.
City of Elk Grove
Roadway and Capital Facilities Impact Fees:
Approved
Reduced by more than 30%
Single family home fee reduced 30%:$14,260
to $9,894 per unit
Fees for shopping center reduced 55%. $12.00
per sq ft to $7.51 per sq ft
Fees for offices reduced 42%: $14.23 per sq ft
to $6.31 per sq ft
City of Woodland
20% discount on impact fees
I Approved
I
Yuba County
• Countywide Capital Facilities Fee; Pending
June 30,2010
Final inspection.
NO
* Levee Impact Fee;
* PLSP/KASA Road Improvement Fee;
* PLSPNASA Park Improvement Fee;
* ELSP Road Improvement Fee;
* ELSP Park Improvement
10
11
• Olivehurst Fire Impact Fee; and
• Linda Fire Impact Fee.
City of San Jose
Park Fees 2007 Varies
Payment of hi -Lieu
fees may be
deferred under a
Warkland agreement
to final inspection
for the first
certificate of
occupancy
associated with the
use of a residential
unit(s)
City of San Ramon
Quimby Act park fees Approved
]Deferred until
lbuilding permit is
*HBANC and city staff are in active
pulled - Common
idiscussions regarding additional fee
4deferral actions
Quimby Act
practice is to
collect park fees at
final map approval
City of Brentwood
Water, wastewater, roadway, community
facilities, parks and trails and administration
development impact fees
Deferredto
COO/Final
Inspection
City of Concord
*HBANC and city staff are in active
discussions regarding developing fee
deferral proposal.
Tri Valley Transportation *HBANC and city staff are in active
Council
discussions regarding developing fee
deferral proposal.
City of Oakley
Repeal of a child care facility fee Approved
11
12
Mt. Diablo Unified School
School Facility Fees
Deferred to
-District
COO/Final
Inspection
.East Contra Costa Habitat
The HCP/T 1C( r provides that the HCP/N
Approved
3/14/2010
ConservationPlan / Natural
.Mitigation Fe are to 1 ally
'Community Conservation Plan
updated on March 1 of every E Fot 2009,
the Development Fees have gone down about
110/0..
Central Contra Costa Sanitary
Sewer connection fees deferred to close of
Approved
Close of Escrow
:District Beard
escrow
City of Fremont
liall
10%reduction in development impact fees
Approved
12/31/2010
City staff to
citywide
explore collection
of fees at final
Creation of a package of specific Central
inspection or
Business District (CBD) incentives including,
Certificate of
but not limited to, a reduction of Development
Impact Fees by 25%within the CBD area
occupancy
until December 31,2011. 75%of the fees
will be collected during this time.
City of Livermore
All development impact fees deferred until
Approved
Upon issue of
COO.
Certificate of
occupancy
Hayward Unified School
School fees
Ongoing
Upon issue of
District
Certificate of
occupancy
City ofDublin
Reduction to traffic impact fees anywhere
Approved
from 3 percent to 11 percent
Two year moratorium on public act fees for
residential and commercial development of 20
units or more.
City of Pleasanton
Deferral of impact fees
Approved (two years)
)
Deferred to
COO/COE (which
ever occurs first
12
13
14
deferrals)
City of Chula Vista
Deferral of development impact fees to
Approved
Upon Certificate of
Certificateof Occupancy for all development
occupancy
projects.
City of Carlsbad
Reduced Traffic Impact Fees by 25% ($12
July 1,2009
Ongoing
million saved).
Savings around $900 a house (10 ADT's/unit)
Summary ofNEW fees:
Residential
Outside CFD In CFD*
$265/ADT $224.20/ADT
Single Family (10 ADT's/unit)
$2,650/unit $2,242/unit
Multi -Family Condo (8 ADT's/unit)
$2,120/unit $1,793.60/unit
Apartment (6 ADT's/unit)
$1,590/unit $1,345.20/unit
Commercial/Industrial
Outside CFD In CFD
$106/ADT $89.68/ADT
Retail (40 ADT's/1,000)
$4.24/sq. ft. . $3.59/sq. ft.
Com. Shopping Ctr. (SO ADT's/1000)
$8.48/sq. fk $7.17/sq. ft.
Office (20 ADT's/1,000)
$2.12/sq. ft $1.79/sq. ft.
Industrial (8 ADT's/1,000)
$0.85/sq. ft. $0.72/sq. ft
* CFD —Community Facilities District
City of Encinitas
Deferral Approved (exception: drainage fees
Upon Certificate of
still collected at Final Map).
occupancy
City of Vista
Approved (Traffic Impact Fees Only --project
by project).
City of Oceanside
Development Impact Fees deferred
Preliminary
1 year or until final
Approval: September
city inspection
212009
14
15
from $3,674 to $3,791, respectively
City of Merced Impact fees reduced:
Commercialprojects – 25% reduction
Infill Projects –28% reduction
Retail commercial (per 1,000 feet of space)
Institutional —$6,910 now $5,182.50
Low turnover — $20,204 now $15,153
Retail (more than 50,000 square -feet) —
$15,246 now $11,434.50
Office/Commercial — $13,336 now $10,002
Industrial (light) —$3,812 now $2,859
Industrial (heavy) —$3,987 now $2,990.25
Infill residential
Single-family house — $10,404 now $7,491
City of Santa Clarita Quimby, Bridge & Thoroughfare, and Transit August 25, 2009 1 year Fees due at
Impact development fees deferred Building Permit for
one year
Indicates jurisdictions where fees have been reduced.
16
PROOF OF PUBLICATION
(2015.5 C.C.C.P.)
STATE OF CALIFORNIA
County of San Joaquin
I am a citizen of the United States and a resident
of the County aforesaid: I am over the age of
eighteen years and not a parry to or interested
in the above entitled matter. I am the principal
clerk of the printer of the Lodi News -Sentinel, a
newspaper of general circulation, printed and
published daily except Sundays and holidays, in
the City of Lodi, California, County of San Joaquin
and which newspaper had been adjudicated a
newspaper of general circulationby the Superior
Court, Department 3, of the County of San Joaquin,
State of California, under the date of May 26th,
1953• Case Number 65990; that the notice of which
the annexed is a printed copy (set in type not
smaller than non-pareil) has been published in
each regular and entire issue of said newspaper
and not in any supplement thereto on the following
dates to -wit:
November 14th,
all in the year 2009.
I certify (or declare) under the penalty of perjury
that the foregoing is true and correct.
aDadt�r2
di alifornia, this 1 th day of
be09.
Signature
3D_9D4(,o
This space is for the County Clerk's Filing Stamp
Resolution Approving Planning Division Hourly Rate
and SettingVarious Fire Code Related Fees
SUBJECT:
PUBLISH DATE:
Please immediately confirm receipt
cf this fax by calling 333-6702
CITY OF LODI
P.O. BOX 3006
LODI, CALIFORNIA 95241-1910
ADVERTISING INSTRUCTIONS
RESOLUTION APPROVING PLANNING DIVISION HOURLY RATE AND
SETTING VARIOUS FIRE CODE RELATED FEES
SATURDAY, NOVEMBER 14,2009
TEAR SHEETS WANTED: One (1) please
SEND AFFIDAVIT AND BILL TO:
DATED: FRIDAY, NOVEMBER6,2009
ORDERED BY: RANDI JOHL
CITY CLERK
J NIFER ROBI, CMC
A SISTANT CITY CLERK
RANDI JOHL, CITY CLERK
City of Lodi
P.O. Box 3006
Lodi, CA 95241-1910
MARIABECERRA
ADMINISTRATIVE CLERK
Faxed to the Sentinel at 369-1084 at ��� (time) on 1 (date) (pages)
LNS Phoned to confirm receipt of all pages at (time) F JMR (initials)
formAadvins.doc
RESOLUTION NO. 2009-157
A RESOLUTION OF THE LODI CITY COUNCIL
APPROVING THE PLANNING DIVISION HOURLY
RATE AND SETTING VARIOUS FIRE CODE
RELATED FEES
WHEREAS, the Lodi Municipal Code requires the City Council to set fees for various
services provided by the City of Lodi to recover the costs associated with providing specific
services and programs.
NOW, THEREFORE, BE IT RESOLVED that the City Council finds as follows:
That the Planning Division hourly rate of $132.00 per hour attached hereto as
Exhibit A, is approved; and
2. That the Fire Code related permit/inspection fees attached hereto as
Exhibit B, are approved; and
3. All resolutions or parts of resolutions in conflict herewith are repealed insofar
as such conflict may exist; and
4. This resolution shall be published one time in the "Lodi News-Sentinel,"a daily
newspaper of general circulation printed and published in the City of Lodi, and
shall be in force and take effect on December 4, 2009, which date is at least
thirty (30) days after the passage of this Resolution.
Dated: November 4, 2009
hereby certify that Resolution No. 2009-157 was passed and adopted by the City
Council of the City of Lodi in a regular meeting held November4, 2009, by the following vote:
AYES: COUNCIL MEMBERS— Hitchcock, Johnson, Katzakian, and
Mayor Hansen
NOES: COUNCIL MEMBERS— None
ABSENT: COUNCIL MEMBERS — Mounce
ABSTAIN: COUNCIL MEMBERS— None
L
City Clerk
2009-157
EXHIBIT A
Planning Division;,Hourly Rate
Direct hourly rate
$
78.90
Internal overhead hourly rate
$
15.90
External overhead hourly rate
$
19.87
Planning Division Hourly Rate
$
114.68
15% reserve
$
17.20
Total Rounded
$
132.00
Direct Cost
Planning Staff
142,228
Supplies/Materials
41,775
184,003
Billable hours
2332
:Direct hourly rate
Internal Overhead Cost
Planning Commision 1(80%)
3,400
Administrative Secretary (40%)
33,680
37,080
Billable hours
2332
Internal overhead hourly rate
15.90
External Overhead Cost
Allocated Costs 2009 Revision
46,344
Billable hours
2332
New Development and Tenant Improvements
Plans Review Fee
Site Planning
150+
Annexation
150+
Land Use
150+
Lot LineAdjustments
150+
Parcel Map
150+
SPARC
150+
Zoning Variance
150+
Subdivision/Lot Splits
225+
1-4 Lots
150
5 - 24 Lots
300
25 or more Lots
450
Fire & Life SafetyPlans Review and Inspections
Fire Review of Building Construction
Add 25% to building plan check & permit fee
Certificate of Occupancy (Fire) 7-5+--135+
Fire ProtecUon Equipment Plans Review and
Inspections
Civil ImprovementSite Plan (no underground
inspection) 4270+
Compressed Gas System (each)
Hazardous Materials 374+675+
Medical Gas 459+--810+
Fire Alarm System 44G-+--810+
Fire Alarm System for Fire SprinklerMonitor39A-+-540+
Fire Flow/Hydrant Test 450* 270+
Fire Pump 980+1620+
Fire Sprinkler (per riser)
1- 6 Heads 22;5 405
7 -19 Heads 35-675
20 - 99 Heads 7-591350
100 - 199 Heads 4,O60 1890
>= 200 Heads (plus 0.50 per head) 4-,M 2430
Halon/Clean Agent System 450$-810+
Hood & Duct Fire Suppression System*(each)388+-540+
*hood requires separate building permit
Plan Maintenance Fee*Add " 10%to plan check fee
*compressedgas systems, fire alarm system,
alarm system for sprinkler monitor, fire pump,
fire sprinkler system, halon/clean agent system,
hood & duct suppression system, spray booth,
standpipe/ hose stations
Smoke Management Systems 1350+
Spray Booth (each) 4810+
Standpipe/Hose Stations 458+-270+
M scellaneor s ewolopment Fee
Administrative Charge'
Design Review Consultation/Conference 75+
Minimum Intake Fee (not otherwise specified)75 135
Second and Subsequent Plan Revision
Submittals (each) 459-270
Temporary Certificate of Occupancy 150
Special Plan Review Request
After Hours 225+405+
Not Otherwise Specified 458$270+
Cancellation— < 24 hours notice, not ready,
no show 7-5-135
Technical Report/Alternate MaterialsorMethods*
*per code item plus consultantfee plus 20%
admin fee 448+-270+
Annual Fire and Life Safety Inspections
State Mandated Inspections
E-3 Occupancies—Day Care
7 -49 clients
150+
50 - 149 clients
187.50+
>= 150 clients
225+
Pre -inspection<= 25 clients
50
Pre -inspection> 25 clients
100
I Occupancies—institution
50
1-1 or 1-2 occupancies < 6 patients
150+
1-1 or 1-2 occupancies>= 6 patients
225+
13 occupancies (detention)
no charge
R- I Occupancies—Apartments/Hotels/Motels
3 - 16 units
112.50+
17 - 32 units
150+
>= 33 units
187.50+
R-2 Occupancies —ResidentialCare Facilities
>= 7 residents
225+
Pre -inspection< 25 residents
50
Pre -inspection >= 26 residents
100
R-3 Occupancies—Large Family Day Care
OtherActivities Not Listed 76-�-135+
7 -14 clients
75+
Pre -inspection
50
R-6 Occupancies—Halfway Houses, etc.
>= 7 residents
225+
Pre -inspection < 25 residents
50
Pre -inspection>= 26 residents
100
Business Fm & Life Safety Inspections
Fourth False Alarm
Fire Company Business Inspection
Fifth and Subsequent (each)
Initial plus 1 re -inspect no charge
Additional re-inspections(each) 75+
Miscellaneous Charges Fee
Administrative Charge
Appeals (Fire Chief denies application)
250
Environmental Impact Report DocumentSearch
75+
OtherActivities Not Listed 76-�-135+
Refund Processing 3746-M7.50
Weed Abatement (per parcel)
150+
Emergency Response (per company)
Hazardous Materials
131+
False Alarms—2 or fewer per calendar year
no charge
Third False Alarm
75
Fourth False Alarm
150
Fifth and Subsequent (each)
393
Contact not at scene in 60 minutes
131
Failureto notify LFD of test
131
Fire Investigations (per person)
75+
Fire Reports and Other Documents (per page) 0.25
Investigation—No Construction Permit
75+
Occupancy Load Calculation
75+
Photograph Reproduction (per print)
Actual cost plus 20% admin fee
Standby (per person)
75+
Standard Hourly Rate
LFD Personnel
75
Engine or Truck Company
131
+ Minimum Fee, actual cost mayvary
Fees based on $75 $135 per hour (in quarter-hour
increments)
EXHIBIT B
SUBJECT:
PUBLISH DATE:
Please immediately confirm receipt
of this fax by calling 333-6702
CITY OF LODI
P. O. BOX 3006
LODI, CALIFORNIA 95241-1910
P
ADVERTISING INSTRUCTIONS
PUBLIC HEARING TO CONSIDER UPDATED PLANNING DIVISION'S
HOURLY RATE AND SETTING VARIOUS FIRE INSPECTION FEES
SATURDAY, OCTOBER 24,2009
TEAR SHEETS WANTED: One (1) please
SEND AFFIDAVIT AND BILL TO: RANDI JOHL, CITY CLERK
City of Lodi
P.O. Box 3006
Lodi, CA 95241-1910
DATED: THURSDAY, OCTOBER 22,2009
ORDERED BY: RAND[ JOHL
CITY CLERK
t JENNIFER M. ROBISON, CMC
ASSISTANT CITY CLERK
MARIA BECERRA
ADMINISTRATIVE CLERK
Faxed to the Sentinel at 369-1084 at iU = /fir<fi (time) on 10/a9/0�1 (date) (pages)
LNS Phonedto confirm receiptof all pages at (time) MR CF MB (initials)
formAadvins.doc
DECLARATION OF POSTING
PUBLIC HEARING TO CONSIDER UPDATED PLANNING DIVISION'S HOURLY
RATE AND SETTING VARIOUS FIRE INSPECTION FEES
On Friday, October 23, 2009, in the City of Lodi, San Joaquin County, California, a
Notice of Public Hearing to consider updated Planning Division's hourly rate and setting
various Fire Inspection fees (attached and marked as Exhibit A). was posted at the
following locations:
Lodi Public Library
Lodi City Clerk's Office
Lodi City Hall Lobby
Lodi Carnegie Forum
I declare under penalty of perjury that the foregoing is true and correct.
Executed on October 23, 2009, at Lodi, California.
Ll JENNIFER M. ROBISON, CMC
ASSISTANT CITY CLERK
N:\Administration\CLERK\Forms\DECPOS'I'CDD. DOC
ORDERED BY:
RANDIJOHL
CITY CLERK
MARIA BECERRA
ADMINISTRATIVE CLERK
•. CITY OF LODI
`., Carnegie Forum
305 West Pine Street, Lodi
NOTICE OF PUBLIC HEARING
Date: November4,2009
Time: 7:00 p.m.
For information regarding this notice please contact:
Randi Johl
City Clerk
Telephone: (209) 333-6702
NOTICE OF PUBLIC HEARING
NOTICE S HEREBY GIVEN that on Wednesday, November 4, 2009, at the hour of
7:00 p.m., or as soon thereafter as the matter may be heard, the City Council will
conduct a public hearing at the Carnegie Forum, 305 West Pine Street, Lodi, to consider
the following item:
a) Updated Planning Division's hourly rate and setting various Fire
Inspection fees.
Information regarding this item may be obtained in the Community Development
Department, 221 West Pine Street, Lodi, (209) 333-6711. All interested persons are
invited to present their views and comments on this matter. Written statements may be
filed with the City Clerk, City Hall, 221 West Pine Street, 2nd Floor, Lodi, 95240, at any
time prior to the hearing scheduled herein, and oral statements may be made at said
hearing.
If you challenge the subject matter in court, you may be limited to raising only those
issues you or someone else raised at the public hearing described in this notice or in
written correspondence delivered to the City Clerk, 221 West Pine Street, at or prior to
the close of the public hearing.
, By�er of the Lodi City Council:
Ra ohl
City Clerk