HomeMy WebLinkAboutAgenda Report - November 19, 2008 E-06AGENDA ITEM E4
All% CITY OF LODI
%W COUNCIL COMMUNICATION
TM
AGENDA TITLE: Approve plans and specifications and authorize advertisementfor bids for
the north pool deck improvements at Blakely Park — Enze/Field Pool
Complex, 1050S. Stockton Street
MEETING DATE: November 19,2008
PREPARED BY: Interim Parks and Recreation Director
RECOMMENDED ACTION: Approve plans and specifications and authorize
advertisement for bids for the north pool deck
improvements at Blakely Park — Enze/Field Pool Complex,
1050 S. Stockton Street.
BACKGROUND INFORMATION: The existing pool deck is in poor condition due to major
cracks and uneven surfaces which result in tripping
hazards. The proposed projectwill provide a new uniform
deck surface that will be maintenancefree and safe for our
pool users. The project was part of the Parks and Recreation Department 2008-2009
Community Development Block Grant program request. The project was presented and
approved by City Council at its regular meeting on March 5, 2006.
The north pool deck work consists of providing all, labor, materials and equipment to install
approximately 7,350 square feet of polymer concrete trowel knockdown finish over the existing
concrete pool decking. Work also includes adjustments of existing utility service box lids within
pool deck area, grinding all existing concrete construction joints, pressure washing, 225 lineal
feet of crack repair, placement of 20 8 -inch square ceramic tile pool markers, installation of color
coat and clear sealers.
FISCAL IMPACT: There is no direct impact to the Parks and Recreation Department budget
for the Enze/Field Pool Complex pool deck improvements; although, the
improvement will reduce current maintenance expense of grinding uneven
surfaces and applying crack filler each year prior to swim season.
Community Development Block Grant funds will be supporting the
improvements of this project in its entirety.
APPROVED: c
Blair King, a0vianager
Approve plans and specifications and authorize advertisement forbids for the north pool deck improvements at Blakely Park — Enz&Fseld Pool
Complex, 1050S. Stockton Street
November 19, 2008
Page 2
FUNDING: 20=Funds $98,000
vans, Budget Manager
James M. Rode -ft
Interim Parks and Recreation Director
Prepared by Steve Virrey. Park Project Coordinator
JMRISWI
cc: CityAttorney
Community Improvement Manager
Park Superintendent
Purchasing Officer
Sr. Civil Engineer Fujitani