Loading...
HomeMy WebLinkAboutAgenda Report - November 19, 2008 E-06AGENDA ITEM E4 All% CITY OF LODI %W COUNCIL COMMUNICATION TM AGENDA TITLE: Approve plans and specifications and authorize advertisementfor bids for the north pool deck improvements at Blakely Park — Enze/Field Pool Complex, 1050S. Stockton Street MEETING DATE: November 19,2008 PREPARED BY: Interim Parks and Recreation Director RECOMMENDED ACTION: Approve plans and specifications and authorize advertisement for bids for the north pool deck improvements at Blakely Park — Enze/Field Pool Complex, 1050 S. Stockton Street. BACKGROUND INFORMATION: The existing pool deck is in poor condition due to major cracks and uneven surfaces which result in tripping hazards. The proposed projectwill provide a new uniform deck surface that will be maintenancefree and safe for our pool users. The project was part of the Parks and Recreation Department 2008-2009 Community Development Block Grant program request. The project was presented and approved by City Council at its regular meeting on March 5, 2006. The north pool deck work consists of providing all, labor, materials and equipment to install approximately 7,350 square feet of polymer concrete trowel knockdown finish over the existing concrete pool decking. Work also includes adjustments of existing utility service box lids within pool deck area, grinding all existing concrete construction joints, pressure washing, 225 lineal feet of crack repair, placement of 20 8 -inch square ceramic tile pool markers, installation of color coat and clear sealers. FISCAL IMPACT: There is no direct impact to the Parks and Recreation Department budget for the Enze/Field Pool Complex pool deck improvements; although, the improvement will reduce current maintenance expense of grinding uneven surfaces and applying crack filler each year prior to swim season. Community Development Block Grant funds will be supporting the improvements of this project in its entirety. APPROVED: c Blair King, a0vianager Approve plans and specifications and authorize advertisement forbids for the north pool deck improvements at Blakely Park — Enz&Fseld Pool Complex, 1050S. Stockton Street November 19, 2008 Page 2 FUNDING: 20=Funds $98,000 vans, Budget Manager James M. Rode -ft Interim Parks and Recreation Director Prepared by Steve Virrey. Park Project Coordinator JMRISWI cc: CityAttorney Community Improvement Manager Park Superintendent Purchasing Officer Sr. Civil Engineer Fujitani