HomeMy WebLinkAboutAgenda Report - July 16, 2008 E-08AGENDA ITEM E-08 CITY OF LODI COUNCIL COMMUNICATION AGENDA TITLE: Adopt Resolution Authorizing City Managerto Execute a Contract Change Order with Western Water Constructors, Inc., of Santa Rosa, for Work Related to Concrete Lining of Sludge Lagoon No. 1 and Associated Equipment at the White Slough Water Pollution Control Facility and Appropriating $900,000 MEETING DATE: July 16,2008 PREPARED BY: Public Works Director RECOMMENDED ACTION: Adopt a resolution authorizing the City Manager to execute a contract change order with Western Water Constructors, Inc., of Santa Rosa, for work related to concrete lining of Sludge Lagoon No. 1 and associated equipment at the White Slough Water Pollution Control Facility and appropriating $900,000, BACKGROUND INFORMATION: The White Slough facility currently has one operational sludge lagoon (Sludge Lagoon No. 2) and one vacant sludge lagoon (Sludge Lagoon No. 1). Due to changes in the discharge permit, the City is required to increase the sludge -holding capacity. The most expeditious and economical method to increase sludge -holding capacity and meet the requirement is to concrete line Sludge Lagoon No. 1 and place it back in service, as shown on the attached drawing. Staff proposes to use Western Water Constructors, Inc., to perform the work included in this change order because they are currently under contract for the Phase 3 improvements project. Western Water Constructors has crews and equipment available to begin the work immediately so that the lagoon can be completed and placed in service before the next rain season. Final change order pricing is being negotiated. The Engineer's estimate for the work is $1,032,000. Working together on value engineering ideas, City staff and Western Water Constructors believe the work can be completed for less then $900.000. The contract change order for this work would be approximately 5.5% of the original contract price. The requested appropriation includes contingency funds in case unknown conditions are discovered during the actual installation. The change order costs have been reviewed by City staff and our design engineers, West Yost & Associates. FISCAL IMPACT: This work was anticipated in the cost estimates for the multi -phased White Slough Water Pollution Control Facility Improvements. FUNDING AVAILABLE: The requested appropriation of $900,000 will be from 2007 Certificates of Parti ' i roceeds. vans, Budget Director /17" 11 lqe�JQAA46 J& I F. Wally S delin PublicWorks Director Prepared by Gary Wiman. Construction Project Manager Attachment FW51GWlpmf APPROVED: Blair KingCio Manager K MPIPROJECTSISEWERSWSWPCRWhite SloughWPCF Phase 3 improvements 20071C CC emWater Sludge Lagoon.doc 71912008 RESOLUTION NO. 2008-139 A RESOLUTION OF THE LODI CITY COUNCIL AUTHORIZING THE CITY MANAGER TO EXECUTEA CONTRACT CHANGE ORDER FOR WORK RELATED TO CONCRETE LINING OF SLUDGE LAGOON NO. 1 AND ASSOCIATED EQUIPMENTAT THE WHITE SLOUGH WATER POLLUTION CONTROL FACILITYAND FURTHER APPROPRIATING FUNDS WHEREAS, due to changes in the White Slough Water Pollution Control Facility Discharge Permit, the City of Lodi is required to increase the facility's sludge -holding capacity; and WHEREAS, the most expeditious and economical method to increase the sludge - holding capacity is to concrete line Sludge Lagoon No. 1, which is currently vacant; and WHEREAS, staff recommends using Western Water Constructors, Inc., of Santa Rosa, California, to perform the work because it is currently under contract for the Phase 3 improvement project and has crews and equipment available to begin the work immediately so that the lagoon can be completed and placed in service before the next rain season. NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council does hereby authorize the City Manager to execute a Contract Change Order for the White Slough Water Pollution Control Facility Phase 3 Improvements 2007 Project for work related to concrete lining of Sludge Lagoon No. 1 and associated equipment at the White Slough Water Pollution Control Facility; and BE IT FURTHER RESOLVED that funds in the amount of $900,000 be appropriatedfor this project from the 2007 Certificates of Participation proceeds. Dated: July 16, 2008 hereby certifythat Resolution No. 2008-139 was passed and adopted by the City Council of the City of Lodi in a regular meeting held July 16, 2008, by the following vote: AYES: COUNCIL MEMBERS— Hansen, Hitchcock, Johnson, Katzakian, and Mayor Mounce NOES: COUNCIL MEMBERS— None ABSENT: COUNCIL MEMBERS— None ABSTAIN: COUNCIL MEMBERS— None euriaHL City Clerk 2008-139