HomeMy WebLinkAboutAgenda Report - April 1, 1992 (45)CITY OF LODI
PGEI�M TITLE: Report to the City Council - Sale of Scrap Metal
MEETING DATE: April 1, 1992
PREPARED BY: Finance Director
RfDCMM \DED ACTION: None required. This report is made to the
City Council in compliance with Lodi Municipal
Code section 2.12.120.
BACKGROUND INFORMATION: On February 5. 1992, the City Council auth-
orized the sale of various lots of scrap metal
which had accumulated during the course of
normal utility department operations.
Bid forms were mailed to five scrap metal dealers; two responded. The
high bidder, Sunshine Steel Enterprises of Sacramento, paid $3,103.04 for
the items listed below. in the sale which was completed on March 17, 1992.
Insulated Aluminum
2,575
lbs.
Insulated Copper
1,323
lbs.
Bare Copper
657
lbs. c�
UG Cable (75%Aluminum,
25% Copper)
6,219
lbs.
Copper Pipe
205
lbs.
Lead Pipe
1,015
lbs.
Brass Pipe Fittings
1.018
lbs.
Scrap Iron
1
lot
FUNDING: None required. Income generated: $3,103.04,
jiixon Flynn, Fina ce Director ,
Prepared by Joel Harris, Purchasing Officer
.i ._aA ✓. �...�
M