Loading...
HomeMy WebLinkAboutAgenda Report - August 6, 2008 E-04AGENDA ITEM Ew'4 A� CITY OF LODI COUNCIL COMMUNICATION ,m AGENDA TITLE: Approve Plans and Specifications and Authorize Advertisement for Bids for Lodi Public Library Phase 1 Remodel Project MEETING DATE: August 6,2008 PREPARED BY: Public Works Director RECOMMENDED ACTION: Approve plans and specifications and authorize advertisement for bids for the Lodi Public Library Phase 1 Remodel Project. BACKGROUND INFORMATION: The Lodi Public Library has been working with their architect to develop plans to renovatethe Lodi Public Library. The Library Board has decided to implement the renovation as a phased project. Phase 1 includes renovation of the main lobby public restrooms and staff restrooms to meet ADA requirements, new ADA door hardware, new entry tile, new service desk, new employee work stations (including voice and data cabling), and new floor coverings and paint in these areas. Working with Library staff, Wenell Mattheis Bowe, the architect, has completed plans and specifications for the Phase 1 project. A drawing of the proposed floor plan is attached for reference as ExhibitA. Council is being asked to approve the plans and specifications and authorize advertising for bids for the project. The Library main entry ramp and building HVAC are being addressed under separate projects concurrently with Phase 1 The plans and specifications are on file in the Public Works Department. FISCAL IMPACT: The approximate construction cost is $690,000 FUNDING AVAILABLE: Funding by the Library Fund (211814) approved in Fiscal Year 08/09 Budget. Planned Bid Opening Date: September 9, 2008 fd UI F. Wally S ndelin Public Works Director Prepared by Gary Wiman, Construction Project Manager FWS1GWIpmf Attachment cc: Ruby Paiste, Financial Services Manager Gary Wiman, Construction Project Manager Nancy Martinez. Library Services Director APPROVED: Blair King, Ci Manager KAWPXPROJECTSW ISC1LISRARY1Ledi Public Library Phase 1 RemodellCPS&A.dac 7/3012008 5'- 5H; 25 LF STOR. SHELVINRECEIVING 128. 00 C LIBRAR 127.1 3 AIR MAINTENANCE 125.1 125 5 I I I� I L (� r z I_ i1A NO. Fe INSULATION INTERIOR EXTERIOR PRODUCTION ARTS: 10 LF P05TER �BD. STOF_. 120 u � 6' X 10' BUSIN SS 129.1 OFFICE G 8 0 6 130 13 OPY/WORK: 8 L 4 130.1 Ac 10 12 26. -MAGAZINE/ REF: 160 LF 40'X 5H: +84" (180 LF TOTAL) YARD STORAGE ,�� 1 12 f►.Y.IA STAFF 121 MICRO -FILM 40'X 5H: +84" (180 LF TOTAL) NEW5PAPER- 5TOR: 100 LF 120.1 I I I I I I I I I I I I I I j I I I I I II II CHILDRENS I AREA I I j 104 I I I I I I I I I I I I I I I 4 I I �i n n Ll----------- ------------ ------ j I I I I � 6A . 1 ACTIVITY ROOM JD \ 114 110 1 LIBRARIAN GIRL n �� COMPUTER ROOM 111 MULTIPURPOSE ROOM 105 B KITCHE _9FI F1 _1 _2Fl 113 STORAGE _7Fl D D ILi � D D ILi � D � REMODELED FLOOR PLAN SCALE : 1/8" = 1'0" ENE CONFERENCE 106 D 115 OBBY 101 NOTE : NATER RESISTANT GYPSUM BOARD REQUIRED AT PLUMBING FIXTURES AND BBIVIM TILED NALLS. WALL SCHEDULE NO. SIZE TYPE INSULATION INTERIOR EXTERIOR F.R. U.L. 6" X 20 GA. MTL. R-19 F.G. 5/a" GYP. STUDS @ 16" O.C. BATT BD. BOTH TO *'-*" A. F. F. SIDES 6" X 20 GA. MTL. R-19 F.G. GYP. STUDS Q 16" O.C. BATT BD. BOTH SIDES 20 GA. MTL. R-11 F.G. 5/S" GYP. STUDS Q 16" BATT BD. BOTH O.C.- INFILL WALL SIDES Ll U U U STUD SIZ APPLICATION SIZE MAX. HT. INTERIOR STUDS 4" X 20 GA. - 4001C20 15'-0" 4" X 16 GA. - 4001C16 20'-0" 6" X 20 GA. - 6001C20 20'-0" ------------------------ --------------�----------------------------------------------------------------------r 02'1 i COLLECTION I I j 131 j I I I I I I I I I I I RARI N I F-1 n I I 3 ❑ ❑ E_ - ICE i0 I I i E/ I II � II �,�------------------- ----------,r� I II I � i I II I i II I � i II OI / 1 I 1 1 I �� �� I I I I I 11 I 4 1 1 n M II OI II I ; II MAIN READING i� ROOM El E�------ -------------- -- - ---� ACTIVIZ E Ell1 Ili SII L--------------------------------------------- E I ❑ ❑ I n n n n I I I I I I I I I I I I I I I I I I I I I I I I I II I I L-- - -----------------------DU------------------------------------------------------------------------- FLOOR PLAN NOTES ONEW FLOOR TILE - SEE FINISHES SCHEDULE O LINE OF CARPET PATTERN TRANSITION O NEW CARPET- SEE FINISHES SCHEDULE PROVIDEVINYL TRANSITION MOULDING@ INTERSECTIONOF FLOORING TYPES O NEW SHEETVINYL FLOORING- SEE FINISHES SCHEDULEI I (E) ELECTRICAL PANELS- PAINT TO MATCH (N) DOOR FRAME COLOR O(E) CARPET TO REMAIN ;2 REPLACE (E) COUNTER TOP- SEE CABINET ELEVATIONS O (E) FURNITURETO REMAIN13 PATCH& REPAIRWALLAS REQUIRED@ DEMOLISHED DOOR FRAME O6 FURNITURETO BE PROVIDEDAND INSTALLED BY OTHERS - TYP. 14 PROVIDE (N) CASEWORK - SEE CABINET ELEVATIONS OLIBRARY EQUIPMENTTO BE PROVIDEDAND INSTALLED BY 15 PAINT& TEXTURE (N) INFILL WALL TO MATCH ADJACENT WALL OTHERS-TYP. O (N) CONTROL KEY PAD O- SEE SPECIFICATIONS <@>PROVIDE STEEL WALL ANGLE - SEE C/A11.2 ;-► (N) RAMP UNDER SEPERATE SCOPE OF WORK PAINT (E) LOCKERS/ POLE & SHELF TO MATCH (N)ADJACENT 18 WALL COLOR EXISTING SERVER RACKTO REMAIN IN PLACE DURING Iq CONSTRUCTION 0 RE-INSTALL(E)RESTROOM DOORS& FRAMES- SEE DOOR SCHEDULE 21 4)> <*> Exhibit A I MAIL SLOTS 8 C �(E) STORAC E 21 LF '17 12 WMB ARCHITECTS 246 E. MainStreet Stockton, CA95202 T209-944-9110 209.944.5711 www.wmbarchitects.com LARRY WENELL TIM MATTHEIS TOM BOWE DOUG DAVIS MELANIE VIEUX PRINCIPAL ARCHITECTS Lodi Public Library Phase I Remodel 201 W. Locust Street Lodi, California REMODELED FLOOR PLAN Q DATE REVISION WMB PROJECT:08-66 DATE: 05.29.08 A2. 1 J:\2008\08-66\CADW2-notfp.dwg, 7/29/2008 7:59:29 AM, Copyright WMB, Inc.