HomeMy WebLinkAboutAgenda Report - September 17, 2008 E-04AGENDA ITEM Ea 44
ift CITY OF LODI
VW COUNCIL COMMUNICATION
TM
AGENDA TITLE: Adopt Resolution Awarding Contract for School Street and Spruce Street
Wastewater Pipe Improvement Project to L. R. Gomez Construction, of Dixon
($63,130), and Appropriating Funds ($83,000)
MEETING DATE: September 17,2008
PREPARED BY: Public Works Director
RECOMMENDED ACTION: Adopt a resolution awarding the contract for the School Street and
Spruce Street Wastewater Improvement project to L. R. Gomez
Construction, of Dixon, in the amount of $63,130 and appropriating
funds in accordance with the recommendation shown below.
BACKGROUND INFORMATION: This project consists of trenching and installing approximately 535
linearfeet of eight -inch wastewater pipe, abandoning the existing
wastewater pipe, and other and incidental and related work, all as
shown on the plans and specifications for the above project. The
location of the project is shown on the attached Exhibit A.
The existing wastewater pipe in this section of School Street was video inspected in June 2008. The
concrete pipe has extensive deterioration. The pipe joints have large offsets and the pipe wall has
a severe corrosion problem. The corrosion problem is so severe that there are sections of the pipe
missing.
Plans and specifications for this project were approved on August 6,2008. The City received the
following 11 bids for this project on August 27, 2008.
Bidder
Location
Base Bid
Engineer's Estimate
$69,200.00
L.R. Gomez Construction
Dixon
$63,130.00
A-1 Construction
Castro Valley
$73,330.00
RWB Construction
Winters
$75,970.00
Preston Pipelines, Inc.
Milpitas
$77,750.00
Carl Crutchfield
Stockton
$78,873.00
AC General Engineering
Sacramento
$82,390.00
Teichert Construction
Stockton
$85,205.00
G&N Construction
Stockton
$85,310.00
Knife River Construction
Stockton
$85,330.00
BJK Construction
Dixon
$120,501.00
Pfister Excavating, Inc.
Vallejo
$143,525.00
APPROVED:
Blair King, Manager
K:IWPIPROJECTSISEWER1SchoolStWastewaterPipe\CAward.doc 91912008
Adopt Resolution Awarding Contract for School Street and Spruce Street Wastewater Pipe Improvement
Project to L. R. Gomez Construction, of Dixon ($63,130), and Appropriating Funds ($83,000)
September 17, 2008
Page 2
FISCAL IMPACT: This projectwill decrease the amount of maintenance requiredfor this
section of the wastewater pipe.
FUNDING AVAILABLE: The requested appropriation includes contingencies, contract
administration and construction inspection.
Requested Appropriation ($83,000): Wastewater Capital Outlay (171010)
Budget Manager
J/1 " I J 4,4, jL
F. Wally andeiin
Public Works Director
Prepared by Lyman Chang, Senior Civil Engineer
FWSILCIpmf
Attachment
cc: City Attorney
Purchasing0ficer
Water Services Manager
Senior Civil Engineer, Chang
K:1W PIPROJECTS%SEW ER1SchoolStW astewaterPipe\CAward.doc 9/9/2008
.••:-1DICITY OF LOPUBLIC WORKS DEPARTMENT
EXHIBIT A
School St & Spruce St
Wastewater Pipe Improvements/
R Projects\School St WW Replacement\CC_Exhibit A.dwg, Layout3, 07/17/2008 8:27:06 AM, Ichang
SCHOOL STREET AND SPRUCE STREET
WASTEWATER PIPE IMPROVEMENTS CONTRACT
CITY OF LODI, CALIFORNIA
THIS CONTRACT made by and between the CITY OF LODI, State of California, herein
referred to as the "City," and L. R. GOMEZ CONSTRUCTION, herein referred to as the
"Contractor:"
WITNESSETH:
That the parties hereto have mutually covenanted and agreed, and by these presents do
covenant and agree with each other, as follows:
The complete Contract consists of the following documents which are incorporated herein by
this reference, to -wit:
Notice Inviting Bids
Information to Bidders
General Provisions
Special Provisions
Bid Proposal
Contract
Contract Bonds
Plans
The July 2002 Edition,
Standard Specifications,
State of California,
Business and Transportation Agency,
Department cf Transportation
All of the above documents, sometimes hereinafter referred to as the "Contract Docu'ments,"
are intended to cooperate so that any work called for in one and not mentioned in the other is to
be executed the same as if mentioned in all said documents.
ARTICLE I - That for and in consideration of the payments and agreements hereinafter
mentioned, to be made and performed by the City and under the condition expressed in the two
bonds bearing even date with these presents and hereunto annexed, the Contractor agrees
with the City, at Contractor's cost and expense, to do all the work and furnish all the materials
except such as are mentioned in the specifications to be furnished by the City, necessary to
construct and complete in a good workmanlike and substantial manner and to the satisfaction
of the City the proposed improvements as shown and described in the Contract Documents
which are hereby made a part of the Contract.
ARTICLE II - The City hereby promises and agrees with the Contractor to employ, and does
hereby employ, the Contractor to provide all materials and services not supplied by the City and
to do the work according to the terms and conditions for the price herein, and hereby contracts
to pay the same as set forth in Section 5.600, "Measurement, Acceptance and Payment," of the
General Provisions, in the manner and upon the conditions above set forth; and the said parties
for themselves, their heirs, executors, administrators, successors and assigns, do hereby agree
to the full performance of the covenants herein contained.
ARTICLE 111 - The Contractor agrees to conform to the provisions of Chapter 1, Part 7, Division
2 of the Labor Code. The Contractor and any Subcontractor will pay the general prevailing
wage rate and other employer payments for health and welfare, pension, vacation, travel time,
CONTRACT.DOC I 08/27/2008
and subsistence pay, apprenticeship or other training programs. The responsibility for
compliance with these Labor Code requirements is on the prime contractor.
ARTICLE IV - And the Contractor agrees to receive and accept the following prices as full
compensation for furnishing all materials and for doing all the work contemplated and embraced
in this agreement; also for all loss or damage arising out of the nature of the work aforesaid or
from the action of the elements, or from any unforeseen difficulties or obstructions which may
arise or be encountered in the prosecution of the work until its acceptance by the City, and for
all risks of every description connected with the work; also for all expenses incurred by or in
consequence of the suspension or discontinuance of work and for well and faithfully completing
the work, and the whole thereof, in the manner and according to the Plans and Contract
Documents and the requirements of the Engineer under them, to -wit:
Perform the work of trenching and installing approximately 535 linear feet of 8 -inch wastewater
pipes, abandoning the existing wastewater pipe, and other incidental and related work, all as
shown on the plans and specifications for the above project.
CONTRACT ITEMS
ITEM EST'D.
NO. DESCRIPTION UNIT QTY UNIT PRICE TOTAL PRICE
1. Traffic Control
2. Excavation Safety
3. Trench & Install 8 -inch
Wastewater Pipe
4. Install 4 -inch Wastewater
Service
5. Install 48 -inch Wastewater
Manhole
6. Manhole Rehabilitation
LS
1
$
3,500.00
$ 3,500.00
LS
1
$
2,100.00
$ 2,100.00
LF
535
$
50.00
$26,750.00
EA 8
EA 2
EA 2
7. Abandon Wastewater Manhole EA 1
8. Abandon Existing Wastewater
Pipe LS 1
g. Minor Concrete SF 300
$ 600.00 $ 4,800.00
$ 4,000.00
$
8,000.00
$ 4,440.00
$
8,880.00
$ 5,000.00
$
5,000.00
$ 500.00
$
500.00
$ 12.00
$
3,600.00
TOTAL
$63,130.00
ARTICLE V - By my signature hereunder, as Contractor, I certify that I am aware of the
provisions of Section 3700 of the Labor Code, which requires every employer to be insured
COntract.DOC 2 08/27/08
against liability for workers' compensation or to undertake self-insurance in accordance with the
provisions of that code, and I will comply with such provisions before commencing the
performance of the work of this contract.
ARTICLE VI - It is further expressly agreed by and between the parties hereto that, should
there be any conflict between the terms of this instrument and the Bid Proposal of the
Contractor, then this instrument shall control and nothing herein shall be considered as an
acceptance of the said terms of said proposal conflicting herewith.
ARTICLE VII - The City is to furnish the necessary rights-of-way and easements and to
establish lines and grades for the work as specified under the Special Provisions. All labor or
materials not mentioned specifically as being done by the City will be supplied by the Contractor
to accomplish the work as outlined in the specifications.
ARTICLE VIII - The Contractor agrees to commence work pursuant to this contract within 15
calendar days after the City Manager has executed the contract and to diligently prosecute to
completion within 22 WORKING DAYS.
WHEN SIGNING THIS CONTRACT, THE CONTRACTOR AGREES THAT THE TIME OF
COMPLETION FOR THIS CONTRACT IS REASONABLE AND THE CONTRACTOR AGREES
TO PAY THE CITY LIQUIDATED DAMAGES AS SET FORTH IN SECTION 6-04.03 OF THE
SPECIAL PROVISIONS. CONTRACTOR AGREES THAT THIS AMOUNT MAY BE
DEDUCTED FROM THE AMOUNT DUE THE CONTRACTOR UNDER THE CONTRACT.
IN WITNESS WHEREOF, the parties to these presents have hereunto set their hands the year
and date written below.
CONTRACTOR: CITY OF LODI
By:
Title
(CORPORATE SEAL)
By;
Blair King
City Manager
Date:
Attest:
City Clerk
Approved As To Form
D. Stephen Schwabauer
C" Attorney
Contract.DOC 3 08/27/08
RESOLUTION NO. 2008-184
A RESOLUTION OF THE LODI CITY COUNCIL
AWARDING THE CONTRACT FOR SCHOOL STREET
AND SPRUCE STREET WASTEWATER PIPE
IMPROVEMENT PROJECT AND FURTHER
APPROPRIATING FUNDS
WHEREAS, in answer to notice duly published in accordance with law and the
order of this City Council, sealed bids were received and publicly opened on August 27,
2008, at 11:00 a.m. for the School Street and Spruce Street Wastewater Pipe
Improvement project described in the specifications therefore approved by the City
Council on August 6,2008; and
WHEREAS, said bids have been checked and tabulated and a report thereof
filed with the City Manager as follows:
Bidder
Bid
L.R. Gomez Construction
$
63,130.00
A-1 Construction
$
73,330.00
RWB Construction
$
75,970.00
Preston Pipelines, Inc.
$
77,750.00
Carl Crutchfield
$
78,873.00
AC General Engineering
$
82,390.00
Teichert Construction
$
85,205.00
G & N Construction
$
85,310.00
Knife River Construction
$
85,330.00
BJK Construction
$
120,501.00
Pfister Excavating, Inc.
$
143,525.00
WHEREAS, staff recommends awarding the contract for the School Street and
Spruce Street Wastewater Pipe Improvement project to the low bidder, L. R. Gomez
Construction, of Dixon, California.
NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council does hereby
award the contract for the School Street and Spruce Street Wastewater Pipe
Improvement project to the low bidder, L. R. Gomez Construction, of Dixon, California, in
the amount of $63,130; and
BE IT FURTHER RESOLVED that funds in the amount of $83,000 be
appropriated from the Wastewater Capital Outlayfund for this project.
Dated: September 17, 2008
hereby certify that Resolution No. 2008-184 was passed and adopted by the
Lodi City Council in a regular meeting held September 17, 2008, by the following votes:
AYES: COUNCIL MEMBERS— Hansen, Hitchcock, Johnson, Katzakian,
and Mayor Mounce
NOES: COUNCIL MEMBERS— None
ABSENT: COUNCIL MEMBERS — None
ABSTAIN: COUNCIL MEMBERS—None
eNDI )JOHL
City Clerk
2008-184