HomeMy WebLinkAboutAgenda Report - August 19, 1992 (80)`j CITY OF LODI
COUNCIL COMMUNICATION
AGENDA TITLE: Contract Change Orders, White Slough Water PollutioniControl Facility
Capacity Expansion Improvements, 12751 North Thornton Road
MEETING DATE: August 19, 1992
PREPARED BY: Public Works Director
S item is for information only. No action Ps
BACKGROUND INFORMATION: This information is being given to the Cit Council
in accordance with the contract change ord r policy
approved by Resolution 85-72. One of the euirements of
this policy is that we inform the City Ci
ou c of all
change orders in excess of an aggregate of 525,000. Attached Cont ct Change Orders
k8 and N9, approved by the City Manager, have a net decrease to th contract of
$925. The total cost of all change orders for this project is 4458',878, or 4.74% of
the contract.
Contract Change Order M8, in the amount of 519,902, covers additional cementitious
coating, air piping, minor modifications due to unforeseen pipe an electrical
conditions, repair to Digesters M1 and M2 lids, and additional conrete for patio,
steps and roadway. This change order also deleted an instrument palnel for the air
compressor package, an influent bubbler panel, digester gas piping Iswivel joints, an
asphalt redwood header, and torque and shear pin limit switches.
Contract Change Order N9, the last change order for this project, s in the amount
of ($20,827). This change order added minor electrical, mechanics and piping
revisions, ceiling support work and additional asphalt pavement wo k. It also
deleted asphalt slurry seal and single -ply roofing and credit 142 ays of liquidated
damages ($250 per day).
The original contract price for the expansion project was S9,681,2 B. The contract
price, including change orders, is $10,140,096.
FUNDING: A special allocation was processed at the end of the fisdai year to cover
the overruns and anticipated change orders for the comp) tion of this
project. J '
Jack L. Ronsko
Public Works Director
Prepared by Sharon Blaufus, Administrative Assistant
Attachments
cc: City Attorney
Finance Department
_ /
APPROVEfS-_1_ ! 1...—�.
THOMAS A PETERSON
City Mnnngw
CWSWPC30/TXTW.02M (CO.COM)
1 CITY OF LODI
PUBLIC WORKS DEPARTME?
PROJECT: White Slough Water Pollution Centro! Facilities
Capacity Expansion Improvements
CONTRACTOR: Nder Engineering and Construction Co.
3939 South 500 West
Salt Lake City. UT 94123
CC' T1 T CHANGE ORDER N0.8
Sheet I of
February 17. 1992
Account No. 17? - 410.611
You are directed to make the following changes cc do the following work not included in the Plans and
Specifications on this contract.
Description ofwork to be done, estimate of quantities. and prices to be paid. Specifywhether additional work
is at contract price, agreed price, or force account Unless otbcr, i, e stated, rates for rental of equipment
cover only such time as equipment is actually used and no allowance will he made for idle time.
The major items of this 519,902 change order include: additional ccmentitious coating; air piping: minor
modifications due to unforeseen piping. electrical conditions: floating Digester coven No. I and 2 repair:
additional concrete for patio. steps, and roadway swale. The lollowing itemswere deleted for a credit to the
contract: instrument panel at AC -Sl; infl. bubbler panel: digested gas swivel joinu, torque and shear pin limit
switches for the headworks cx equipment; asphalt redwood header.
Original Contract Price
Total Cost of This Change Order NOT TO EXCEED
Previous Change Orders
Total Cost cf All Change Ordcrs to Datc
Contract Price, Including All Change Orders, will be:
510,160.923
Time of completion will he adjusted as follows: Contract Final Completion, 1118191.
Submitted By t ' _ Date r 1
Approval Reconunended Date rt
Approved, Ptxblic Works eor Date 8 3 - 4'L
Approved, City Manager if 1 T or 1 each CCO
or 525,000 total CCOs . t`4441A Date. 0, 419 t
The undersigned contractor, having 6re?u�}y8asidered the change proposed, agrees, if this proposal is approved,
to provide all equipment, furn-ish all materials. except as otherwise noted above, 1: Fi- n all services necessary for
the work above specified. and accept as full payment the prices shown above.
ACCEP'T'ED: Date 2 10AZ Contractor ADE?- F -W11 kl
By _L2JQL6 _ Title �.
r
If the Contractor does not sign ac4tancc of this order, the Contractor should refer to t:ie General Conditions
regarding tiling a wtittcn protest within the spc;cificd time.
Mimi
Percent of
Contract
$9,681.218
S 19,902
0.2M
S 459,803
$ 479.705
4.96%
510,160.923
Time of completion will he adjusted as follows: Contract Final Completion, 1118191.
Submitted By t ' _ Date r 1
Approval Reconunended Date rt
Approved, Ptxblic Works eor Date 8 3 - 4'L
Approved, City Manager if 1 T or 1 each CCO
or 525,000 total CCOs . t`4441A Date. 0, 419 t
The undersigned contractor, having 6re?u�}y8asidered the change proposed, agrees, if this proposal is approved,
to provide all equipment, furn-ish all materials. except as otherwise noted above, 1: Fi- n all services necessary for
the work above specified. and accept as full payment the prices shown above.
ACCEP'T'ED: Date 2 10AZ Contractor ADE?- F -W11 kl
By _L2JQL6 _ Title �.
r
If the Contractor does not sign ac4tancc of this order, the Contractor should refer to t:ie General Conditions
regarding tiling a wtittcn protest within the spc;cificd time.
Mimi
Page 2 at 7
3bV r:�aiec» 161,90,00
.3&V ..ie 1.519.4
Fabrua r'1 14 , ; 9142
C SI,NC E 0= NO. 8
SOMiARY
Cc?nCr3CC C:;3'[lk'8
Descci?tion
707AL $ 19,902
Add JDeduL:
1,
FD No.
15
Concrete Finish at °SFR
5i,944
2.
FD No.
19
3utbler Panel TL Supply
160
3.
r"£? No.
20
Grit Pump Pipe Modification
250
4.
FD No.
26
Chlorine Injector Pipe Re J,
345
5.
FD No.
27
Roof Drain Leader Reroute
738
6.
FD No.
28A
Modification to Existing
Doors (107, 108, 109)
37?
7.
FD No.
30
Digestsr No. 2 Lid Repair
539
8.
FD No.
31
TSP -F,
1,450
9.
FD No.
34
Control Room Telephone
49`
10,
FD NO.
41
Digester No. 1 Cover Repair
2.254
11.
PD No.
42
Wood Baffle at Effl. Box 1
242
12.
FD No.
43
Digester Cover No. 1 and 2
2.457
Paint Roof Accessories
13.
FD No.
45
Piping for Pressure Svitches
lie
at ,k,4-81
14.
FD No.
47
Air Piping at the Hydro Tank
159
15.
FD No.
48
Chlorine Basin Stairs
611
16.
FD No.
49
Control Building ?azio
981
17.
FD No.
51
Relocate FIT -A3
212
19,
FD No.
52
AHU Filters
(71)
19.
FD No.
53
Digestar Cover No. i Repair
3.145
20.
FD No.
54
Digester Cover No. 1 Repair
8.517
21.
CRE -1
Air Compressor (AC -Cl) Panel
(903)
22.
CRE -2
Digesrer Sludge Grinder
325
Electrical
23.
CRE -5
Boiler SySCem Electrical
1.421
24.
CRE -4
TQ?mporay Electrical Facilities
1,971
For the Headworks
25.
CRE -5
Modification to Concrete Swale
702
26.
CRE -6
Sludge Lagoon Pumper Hose
(432)
27.
RFP No.
22
Pond 3ypass
(1.000)
28.
RFP No.
36
Influent Bubbler Panel
29.
RFP No.
49
Digester Cas Piping Swivel
(2.763)
Joints
30.
RFP N0.
50
Delete Asphalt Redvood Header
(2,458)
31.
RFP No.
54
Delete Torque and Shear Pin
(1,189)
Limit Switches
707AL $ 19,902
CITY Or LODI
PUBLIC WORKS DEPARTMENT
CONTRACT �.oANCE ORDER NO. 9
Sheet t of Z
Date est 47�
Account No. �4 -- �-bT—
PROJECT= White Slough Water Pollution Control Facilities
Caoacity Expansion Improvements
CONTRACTOR: Alder Engineering and Construction Co.
3939 South 500 West
Salt Lake City, UT 84123
You are directed to make the following changes or do the following work not included
in the Plans and Specifications on this contract.
....................................................................................
Description of work to be done. estimate of quantities, and prices to be
paid. Specify whether additional work is at contract price, agreed
price, or force account. Unless otherwise stated, rates for rental of
equipment cover only such time as equipment is actually used and no
allowance will be made for idle time.
The main items of extra work for Change Order No. 9 (520.827.00) include the
following: Minor mechanical and Piing revisions; Ceiling support work;
Minor electrical modification; Additional asphalt pavement work.
The following were deletions or credits: Liquidated damages (142 days);
Asphalt slurry seal; and Single ply roofing.
Percent of
...Contract_.
Original Contract Price $ 9,6812418
Total Cost of This Change Order NOT TO EXCEED $ 20.27 _ -0-g2
Previous Change Orders 479 705
Total Cost of All Change Orders to Date S 458,878 4.74 k
Contract Price, Including A11 Change Orders, will be: $10,140,096
Subs
Appr
Appr
CCE}s
The undersigned Cort ftdt ;aIMing carefully considered the change proposed, agrees,
if this proposal is approved, to provide all equipment, furaish all materials,
except as otherwise noted above, perform all services necessary for the work above
specified, and accept as full payment the prices shown abcve.
ACCEPTED: Date (P "rlt- f X32
sy kcS`v
If the Contractor)does not sign ac
refer to the General Conditions re -
specified timF.
M1 ii
Contractor Am weikup J6 � c0[)c.;�. L0.
Title INDW U R
Stance of this order, the Contractor should
,-ding filing a written protest within the
Page 2 of 2
BA's Project 16390.400
EEV File 1.5. 9.4
August 5, 1992
CHANGE ORDER NO. 9
SUMMARY
It3n Description Contract Change Time
Add/Deduct (days)
I.
FD
36
Drip Traps, Digester Gas
724.00
Piping
2.
FO
44A
Headworks Steel Beam
Supports
3,000.00
3.
FD
46
Asphalt Extra Work
3,000.00
4.
FD
56
Liquidated Damages
($35.500.00)
5.
FO
57
Rm 108 Electrical Conduit
1.372.00
Relocation
6.
FO
5B
Accoustical Ceiling Extra
382.00
Work
7.
FD
59
Hydraulic Power Unit
2,792.010
Extra Work
8.
FO
60
Re -key Door Locks
494.40
9.
FD
61
Add Solenoid Valves at the
1,295.00
Sample Pump
10.
FD
62
Misc. Extra Mechanical Wak
2,131.00
11.
FD
63
Single Ply Roof System
(2,500.00)
12.
FD
64
Asphalt Slurry Seal
(5,500.00)
13.
FD
65
Asphalt Pavement Extra Work
70272.00
14.
FD
66
Digester Ab. 1 Repair
211.00
15.
FD
67
Digester Ab. 1 Repair. Time
Extension
CHANGE ORDER N0. 9 TOTAL
( $20,827.i1O)
Refer
to B&V
Construction Memo dated August a, 1992 for the backup data.
30
32 days