AGENDA TITLE: Approve Plans and Specifications and Authorize Advertisement for Bids for
Wastewater Infrastructure Replacement Program (Project No. 4)
MEETING DATE: December 17,2008
PREPARED BY: Public Works Director
RECOMMENDEDACTION: Approve the plans and specifications for the Wastewater Infrastructure
Replacement Program Project No. 4 and authorize advertising for bids.
BACKGROUND INFORMATION: The Water and Wastewater Improvement Program is intended to
systematically replace and, where needed, upgrade existing water
and wastewater infrastructure. The older wastewater pipelines are
mostly constructed of terra-cotta or concrete pipe and the waterlines
are largely constructed of small -diameter cast iron or steel pipe. The majority of these pipes are in need
of rehabilitation and/or replacement. Project No. 4 is the fourth project scheduled in this program. This
project has two areas, as shown on the attached map.
Once completed, the improvements wilI enhance the level of service associated with the wastewater system
by increasing reliability, eliminating pipe joint leaks, and decreasing maintenance costs. As with Project Nos.
1 and 2, which were located in the same general area of east of Stockton Street and north of
Kettleman Lane, and Project No. 3, which was located in the greater Downtown area, staff is again
recommendingthe use of trenchless methods of rehabilitation for Project No. 4 to minimize both surface
disruption and costs.
This project, similar to Project No. 3, is for wastewater rehabilitation only. Replacement and upgrading of
water lines in this area will follow as a separate project. Wastewater rehabilitation is performed by
specialty contractors, and the work can be bid more competitively if bid alone.
Project No. 4 includes in-place (trenchless) rehabilitation of approximately 14,385 linear feet of 6 -inch
diameter wastewater main, the rehabilitation of approximately 58 manholes, and the reconnection of
452 wastewater laterals.
The plans and specifications are on file in the Public Works Department. The planned bid opening date
is January 28,2009.
FISCAL IMPACT: Completing this projectwill reduce future maintenance costs and increase
the performance and reliability of the wastewater system.
FUNDING AVAILABLE: The project estimate is $1,070,000. Funds are not appropriated in the
FY 08/09 budget. A request for appropriation of funds will be made at
contract award. "J,,
14AZc�Li,•._
F. Wally i9andelin
Public Works Director
Prepared by Mark Lindseth,Associate Civil Engineer
FWSIMUpmf
Attachment
cc: PurchasingAgent Paula J. Fernander. Senior7raffio Engineer
Wes Fujitani, Senior Civil Engineer Sharon A. Welch, Senior Civil Engineer
APPROVED:
Blair KingCAv Mana_aer
K:lWP1PROJECTS\WATER1EastsideWaterWastewaterRehab\Prolect #41CPS&A.doc 12/12/2008
CITY OF • ,
••:gin,.
FOR_PUBLIC WORKS DEPARTMENT
astewater Main Rehab Program
Project No. 4
Project Location
K:\CADD\PROJECTS\2006\006D018\006D018-G1.dwg, 8.5x11, 11/12/200811:07:09 AM, jpizzo