HomeMy WebLinkAboutAgenda Report - July 16, 2008 E-06AGENDA ITEM go
► 10
Oft CITY OF LODI
COUNCIL COMMUNICATION
TM
AGENDA TITLE: Adopt Resolution Awarding the Purchase of Padmount Transformers to
Various Vendors ($148,908.36) (EUD)
MEETING DATE: July 16,2008
PREPARED BY: Electric Utility Director
RECOMMENDED ACTION:
Adopt a resolution awarding the bids for the purchase of padmount
transformers to the bidders whose proposals and equipment meet
City of Lodi specifications, and whose transformers are expected to
yield the lowest life -cycle costs.
BACKGROUND INFORMATION:
On March 19, 2008, the City Council authorized the Electric Utility
Department (EUD) to advertise for bids as necessary to meet the
EU D's needs for padmount transformers through the fiscal year.
On June 11, 2008, bids were opened
for nine sizes of padmount transformers, and life -cycle costs were
evaluated (Life -cycle costs are the
combined total purchase price plus cost of operation based on
estimated power loss during the projected life of the transformer). It is recommended that the following
bids be awarded:
7 each 37.5kVA, I -Phase
GEXPRO $12,973.10
8 each 54kVA, I -Phase
GEXPRO 16,248.70
6 each 75kVA, I -Phase
GEXPRO 14,410.49
1 each 75kVA, 3 -Phase
Pauwels Transformers 5,294.84
leach 225kVA, 3 -Phase
Pauwels Transformers 8,541.34
1 each 50okVA, 3 -Phase, 208Y
Pauwels Transformers 14,422.34
2 each 500kVA, 3 -Phase. 480Y
Pauwels Transformers 25,752.25
2 each 1500kVA, 3 -Phase
HEES Enterprises, Inc. 51,265.30
$148,908.36
Proposals are also evaluated on the basis of compliance with equipment and bid specifications. Failureto
comply with both may lead to disqualification of the bid. A summary of the bid evaluation is attached as
Exhibit A. The transformers are planned for use in residential and commercial developments and
upgrades within the City. Other transformers are to bring the number of stock transformers of different
sizes to the required inventory level.
FISCAL IMPACT: Procurement cost is $148,908.36.
FUNDING Acco '160651.7711
sins, BudaldManager
f�
George F. eorrow, Electric Utilit irector
PREPARED BY: Demy Bucaneg,Jr., P.E..Manager/Asst. Electric Utility Director, Engineering& Operations
APPROVED: ti
Blair 9 ty Manager
AGENDA ITEM
EXHIBIT A: Bid Evaluation Summary
APPROVED:
Blair King, City Manager
Transformer Bid Evaluation
Bid Opening: June 11, 2008
Padmount
Tax (factor):
1.0775
Primary Windings:
Three -Phase, 12000 Volt,
60Hz, Delta Connected
No Load
Loss $/watt:
3.75
Sin le -Phase, 12000
Grd.
W e/6930
Volt, 60Hz
June 11 , 2008
Load Loss $/watt:
1.25
Bid Item 1: 37.5 kVA, 2401120 Volt, Single Phase Pad
Number
of units:
7
28
>1.5
Vendor
Unit
Extended
Price
No Load
Load
No Load
Load
Cost of
Life Cycle
Delivery
Height
Impedance
Price $
Price $
w/tax $
Loss (watts) Loss watts
Loss value
Lass value
Losses $
Cost $
weeks
inches
%
Hees Enterprises. Inc.
1.639.00
11 ,473.00
12,362.16
86
471
2,257.50
4,121.25
6,378.75
18,740.91
6-8
26
2.000 E
Howard Industries, Inc.
2.080.001
14,560.001
15,688.40
90
458
2,362.50
4,007.50
6,370.00
22,058.40
6-8
28
1.90qE
HD Supply Utilities Ltd.
GEXPRO
PAUELS Transformers
1.841.001
1,720.00
NO BID
12,887.00
12,040.00
13,885.74
12,973.10
94
70
434
448
2,467.50
1,837.50
3,797.50
3,920.00
6,265.00
5,757.50
20,150.74
18,730.60
8-10
8-10
24
1.50
1.820 E
Moloney Electric, Inc.
2,519.00
17,633.001
18,999.56
106
442
2,635.00
3,667.50
6,702.50
25,702.06
10-12
26
1.700
Bid Item 2: 50 kVA, 2401120 Volt, Single Phase Pad,
Number
of units:
6
26
>1.6
Vendor
Unit
Extended
Price
No Load
Load
No Load
Load
Cost of
Life Cycle
Delivery
Height
Impedance
Price $
Price $
w/tax $
Loss watts Loss watts
Loss value
Loss value
Losses $
Cost $
weeks
inches
%
Hees Enterprises, Inc.
1,866.00
14,848.00
15,998.72
104
574
3,120.00
5,740.00
8,860.00
24,858.72
6-8
26
2.200 E
Howard Industries, Inc.
2,345.00
18,760.00
20,213.90
110
564
3,300.00
5,640.00
6,940.00
29,153.90
6-8
26
1.900
HD Supply Utilities Ltd.
GEXPRO
PAUWELS Transformers
2,035.00
1.886.00
NO BID
16,260.00
16,080.00
17,541.70
16,248.70
113
86
5691
586
3,390.00
2,680.00
5,690.00
5,860.00
9,080.00
8,430.00
26,621.70
24,678.70
8-10
8-10
24
1.600 E
1.940 E
Moloney Electric, Inc.
2,700.00
21 ,600.00
23,274.00
117
631
3,510.00
6,310.00
9,820.00
33,094.00
10-12
25
2.200
APPROVED:
Blair King, City Manager
Bid Item 3: 75 kVA, 2401120 Volt, Single Phase Pad,
Number of units:
6
28
>1.8
Vendor
Unit
Extended
Price
No Load
Load
No Load
Load
Cost of
Life Cycle
Delivery
Height
Impedance
Price $
Price $
wltax $
Loss watts Loss watts
Loss value
Loss value
Losses $
Cost $
weeks
inches
%
Hees Enterprises. Inc.
2,303.00
13,818.00
14,888.90
172
683
3,870.00
5,122.50
8,992.54
23,881.40
6-8
26
2.10O.E
Howard Industries, Inc.
3,024.001
18,144.001
19,550.161
156i
696
3,487.50
6,220.001
8,707.501
28,257.66
6-8
28
1.9001 1
HD Supply Utilities Ltd.
GEXPPO
PAUWELS Transformers
2,500.00
2,229.00
NO BID
15,000.00
13,374.00
16,162.50
14,410.49
160
104
663
946
3,600.00
2,340.00
4,972.50
7,095.00
6,572.50
9,435.00
24,735.00
23,845.49
8-101
8-10
241
1.800 1 E
2.160 E
Moloney Electric, Inc.
3,133.00
18,798.00
20,254.85
152
896
3,420.00
6,720.00
10,140.00
30,394.85
10-12
25
2.100
Bid Item 4: 75 kVA, 480Y1277 Volt, Three Phase Pad
Number of units:
1
65
>2.0
Vendor
Unit
Extended
Price
No Load
Load
No Load
Load
Cost of
Life Cycle
Deliver
Height
Impedance
Price $
Price $
wltax $
Loss (watts) Loss watts
Loss value
Loss value
Losses $
Cost $
weeks
inches
%
Hees Enterprises. Inc.
5,757.00
5,757.00
6,203.17
161
1099
603.75
1,373.75
1,977.50
8,180.67
10-12
49
2.200
Howard Industries, Inc.
5,985.00
5,985.00
6,448.84
184
1032
690.00
1,290.00
1,980.00
8,428.84
8-10
44
2.500
HD Supply Utilities Ltd.
6,217.00
6,217.00
6,698.82
212
800
795.00
1,000.00
1,795.00
8,493.82
7-9
50
3.650 E
GEXPRO
PAUWELS Transformers
Moloney Electric, Inc.
6,359.00
4,914.00
10,316.00
6,359.00
4,914.00
10,316.001
6,851.82
5,294.84
11,775.49
230
247
289
810
990
789
862.50
926.25
1,083.751
1,012.50
1,237.50
966.25
1,875.00
2,163.75
2,070.00
8,726.82
7,458.59
13,785.49
10-12
14-16
12-141
52
63
4.030 E
2.150
2.900
Bid Item 5: 225 kVA, 480Y)277 Volt, Three Phase Pad,
Number
of units:
1
65
>3.6
Vendor
Unit
Extended
Price
No Load
Load
No Load
Load
Cost of
Life Cycle
Delivery
Height
Impedance
Price $
Price $
wltax $
Loss watts Loss watts
Loss value
Loss value
Losses $
Cost $
weeks
inches
%
Hees Enterprises, Inc.
8,623.00
8,623.00
9,291.28
271
3424
1,016.26
4,280.00
5,296.25
14,587.53
10-12
57
3.500
Howard Industries, Inc.
9,396.00
9,398.00
10,126.35
439
2223
1,646.25
2,778.75
4,425.00
14,551.35
8-10
51
4.900
HD Supply Utilities Ltd.
8,790.00
8,790.00
9,471.23
480
1681
1,600.00
2,101.25
3,901.25
13,372.48
7-9
50
4.020 E
GEXPRO
PAUWELS Transformers
Moloney Electric, Inc.
9,049.00
7,927.00
13,126.00
9,049.00
7,927.00
1 13,126.001
9,750.30
8,541.34
14,143.271
448
416
5731
2,350
2433
20591
1,680.00
1,660.00
2,148.751
2,937.50
3,041.25
2,573.751
4,617.50
4,601.25
4,722.501
14,367.80
13,142.59
18,865.77
10-12
14-16
12-141
52
631
5.590 E
3.710
3.900
Bid Item 6: 500 kVA, 208YJ120 Volt, Three Phase Pad,
Number of units:
1
75
>4.0
Vendor
Unit
Extended
Price
No Load
Load
No Load
Load
Cost of
Life Cycle
Delivery
Height
Impedance
Price $
Price $
wltax $
Loss watts Loss watts
Loss value
Loss value
Losses $
Cost $
weeks
inches
%
Hees Enterprises. Inc.
13,893.00
13,893.00
14,969.71
402
7661
1,507.50
9,576.25
11 ,083.76
26,053.46
10-12
49
4.400
Howard Industries, Inc.
16,331.00
16,331.00
17,596.651
8581
3867
3,217.50
4,833.75
8,051.261
25,647.90
8-10
65
4.500
HD Supply Utilities Ltd.
14,316.00
14,316.00
15,425.49
864
4049
3,240.00
5,061.25
8,301.25
23,726.74
7-91
50
4.970 E
GEXPPO
PAUWELS Transformers
Moloney Electric, Inc.
1 14,870.00
13,385.00
18,392.00
14,670.001
13,365.00
18,392.001
16,022.431
14,422.34
19,817.38
8861
816
1023
37811
4713
3846
3,322.501
3,067.50
3,6313.261
4,726.25
5,691.25
4,807.50
6,048.761
6,958.75
8,643.76
24,071.18
23,381.09
28,461.13
10-121
14-16
12-14
58
631
4.470 E
4.350
4.300
Bid Item 7: 500 kVA, 480Y1277 Volt, Three Phase Pad
Number of units:
2
75
>4.0
Vendor
Unit
Extended
Price
No Load
Load
No Load
Load
Cost of
Life Cycle
Delivery
Height
Impedance
Price $
Price $
wltax $
Loss (watts) Loss watts
Loss value
Loss value
Losses $
Cost $
weeks
inches
%
Hees Enterprises. Inc.
13,530.00
27,060.00
29,157.15
396
7126
2,970.00
17,815.00
20,785.00
49,942.15
10-12
49
4.500
Howard Industries, Inc.
14,683.00
29,366.00
31,641.87
858
3648
6,435.00
9,120.00
15,555.00
47,196.87
6-8
63
4.600
HD Supply Utilities Ltd.
14,888.00
29,776.00
32,083.64
865
3366
6,487.50
8,415.00
14,902.50
46,986.14
7-9
50
4.320 E
GEXPRO
PAUWELS Transformers
Moloney Electric, Inc.
14,445.00
11 ,950.00
18,240.00
28,890.00
23,900.00
36,460.001
31,128.98
25,752.25
39,307.20
868
791
1056
3382
4947
3470
6,510.00
5,932.50
7,920.001
8,455.00
12,367.50
8,675.00
14,965.00
18,300.00
16,595.00
46,093.98
44,052.25
55,902.20
10-12
14-16
12-141
58
63
4.420 E
4.290
4.500
Bid Item 8: 1500 kVA, 480Yf277 Volt,
Three Phase Pad,
Number
of units:
2
90
>5.3
Vendor
Unit
Extended
Price
No Load
Load
No Load
Load
Cost of
Life Cycle
Delivery
Height
Impedance
Price $
Price $
wltax $
Loss watts Loss watts
Loss value
Loss value
Losses $
Cost $
weeks
inches
%
Hees Enterprises, Inc.
Howard Industries, Inc.
23,789.00
27,741.00
47,578.00
56,462.001
51,265.30
59,781.86
1827
1551
9782
11604
13,702.50
11,632.501
24,455.00
29,010.00
38,157.50
40,642.50
89,422.80
100,424.36
10-12
8-101
63
71
5.800
6.100
HD Supply Utilities Ltd.
28,990.00
57,960.00
62,473.45
1866
9711
13,995.00
24,277.50
36,272.50
100,745.95
10-12
72
5.710 E
GEXPRO
33,580.00
67,160.00
72,364.90
1.950
9,297
14,625.00
23,242.50
37,867.50
110,232.40
10-12
5.780 E
PAUWELS Transformers
24,283.00
48,566.00
52,329.87
1688
12676
12,660.00
31 ,690.00
44,350.00
96,679.87
14-16
72
5.750
Moloney Electric, Inc.
36,182.00
72,364.00
77,972.21
2151
9424
16,132.50
23,560.00
39,692.50
117,664.71
14-16
85
5.400
RESOLUTION NO. 2008-137
A RESOLUTION OF THE LODI CITY COUNCIL
AWARDING THE BIDS FOR THE PURCHASE OF
PADMOUNT TRANSFORMERS
WHEREAS, in answer to notice duly published in accordance with law and the order of
this City Council, sealed bids were received and publicly opened on June 11, 2008, at
11:00 a.m. for the purchase of polemount transformers for the Electric Utility Department,
described in the specifications therefore approved by the City Council on March 19, 2008; and
WHEREAS, said bids have been compared, checked, and tabulated and a report
thereof filed with the City Manager as shown on Exhibit attached; and
WHEREAS, the City Manager recommends the award cf the bids for the various types
and ratings of polemount transformers for the Electric Utility Department be made to the
bidder(s) whose proposal and equipment meet City of Lodi specifications and whose
transformers are expected to yield the lowest overall life -cycle costs, listed as follows:
7 each 37.5kVA, 1 -Phase
GEXPRO
$
12,973.10
8 each 50kVA, I -Phase
GEXPRO
$
16,248.70
6 each 75kVA, I -Phase
GEXPRO
$
14,410.49
1 each 75kVA, 3 -Phase
Pauwels Transformers
$
5,294.84
1 each 225kVA, 3 -Phase
Pauwels Transformers
$
8,541.34
1 each 500kVA, 3 -Phase, 208Y
Pauwels Transformers
$
14,422.34
2 each 500kVA, 3 -Phase, 480Y
Pauwels Transformers
$
25,752.25
2 each 1500kVA, 3 -Phase
HEES Enterprises, Inc.
$
51.265.30
NOW, THEREFORE, BE IT RESOLVED that the award of the bids for the purchase of
polemount transformers for the Electric Utility Department be and the same is hereby awarded
to the lowest responsible bidders, as shown above, in the total amount of $148,908.36.
Dated: July 16, 2008
hereby certify that Resolution No. 2008-137 was passed and adopted by the City
Council of the City of Lodi in a regular meeting held July 16, 2008, by the following vote:
AYES: COUNCIL MEMBERS— Hansen, Hitchcock, Johnson, Katzakian, and
Mayor Mounce
NOES: COUNCIL MEMBERS— None
ABSENT: COUNCIL MEMBERS— None
ABSTAIN: COUNCIL MEMBERS—Non
E�)7_
VANDI JOHL
City Clerk
2008-137
EXHIBITA: Bid Evaluation Summary
Transformer Bid Evaluation BidOpening:June 11, 2008
Padmount _ Tax (factor): 1.0775 _ PrimaryWindings: T r?--PJsase,_12000Volt.60Hz, Delta Connected,,
No Load Loss $/waFt: € 3 75 Single -Phase 12000 Grd Wye V330 Volt, 6014x
.d
June 11 2008 Laad Loss $lwattT 1.25
Bid Item 1: 37.5 kVA, 2401120 Volt, Single Phase Pad
Unit
Extended
Price
No Load
_........................_........................................
Number of units:......................7
......
Load
Cost of
Life Cycle
28
F
>1.51
Vendor
_pi �'
_. _
EztenrTed
rice
No Load- I
Load
N3 Loal _ -
Load
Cost of
Life C cie
y
, Delive r
.. Height
Impedance E
_.- • .
Prue
_- rice
w/tax
s)€Loss (watts)i
Loss (v+aEt_�- __.. _..-._.
Loss value s
d_ �0._s value .
es 9
Losses �.__.
Cost 5
_ .
[weeks)..
weeks ..
[inches)
°fo
Hees
nc.
II
2,639 M
73.001
8,940 00
t _._
8
� � �
2267.59�
4,121.25'
HD Supply Utilities Ltd.
2,035.00:
-�
2264,
28
�
�
Howard Industries
5,690.00
14 660 00�
15,688.40
90�
458p
2,36150 50
4,007.50
6,370 00'
65
22,058.40.
.74
6 8
1.90
HD Supply Utilities Ltd.
pp Y
1,841.M
12,887.00;
13,685.74
94112,362.16,
434;
2,467.50
3,797.0
6,471
00:
20,150fiji
8-110
1.500,E
GEXPRO
1,720,00
12,04D:D0
12.973.10
70
448
1.837.50
3.920.00
5.757.50
18.730.60
8-10
6,310.00
1.820 E
PANNELS Transformers
MoEon Electric Ince_
NO BID
2519 Q0
17633.00.{_
_18,999.5fi;
106.
442.
_ 2 835.IH1
3867.50
6,702.50
25,702AS,
10 12
25
1.70Q,..
_ .... - __ ......
Bid Item 2: 50 kVA, 2401120 Volt Single Phase Pad
......... ..... ......... ......-
Number of units:: 8 28; >1
Vendor
Unit
Extended
Price
No Load
Load No Load t
Load
Cost of
Life Cycle
Delimy
Height
Impedance
_ Price $
Price $
wRax $
Loss (watts)±Loss (walls) Lossvalue i
Loss value
Losses $
Cost $
(weeks)
(inches)
/o
Hess Enterprises. Inc.
1 56 Od .-.14.848 0t] - 15 987..,_....... 1 Dd
__ „ 8_ __ _
574, . _ si29 139
_564
5740._ p0
8 86001
2d5$.7F 9 -E
26
2.200
Howard Industries Inc.
2.345 00
18 760 00
20,213 90�
__ 1.1
— 3,300 00;
E,640.1�0
8,940 00
t _._
29,153 90
_m
HD Supply Utilities Ltd.
2,035.00:
16,280.00'
17,541.70
mm
1131
5691 3,390.00
5,690.00
9,000.00`
26,621.70
8-10
24
1,6001E
GEXPRO
1.885.C6
15,090:00
16,248.70
86
585 2,580A0
5,850.00
6,430.00
24,678.70
8-10
1.940 E
PAUWELS Transformers
NO BID
Moloney Electric.lnc,
2,700 00
21 600 00g
23,274.00:
117:
F
531 3,510.00!
6,310.00
9,820.00;
33,094.00
10 12;
25
2.200
_
......... _
Bid Item 3. 75 kVA, 2401120 Volt, Single Phase Pad,
Numberof units
6
28
>1 8,
Vendor
Unit
Extended
Price
No Load
Load
No Load mm
Load
Cost of
Life Cycle
Delivery
Height
Impedance
Price $
Price $
w/tax $ Losswatts
( ) Loss (wafts) Loss value
Loss value
Lasses $
Cost $
(weeks)
(inches)
Hees Enterpnses, Inc
2,303 m
13,81800
14,888.90
172
683
3,87000
5,12250
8,992.50
23,881.40
6-B
26
2100 E
Howard Industries, Inc
3,02400
18.144 00
19,550.16
155
696
3,48750
5,22000
8,70750
28,257.66
6-8
28
1.900
HD Supply Utilities Ltd
2.500 0'D
15,000 00
16,162.50
160
663
3 600 00
4,972 50
8,572 50
24,735.00
8 10
24
1.600, E
GEXPRO
2.22900
13,374 00
14,410.49
144
945
2,34000
7,09500
9,43500
23,845.49
8-10
2 160 E
PAUWELS Transformers
NO 8101
Moloney Electnc. Inc
3.133 UO
18,798,00:
20,254.85
_152;
896
3,420 00i
6 720, 00
10,140.00
30,394.85
10.12',
25
Bid Item 4: 75 kVA, 480Y,277 Volt, Three Phase Pad
Number of units:
1
65
>2 0
Vendor
Unit
Extended
Price
No Load
Load
No Load i
Load
Cost of
Life Cycle
Delivery
Height
Impedance
Price $
Price $
wltax $
3
Loss (watts) Loss
(walls) Lossvalue
Loss value
Losses$
Cost $
(weeks)
(inches)
%
;Hees Enterprises, Inc.
5,7
5,757.00
6 203.17'
161
1099
603.75E
1,373.75:
1750
8,180.67
10-12
49
2.200
'Howard Industries, Inc.
HD Su I Utilities Ltd.
5 985 00,
6 217.03
5,985.00'
6 17.00
6,448.84
6 698.82
184
_ 212
1032
800 ,
690.00 _1,290.00
795.00 1,ODD.IX1 �
1,960 00
1,795 OQ
8,428.84
.._8
&10
7-9;
44
50
2.500
_. 3.55(1 E
!GEXPRO
6,359.0D,
6359.00,
6,851 82.
230,
810
-�
862.50;
_
1,012.50,
1,875
8,726 82
10-12.4.030
E
iPAUWELS Transformers
4,914,00
4,914.M:
5,M.94
247
990
92625
1 ?-W.50
2,163.75
7,45859
14-16
52
2.150
!Moloney Electric Inc
.... _.. 1031600,
10,316.001
- -
11,115.49<
-
289[
789
-
1,083,751
986.25y
2,070.00[
13,185.49:
12-14
63
2.9100-
_
... . - _
- _ _
_
I_
_
t
......
- - r
...... -
i
Bid Item 5. 235 kVA, 480Y/2Tf Volt, Three Phase Pad,
.. ... _ _.. _ - _,
..
T.... ��
�.......�
Number of
� Numberunits:
W 1
.....
. ...
6S
Vendor
Unit
_Extended
Price
No Load
Load
No Load
Load
Cost of
Life Cycle
Delivery
Height
Impedance,
Price 5 -
Price $
wltax $
Loss( Its)[Loss (watts)
Lossvalue
Loss value
Losses $
Cost $
(weeks)
(Inches)
%
Hees Enterprises, Inc. -
8,623 00
8,623.001
9,291.28
271
3424
1,016.25;
4,28000
5,296.25
14,587.53
10.12
57
3.5001
Howard Industries, Inc
9,39800
9,398 00
10,126.35
4339?
2223
1,64625
2,77875
4,4250)
14,551.35
B-10
51
4.900;
HD Supply Utilities Ltd
8.79000
8,79000
9,471.23
480
1681
1,800 001
2,10125
3,90125,
13,372.48
7-9
50
4020 E
GEXPRO
9,04900
9,04900
9,750.30
448'
2,350
1,68000
2,93750
4,61750
14,367.80
10-12
5590 E
PAUWELS Transformers
7,92700
7,92700
8,541.34
416
2433
1,56000
3,04125
4,60125
13,142.59
14-16
52
3710
Moloney Electnc, Inc
13,126 00
13.12600'
14,143.27
5731
2059
2,148 75;
2,57375
4,72250
18,865.77
12-14
53
3.900'
I.... .........i
E
It
i
.,. ... '.
Bid Item 6 500 kVA, 208Yf120 Volt, Three Phase„Pad,
Number of units.
1
...
75
>4.01
VendorUnit
Extended
Price
No Load
Load ' Na Load
Load
Cast of
lafe Gycle
Polnery
Height
Impedance
Price $
Price S
wltax $
_. ..._._ _._
Loss watEs Loss watts Lass value
.
Loss value
Losses S
Cost S
eeks
inches),°k
Hees Enterprises, Inc
13,89300
13,89300
14,969.71
402`
7661 1,50750
9,57625
11,083 75
26,053.46
10-12
49
4.400
Howard Industries, Inc
16,33100
16,331 00
17,596.65
858
3867 3,21750
4.83375
8,05125
25,647.90
B-10
65
4500'
HD Suppiy Utilities Ltd
14,316.00
14,31600
15,425.49
864
4049 3,24000
5.061 25
8,30125
23,726.74
7-9
50
4.9701E
GEXPRO
14,8700U
14,87000
16,022.43
B86
3781 3,32250
4,72625
804875
24,071.18
10-12
4470 E
PAUWELS Transformers
13.38500
13.38500
14,422..34
818
4713 306750
5891.25
8.95875
23,381.09
14-16
58
4350
'Malo Electric, Inc.
18,392 00;
18,392.[10;
19,817.38
1023]
3846; 3936 25
d,W7.50
8,643.75
28,461 1-3
12-14
63•
............
4,300'
Bid Item 7. 500 kVA, 480Y/277 Volt, Three Phase Pad
Numberof units 2
75 >4 0
Vendor Unit Extended Price No Load Load No Load Load Cost of Life Cycle Delivery Height Impedance
Price $ Pnce $ Whax $ Loss (mraUs)jLoss (watts) Lass value Loss value Losses $ Cost $ (weeks) (inches) %
Hees Ente rises, Inc. - - -�� 13,530,0 J7 060.003 29,157 15 396! 71261 23 17,815.00, 20,785.W 49,94215 10-12 49 , 4.5001
Howard Industries Inc 14,683.00 29,-1,66.00 31,641 87 88 3648 6.435.001 9,120.00 15 555 M 47,196.87 6 8 63 4,800
..
HID S1111U GEXPRO Utilities Ltd. 14.888 00. 29,7�76.� _ L2,003.64-,_885 3366, 6 487.50 8,415.00 14,902 50 46,986.14 7-9 50' 4.320 E
31,128SO' B6B 3382 `. 6,510.00 8,455.00, 14,965 00� 46,093 98 1012 4.420 E
PAUWELS Transformers 11,950.00 23,900.00 25,752.25 791 4947 5,932.50 12,367.50 18,300.00 44,052.25 14-16 58 4.290
'Moloney Electric, Inc. 18,240.00 36,480.00( 39,307.20; 1056; 3470e 7,920.001 8,675.00 16,595.001 55,902.20 12.14 63 4.5001
..
.. .
Pad Number of unEts:' 2 —
' .........25.31
Bid Item B: 1500 kVA, dBAlfilT7 Volt, Three Phase .. .... _.... . _. M _ ...._..._.. _.._ ..m....... _ _
........................................................................... .. ....... .....
Vendor Unit Extended ? Price No Load Load No L . .
Pnce $ _ Price $ witax $ Loss (watts)lLoss (watts) Loss value Loss value Losses $ Cost $ (weeks) (inches) °f°
;Hees Enterprises, Inc. 23,789.00 4757E3.;(1p SI,Zb5r30 1$'27 9.782 19,702.50 24,465.00 38,157.50 89,422.80 10.12 63 5.800
'Howard Industries, Inc. _ 27,741 001 55,482.00 59,781.86, 1551 11604 11,632.50] 29 010.00 40,642.50; 100,424.36` 8-10 71 6.100
—..
...
HD Supply Utilities Ltd. x,990 W 57_gW.00 62,473.45 1$66(__ 9711 113 995 00' 24 W277.60 38 272.W 100,743 95 10.12 72 _ 5.710 E
PAUWELS Transformers 24,283 W 46 566.00 �52 329.87 1686 12676; 12,660.00 . 31,690.06 44 350 W� g6i�679.47 10 12 5.780 E
GEXPRO _ _ 33,5817 00 67,16€3.00 72,364.90` 1,950 9,297= 14,625 WI 23 242, 37867 50 110 232.4
7 1416 72 5.750
Aoloney Electric Inc 36,182.00: 72,364.00 77,972 21, 2151 9424: 16,132.% 29 560.00 39,692.50 117 66d 71 14.16 850 5,400
_...._.. -- _ _ _�_... -_ _. _ _......... ._. . . _ ._.._ _..
- �-
... . . . . . . . ....... € ...... ...... ..... ......
.........