HomeMy WebLinkAboutAgenda Report - June 20, 1991 (84),t.OF
CITY OF LODI
c4<tFOR��t
f 'A
COUNCIL COMMUNICATION
AGENDA TITLE: Service Authority for Freeway Emergencies (SAFE) Program
N11L°M DATE: June 20, 1991
PREFARED BY: City Manager
RECOMMENDED ACTIOK: That the City Council
approving the City of
Service Authority for
Program.
adopt Resolution No. 91-109
Lodi `s participation in the
Freeway Emergencies (SAFE)
BACKGROUND IlFRMAIM- The Sacramento Area Council of Governments (SACOG) has
requested that the County of San Joaquin join forces
with six other counties in implementing a regional
Service Authority Freeway Emergencies program. The
other counties are Sacramento, Sutter, Yolo, Yuba, Placer and El Dorado. The
City Council reviewed this topic at its "Shirtsleeve" session of April 16,
1991. At that time Councilmember Penni no requested more detailed information
on the various cost components of this program. That information has
previously been distributed to the City Council and is also included herein
(Exhibit A).
The SAFE program provides for the installation of call boxes on interstate
highways and state routes within designated areas. A number of counties in
California have the program already in place with boxes installed. Funding i s
provided through a $1 increase in vehicle registration fees in the area where
the service is provided. The call boxes can be used to report accidents or
other road emergencies that may create safety hazards. The boxes provide for
two-way communication between the caller and the California Highway Patrol.
The appropriate resolution is also attached (Exhibit B).
FUNDING: No City funding required. Vehicle registration fees would be increased
$1 per year.
Respectfully submitted,
0.
GL�-
Thomas A. Peterson
C i t Manager
TAP: b r
Attachments
CCCOM221JTXTA.07A
APPROVED:
THOMAS A. PETERSON
Sa,, Joaquin County Council .,,-'Governments
Metnher Agencies: Citic, of F.scaion. Latl.mp. Uxli. Manteca. Ri)om. Stockton. Tracy. Ciretiv g1'.&iu_hwic1uin
May 15,1991
Mr. Thomas Peterson
Lodi City Manager
City of Lodi
Call Box 3006
Lodi, CA 95241
Dear Mr. Peterson:
�'�II1C A
The Sacramento Area Council of Governments (SACOG) has asked San Joaquin County to
join forces with six other counties in implementinga regional Service Authority for Freeway
Emergencies (SAFE). This proposal was introduced to the Lodi City Council during their
informal shirt -sleeve session on April 16,199 1. At that time, Councilmember Pennino
requested more detailed information on the various cost components of the regional SAFE
program.
Attached, foryou review, is a summary of the various SAFE cost components and an expla-
nation of how the consultant derived the cost figures.
Itis important to understand the feasibility study isjust that, a feasibility study. Although
the study does make adjustments for inflation, other factors may affect the cost figures,
The cost for call boxes, for instance, has varied considerably from one region of the State to
another, and has also varied with the size of the order. Insurance costs are also changingas
the program gains history as an insurance item.
Once the regio,ial SAFE is established the SAFE Board, composed of elected officials from
all participating counties, will make policy decisions impacting the cash flow of the pro-
gram. These decisions will include financing considerations as well as decisions related to
the $1 DMV fee collection, i.e., when to begin collection and for how long.
One conclusive finding of the study is that of the seven counties studied (Sacramento, Sut-
ter, Yolo, Yuba, Placer, SanJoacluin and E1 Dorado) only Sacramentowould be able to
generate enough revenue to operate a single county call box program. None of the others
could generate enough money to operate a cou ntywide SAFE at the scope suggested by
established SAFE system guidelines.
I would be happy to discuss this proposal further or answer other questions you may have.
Very truly yours, .
NANCY MILLER
Associate Planner
Attachment
Regional Tram o+rlalion Planning Agency. )areal Translorrtation Authority. Congestion Ainnagement Agency. Airport taend tNe Commiccion
190) E. ih/dIon Avenuc • Stnrkh,n. C;11i{i,rnia (2119) .168-3913 • FAX: (209) .168.11'1)
COST COMPONENTS OF THE REGIONAL SAFE SYSTEM
CAPITAL COSTS
Capital costs include call box equipment and site preparation and
installation. The par unit capital cost has been as high as $4,600
in orange County (includes site preparation, installation and
maintenance costs) and as low as $2,300 in Ventura (includes only
the call box equipment). San Bernadino and Riverside SAFGs recently
joined efforts to cut per unit costs and due in part to the large
volume order (nearly 1,900 boxes) they negotiated a $2,700 per unit
cost (includes site preparation and installation). SACOG's regional
SAFE feasibility study is based on $2,900 per unit cost ($2,300 for
equipment and $600 for site preparation and installation),
ONGOING COSTS $1,419,340 (at full. build -out
FY 1998)
TAlenhone: Tina anr] Arracc $229,290 (at full build -out
FY 1998)
These costs include Network Access Fees, Per -Minute Call Chaz: es,
Toll Charges and Line Service .
Cellular service providers charge both a network access fee and a
per -minute fee to use their cell site network. The consultants
preparing the feasibility study have had success negotiating network
access fees ranging from $7 - $12 per month for cellular service to
a call box. They have also had success negotiating per -minute fees
as low as 10 cents per minute, after 35 - 65 minutes of free time,
per month, per box. Costs for network access fees in this study are
estimated at $10.50 per month, per box. The per -minute fee estimate
for this study is based on 65 free minutes per box. These two
costs, access fee and per -minute charge, are combined and spread
over a 10 year period, with less cost in early years because of
fewer phones being operational.
Calls placed from a call box travel over the airways to a cell site.
Once at a cell site, the call is relayed either by hard -wire or
microwave to a local Mobile Telephone Service Office (MTSO). At
this point, the call enters the conventional hard -wire phone company
network and is routed to the appropriate CHP dispatch center.
Depending on the location of the MTSO, the call box, and the CHP
dispatch center, toll (long-distance) charges may be incurred. The
feasibility study uses an estimate of $12,000 per year for toll
charges and inflates costs 4% per year.
Each CHP dispatch center Will have dedicated phone lines to handle
SAFE calls. Each line costs approximately .$100 per month. The
feasibility study projects a need for s lines to cover the seven
county SAFE region. (A 4% annual increase is used to adjust costs
over time.)
$408,42t1 (at full build -out
FY 1998)
These costs include System Maintenance and Xnoakdowns/vandalism.
System maintenance includes both preventative maintenance (every 6
months) and corrective maintenance (as needed). This cost can be
contracted over a 10 year period, and identified as a fixed budget
item. Historical records show that system maintenance is approxi-
mately $120 per year, per box, with annual (50) increases to adjust
for inflation.
The cost for knockdowns and vandalism are estimated by drawing on
the experience of SAFES in San Diego and Orange Counties. Both
areas have experienced a 6% knockdown rate. In cases where accident
reports are filed and the responsible party identified, repair or
replacement costs may be recovered. This study uses an estimate of
6% knockdowns each year, at a cost of $1,500 each, with a 30%
insurance recovery rate.
Vandalism is also estimated at 6% per year, with a cost of $600 per
occurrence. Vandalism includes: bullet holes, spray painting,
handset bashing, solar panel thefts, attempted break-ins to the
inner box and outright thefts of the entire call box terminal. The
system is alarmed to notify the CHP when vandalism occurs, but in
order to catch the vandal, immediate priority must be given to the
call box alarm. To the extent that vandals are caught, cost may be
recovered. Estimated costs for vandalism and knockdowns are
increased 4% annually to account for inflation.
General, Administrative and Insurance
$220,000 (at full build -out,
FY 1998)
Implementation of the SAFE will require one full time staff position
as well as assistance from an outside consultant firm. The consul-
tant firm can provide assistance with the RFP, vendor selection,
contract negotiations, system installation and post implementation
system management.
Insurance is also needed to protect the SAFE from possible legal
action. Because of the newness of the SAFE systems as an insurance
item, insurance rates were very high in 1988 and 1989. Lower rates
are expected by the time the SACOG regional SAFE is implemented.
The feasibility study estimates rates at $63,000 per 1,000 call
boxes, per year, for a policy in the range from $5 million to $10
million.
-2-
—4—
CHP: Ecxuioment and Staff
$561,630 (at full build -out
FY 2.998)
Legislation requires that SAFES reimburse the CHP for their expenses
related to SAFE programs. These expenses include staff, equipment,
and dedicated phone lines. The cost of dedicated phone lines were
discussed above and are included as a phone charge.
In accordance with SAFE legislation, .the CHP must be reimbursed for
equipment purchased to provide service to the call boxes. The CHP
is purchasing Automatic Call Distributors (ACDs) and Telephone
Management Information Systems (TMIS) and eventually Computer
Assisted Dispatch (CAD) equipment, The CHP recognizes that this
equipment will benefit all of their call answering functions inclu-
ding SAFE calls, and accordingly the equipment costs are shared.
CHP has estimated the SAFE's share to be approximately $1,000 per
month per dispatch center. The feasibility study uses 4 CHP dis-
patch centers for the 7 county regional SAFE program.
The current cost of a dispatch operator, including benefits, super-
vision, etc., is $44,103 per year. The SACOG feasibility study
estimates that 10 dispatch operators would be needed for the 7
county SAFE.
Debt Service
The feasibility study reviews various types of financing mechanisms
but for purposes of the cost flow analysis, conventional bank or
third party short term note financing is assumed. The loan analysis
is based on 8% interest rate for borrowed funds and the loan is
amortized over 10 years.
Bar charts (next page) illustrate the income and expenses of the
seven county regional SAFE program. The charts axe based on the
assumption that:
+ All seven counties participate in the SAFE.
• Call boxes are installed along all eligible highways
at standard spacing.
+ Call boxes are purchased on a pay-as-you-go basis.
This will result in the installation of 1,690 call box units over a
60 month period. In this scenario, revenue collection begins in
fiscal year 1992 and call box installation begins in fiscal year
1993 and should be complete by the end of fiscal year 1997.
-3-
RESOLUTION NO. 91-109
A RESOLLTEON OF THE LODI CITY ODLNCII.
AFFROVM IN CONCEPT THE THE SERVICE AUIHORRY
FOR FREEWAY EMRZCENUES (SAFE) PROGRAM
VAS the Sacramento Area Council of Governments - ? i Tequested
that the County of San Joaquin join forces with six other counties in
implementing a regional Service Authority For Freeway Emergencies
(SAFE) Program, as described in Exhibit A attached hereto, and which
program provides for. the installation of call boxes on interstate
highways and State routes within designated areas;
NOW, THEREFORE, BE IT RESOLVED, that the Lodi City Council hereby
approves in concept the Service Authority For Freeway Emergencies
(SAFE) Program; and
BE IT FURTHER RESOLVED, Council hereby directs staff to monitor
the proposed SAFE Program and report back to Council at a future
Council meeting.
Dated: June 20, 1991
---------------------
I hereby certify that Resolution No. 91-109 was passed and
adopted by the Lodi City Council in an adjourned regular meeting held
June 20, 1991 by the following vote:
Ayes : Council Menibeis - Pennino, Pinkerton and Hinchman
Noes : Council Members - Sieglock
Absent: Council Members - Snider
91-109
RES91109/TXTA.02J
-1'�7.c"
Alice M. Reimche
City Clerk
CITY COI.NCJL
DAVID I'A HINCHNIAN. Mayor
JAMES W PINKERTON, Jr
Mayor Pro Tempore
PHILLIP A. PENNINO
JACK A SIECLOCK
JOHN R. (Randy) SNIDER
CITY OF LODI
CITY HALL, 22? WEST PINE STREET
P.O. BOX 3006
LODI, CALIFORNIA 95241-1910
(209)334-5634
FAX(209) 333-6795
June 25, 1991
Doug Reed
Sacramento Area Council of Governments (SACOG)
3000 "S" Street
Suite 300
Sacramento, CA 95818
Dear 14 Reed:
THOMAS A PETERSON
Citv Manager
ALICE M KEIMCHE
City Clerk
ROB McNATT
Citv Attorney
The todi City Council in action taken at its June 20, 1991 adjourned
regular meeting adopted Resolution No. 91-109 approving in concept the
Freeway Emergencies (SAFE) program. Staff was asked to monitor this
proposed program and report back to the City Council as to its findings.
Enclosed please find a certified copy of Resolution No. 91-109.
Should you have any questions regarding this matter, please do not
hesitate to call this office.
Very truly yours,
Alice M. Relmche
City Clerk
AMR/jmp
Enclosures
CITY COUNCIL
DAVIDK4 HINCHMAN. Mavor
JAMES W PINKERTON, 1,
M a y o r Pro Tempore
PHILLIP A PENNINO
JACK A. SIECLOCK
JOHN R (Randy) SNIDER
CITY OF LODI
CITY HALL. 221 WEST PINE STREET
P.O. BOX 3006
LOBI. CALIFORNIA 95241-1910
(209)333-5634
FAX (209) 333-6795
June 25, 1991
Nancy Miller
Associate Planner
San Joaquin County Council of Governments (COG)
1860 East Hazelton Avenue
Stockton, CA 95205
Dear Nancy :
THOMAS A PETERSON
City Manager
ALICE M REINICHE
CGty Clerk
BOB McINATT
City Attorney
The Lodi City Council in action taken at its June 20, 1991 adjourned
regular meeting adopted Resolution No. 91-109 approving in concept the
Freeway Emergencies (SAFE) program. Staff was asked to monitor this
proposed program and report back to the City Council as to its findings.
Enclosed please find a certified copy of Resolution No. 91-109.
Should you have any questions regarding this matter, please do not
hesitate to call this office.
Very truly yours,
AaJ h) 4w,
Alice M. Reimche
City Clerk
AMR/jmp
Enclosures