AGENDA TITLE: Adopt Resolution Accepting Improvements at Reynolds Ranch, Phase 1
MEETING DATE: October 15,2008
PREPARED BY: Public Works Director
RECOMMENDED ACTION: Adopt a resolution accepting the improvements at Reynolds Ranch,
Phase 1.
BACKGROUND INFORMATION: Improvements at Reynolds Ranch, Phase 1 have been completed
by the developer, Reynolds Ranch Partners, Inc., in substantial
conformance with the requirements as approved by City Council on
December 19.2007, and as shown on Drawings No. 007DO09-01
through 007D009-75. A drawing of the Reynolds Ranch, Phase 1 project is attached as Exhibit A.
Public improvements included the installation of water, recycled water, wastewater and storm drain
improvements, street pavement improvements for Reynolds Ranch Parkway and the intersection of
Reynolds Ranch Parkway and Harney Lane and public and private landscape and irrigation
improvements to serve the Blue Shield project and future development in the Reynolds Ranch Project.
While the landscape and irrigation improvements are substantially complete, work on those
improvementswill continue and should be completed by October 30, 2008. Completion of the work at
the intersection of Harney Lane and Reynolds Ranch Parkway is scheduled to be completed by
October 17, 2008. Staff recommends that Council accept the improvements at this time to allow the
issuance of a temporary certificate of occupancy for the Blue Shield facility on October 17, 2008. The
acceptance of improvements slightly ahead of completion is commonly afforded to developments to
facilitate occupancy of buildings.
The following streets were dedicated to the City by separate instrument as a condition of this development:
Streets Length in Miles
Reynolds Ranch Parkway 0.72
Harney Lane 0.00
Total New Miles of City Streets 0.72
" The street dedication for Harney Lane widens an existing Street. This street dedication did not add
additional miles to the City's street system_
FISCAL IMPACT: The developer's warranty period of two years will begin on the date of Council
acceptance. There will be a slight increase in long-term maintenance costs
for public infrastructure, such as streets, water, wastewater and storm drain
facilities, landscaping, and other City services.
FUNDING AVAILABLE: Not applicable. A�
F. Wally S delin
Public Works Director
Prepared by Sharon A. Welch, Senior Civil Engineer
Attachment
cc: City Attorney Senior Civil Engineer— Development Service SeniorTraffic Engineer
Streets and Drainage Manager Senior Civil Engineer Fuj itani Senior Engineering Technician
Buildinq Official
APPROVED:
BlairIF4�, City Manager
K:IWPIDEV_SERV1Reyno1ds RanchlCAccept.doc 10/812008
DEPARTMENTCITY OF LODI
��FORPUBLIC WORKS
3AW(l AMEN
133a1s NODWI5
66 'ON sn .,VMHOIH 31d1S
Reynolds Ranch Project
Phase 1
Exhibit A
Qb'0"'V8 OIdIObd NOINn
ls3h
Ef
D >
�W
rli
J UZ I
t
CA
EAz
Qb'0"'V8 OIdIObd NOINn
ls3h
When Recorded, Please Returnto:
Lodi City Clerk
P.O. Box 3006
Lodi, CA 95241-1910
RESOLUTION NO. 2008-202
A RESOLUTION OF THE LODI CITY COUNCIL ACCEPTING
IMPROVEMENTSAT REYNOLDS RANCH, PHASE 1, AS
COMPLETED BY REYNOLDS RANCH PARTNERS, INC.
The City Council of the City of Lodi finds:
1. That all improvements at Reynolds Ranch, Phase 1 have been completed
by the developer, Reynolds Ranch Partners, Inc., in substantial conformance with the
requirements as shown on Drawing Nos. 007DO09-01 through 007DO009-75 on file in
the Public Works Department and as specifically set forth in the plans and specifications
approved by the City Council on December 19,2007.
2. The following streets were dedicated to the City by separate instrument
as a condition of this development:
Street
Reynolds Ranch Parkway
*Harney Lane
* The street dedication for
street dedication did ni
system.
Lenath in Miles
0.72
0.00
Harney Lane widens an existing street. This
t add additional miles to the City's street
Public improvements included the installation of water, recycled water, wastewater, and
storm drain improvements, street pavement improvements for Reynolds Ranch Parkway
and the intersection of Reynolds Ranch Parkway and Harney Lane, and public and
private landscape and irrigation improvements to serve the Blue Shield project and
future development in the Reynolds Ranch Project.
Dated: October 15,2008
hereby certify that Resolution No. 2008-202 was passed and adopted by the
City Council of the City of Lodi in a regular meeting held October 15, 2008, by the
following vote:
AYES: COUNCIL MEMBERS — Hansen, Hitchcock, Johnson, Katzakian,
and Mayor Mounce
NOES: COUNCIL MEMBERS— None
ABSENT: COUNCIL MEMBERS — None
ABSTAIN: COUNCIL MEMBERS — None
A JOHL
City Clerk
2008-202
CITY COUNCIL
JOANNE L. MOUNCE, Maya+
LARRY D. HANSEN
Mayor Pro Tempore
SUSAN HITCHCOCK
BOB JOHNSON
PHIL KATZAKIAN
CITY OF LODI
PUBLIC WORKS DEPARTMENT
CITY HALL, 221 WEST PINE STREET
P.O. BOX 3006
LODI, CALIFORNIA 95241-1910
(209)333-6706
FAX (209) 333-6710
EMAIL pwdept@lodi.gov
http:\\www.lodi.gov
October 16,2008
Reynolds Ranch Partners, Inc.
1420 S. Mills Avenue, Suite L
Lodi, CA 95242
SUBJECT: Reynolds Ranch, Phase I
BLAIR KING
City Manager
RANDI JOHL
City Clerk
D. STEPHEN SCHWABAUER
City Attorney
F. WALLY SANDELiN
Public Works Director
The City Council of the City of Lodi, at its meeting on October 15, 2008, accepted the
public improvements that were made in the subject project.
Enclosed for your files is a copy of the resolution accepting the public improvements.
From the date of the resolution, the City of Lodi will maintain the street and other public
improvements installed within rights-of-way and public utility easements as shown on the
approved plans.
If you have any questions, please contact Rebecca Areida, Manage mentAnalyst, at (209)
33333-6800, ext. 58, or me at (209) 333-6709.
,4U
F. Wallndelin
Public Works Director
FWS1pmf
Enclosure