HomeMy WebLinkAboutAgenda Report - August 19, 1992 (82)OCIN OF LODI •� J �r�'�� 1 1 J t� �` AGENDA TITLE: Contract Change Order - Lodi Lake Picnic Facilities MEETING DATE: August 19. 1992 PREPARED BY: Public Works Director RECOMMENDED ACTION: This item i s for information only. Nc action is required. BACKGROUND INFORMATION: This information is being given to the City Council in accordance with the contract change order policy approved by Resolution 85-72. One of the requirements of this policy i s that vie inform the City Council of a I I change orders over the larger of $5,000 or 10" of the contract amount. This attached contract change order, approved by the City Manager, was i n the amount of $20,110 which i s 20.671 of the contract. The major items of work in this change order are: 1) Installing lights in the Hughes Beach and South Point picnic structures 2) Increasing the parking lot size in the Hughes Beach area 3) Installing electrical conduit for future lighting in the youth group area The City has a State grant of $140,000 tO help pay for the design End construction of the picnic facilities at Lodi Lake. $20,000 wac alsc appropriated from the General Fund to meet the original project estimate of 5160.000. Tvw conditions of the grant were that the City use its 520,000 first and any money remaining in the account at the completion of the project must be returned to the State. Richard Bigler and Associates. the architect for this project. revised his construc- tion estimate to $190,000 just prior to putting the plans and specifications out to bid. Bid items were deleted to keep the project within budget and K Marc Lee. Inc. was the low bidder at $97.500. The additional work shown in the change order w i I I reduce the amount of money that must be returned. The project officer from the State Parks and Recreation Department has reviewed and approved the changes in the scope of work. APPROVED,_- I!�Vl� THOAAAS A. PETERSON Cc' r CLOOILAK. 2/TXTW .02M (C0. COM) August 6, 1997 Contract Change Order - Lodi Lake Picnir Facilities August 19, 1992 Page 2 FUNDING: Originally Budgeted: Budgeted Fund: Contract Amount: Prepared by Uesley K. Fujitani JLR/4/lm Attachment 5160.000 Per Capita Grant Program and General Fund b117.610 Jack, L. Ronsko Public Works Director r Senior Civil Engineer cc: City Attorney Parks and Recreation Director Community Development Block Grant Coordinator CLODILAK.2/TXTW.02M (CO.COM) August 6, 1992 CITY OF LODI PUBLIC WORKS DEPARTMENT CONTRACT CHANGE OPUR NO. 1 Sheet 1 of 2 Date July 29. 1992 Account No. .3-r .1 PROJECT: Lodi Lake Picnic Facilities CONTRACTOR: H. Max Lee. 1 nc . You are directed to make the following changes or do the following work not included in the Plans and Specifications on this contract. ............................................ Description of work to be done. estimate of quantities, and prices to be paid. Specify whether additional work is at contract price, agreed price. or force account. Unless otherwise stated, rates for rental of equipment cover only such time as equipment is actually used and no allowance w i I I be made for idle time. 1. Do the following work for the agreed upon price of a) Delete 1" electrical conduit as shown on the plans and install conduit as shnwn on the revised Electric Utility Department plan the Youth Group Area b Install City -furnished luminaire in Youth Group Area C Furnish 100 amp load center at sink d) Install 1" PVC conduits for future lighting in Youth Group Area 2. Remove exfsting flagpole in Youth Group Area (Continued on Page 2) Original Contract Price Total Cost of This Change Order NOT TO EXCEED Previous Change Orders Total Cost of A I I Change Orders to Date Contract Price, including a I I Change Orders, w i l l be: S 7,080 Add $5.010 Add 1.610 Add 115 Add 345 Price not to e_cceed 960 S 97.500 iTtT— S PERCENT OF OON RAC: f 20.6 20.6 Time of completion w i I I be adjusted as follows: Add 12 working days Submitted byAV [ Date 79Z Approval Recommended, Date Appro ,Publ r s irector '�'- E - `�� Date G-7 - r z App J it' Ka j..i#--a�cer larger of or each or 525, t to CCOs tG[ �f hotnas A. Peterson Date 9 It 92- 1Y Z1y Manager The undersigned contractor. having carefully considered the change proposed, agrees, if this proposal is approved, to provide all equipment. furnish all materials. except as otherwise noted above, perform all services necessary for the work above specified, and accept as full payment the prices shown above. ACCEPTED: Date Contractor BY Ti tIe__ _ 11Fthe Contractor does not s)cn acceptance of this order. the Contractor should refer to Section 4-1.03A of the Standard Specifications regarding filing a written protest within the specified tiEne. CITY OF LODI PUBLIC WORKS DEPARTMENT CONTRACT CHANGE ORDER NO. 1 Sheet 2 of 2 DateJu 29,T§92 Account No. PROJECT: Lodi Lake Picnic Facilities CONTRACTOR_ -H_ !ax Lee, - Inc - - - - - - - - - - - - - - - - - - - - - - - - - - - - 3. Install lights in South Point Area as shown on Electric Utility drawing ",greed upon price 5 2,445 4. Install lights i n Hughes Beach Area as shown on Electric Utility drawing Agreed upon price 2.650 5. Grade and pave 1,204 SF for parking lot at Hughes Beach Agreed upon price 3,740 6. Water seal shingles on picnic structures at Hughes Beach and South Point Agreed upon price 575 7. Install header board around decomposed granite path Agreed upon price 2,660 TOTAL 520,110 WF/ lm cc: Community Development Block Grant Coordinator Parks and Recreation Director CCOLDILK/TXTW.02M