HomeMy WebLinkAboutAgenda Report - January 7, 2009 K-03AGENDA ITEM KmO3
CITY OF LODI
NW COUNCIL COMMUNICATION
M
AGENDATITLE: Adopt Resolution Authorizing City Managerto Execute Contract Amendment for
DeBenedetti Park Rough Grading Contract with A.M. Stephens Construction
Company, Inc., of Lodi. and Appropriating Additional Funds ($180,000)
MEETING DATE: January7,2009
PREPARED BY: Public Works Director
RECOMMENDED ACTION: Adopt a resolution authorizing the City Manager to execute a
contract amendmentfor the DeBenedetti Park Rough Grading
contract with A.M. Stephens Construction Company, Inc., of Lodi in
the amount of $163,000 and appropriating additional funds from the
Storm Drainage and Parks and Recreation Impact. Fee Funds as shown below to complete the drainage
basin portion of this park project.
BACKGROUND INFORMATION: The contract for the DeBenedetti Park/Basin G Rough Grading was
awarded to A.M. Stephens Construction Company, Inc., at the
December 17, 2003 Council meeting. This project consisted of the
excavation, rough grading and export of material from the
DeBenedetti Park site and also included site fencing, mowstrips, rip -rap and other drainage related work.
The original contract completion date was October 31, 2006. A.M. Stephens Construction Company
requested additional time to complete the excavation and grading of the park, and their contract
completion date was extended to December 31,2008.
Plans to modify the original grading design were presented at a November 6, 2008 meeting of the Parks
and Recreation Commission, and at a City Council shirtsleeve session on December 16, 2008. The
modification increases the main storm drainage basin area by 3.3 acres while making it shallower. This
new plan, which reduces future high -ground park area by the same amount, is presented in ExhibitA.
Decreasing the basin depth from 30 feet to 20 feet will result in a reduction in pump station construction
costs by an estimated $300,000 and will reduce annual operation and maintenance costs. The basin,
which will be used only for drainage purposes, has been fully excavated and requires regrading to raise
the elevation 10 feet.
Approving the contract amendment will allow the City to proceed with installation of turf and irrigation
systems in the park's northwest corner, shown as "Initial Phase" in ExhibitA, in Fall 2009. This will begin
the incremental development of the park. Although this area will serve as an overflow area for the storm
drainage basin, it will provide a playable surface year-round except in those occasional years with severe
winter storms. At a future date, a revised park conceptual plan will be presented to the City Council for
approval.
To accomplish these changes, staff recommends that A. M. Stephens Construction Company receives
an eight-month extension on the contract to complete the modified grading plan. The contract
amendment (Exhibit B) would require A.M. Stephens Construction Company to remove approximately
APPROVED: --1
Blair ' ity Manager
K:SW"ROJECTSIPARKS1DeBenedetti(G-Basin)1CC_contract extensionZdoc
Adopt Resolution Authorizing City Manager to Execute Contract Amendment for DeBenedetti Park
Rough Grading Contractwith A.M. Stephens Construction Company, Inc., of Lodi, and Appropriating
Additional Funds ($180,000)
January 7,2009
Page 2
57,000 cubic yards of dirt from the 3.3 acre high -ground area and place it in the bottom of the existing
basin, thereby decreasing the depth of the basin by 10 feet. Included in the City's compensation to A.M.
Stephens Construction Company are added costs for weed and dust control.
Because the use of the total acreage is split evenly between parks and storm drainage purposes, staff is
requesting the expense of regrading and additional staff time be equally divided between the Storm Drain
and Park and Recreation Impact Mitigation Fees.
FISCAL IMPACT: Upfront cost of $180,000 from impactfee program, estimated $300,000
savings in construction costs for pump station, annual savings from
reduced pump station operation and maintenance. Increased park
maintenance costs following Initial Phase improvements.
FUNDING AVAILABLE: Parks and Recreation Impact Mitigation Fee Fund (1217) $90,000
Storm Drain Impact Mitigation Fee Fund (326017) $90,000
vans, Budget Manager
James M. Rodems
Interim Parks and Recreation Director
Prepared by Wesley K. Fujitani, Senior Civil Engineer
FWSIWKFIpmf
Attachments: ExhibitsA and B
K:1WPIPROJECTStiPARKSD@Benedetti(G-Basin)ICC_contract extensionZdoc
za&
F. Wally Sang lin
Public Works Director
No ZISIHXa
N2IVd I,L,LUQENUgUQ
ti TId€iQuvIi ;s' TIVR(INVH
I
I • f �
l; f .lams sow�'co
VgNv QIZk102I;) HrJIH'( f }
1'.
1 I II !
• 'III
' � I
;r I
r
I
_--
_, r
I
-
virol
a0Y11741
\ 1
,
---'V 06 ZI
L3Sti 4295
I
I
ti TId€iQuvIi ;s' TIVR(INVH
I
I • f �
l; f .lams sow�'co
VgNv QIZk102I;) HrJIH'( f }
1'.
1 I II !
• 'III
' � I
;r I
r
I
_--
_, r
I
-
virol
a0Y11741
\ 1
,
CITY OF LODI
PUBLIC WORKS DEPARTMENT
PROJECT: DeBenedetti Park/Basin G Rough Grading
CONTRACTOR: A.M. Stephens Construction
Exhibit
CONTRACT CHANGE ORDER NO.4
Sheet 1 of 1
Date: December 23, 2008
Account No. 326017
You are directed to make the following changes or do the following work not included in the
Plans and Specifications on this contract.
......................................................................
Description of work to be done, estimate of quantities, and prices to be paid. Unless otherwise
stated, rates for rental of equipment cover only such time as equipment is actually used and no
allowance will be made for idle time.
1. Regrade deep basin area to raise bottom approximately 10 feet.
Agreed Upon Price not to exceed $180,000
PERCENT OF
CONTRACT
Original Contract Price $ 266,678.00
Total Cost of This Change Order NOT TO EXCEED $ 180,000.00 67.5%
Previous Change Orders $ 38,984.50) (I4.6%)
Total Cost of All Change Orders to Date 141,015.50 52.9%
Contract Price, Including All Change Orders, Will Be: $407,693.50
Time of completion will be adjusted as follows: New completion date shall be October 1, 2009
Submitted By Date
Approval Recommended Date
Approved, Public Works Director Date
Approved, City Manager (Per Public Works Policies and Procedures, Administration 4. 1)
Date
The undersigned contractor, having carefully considered the change proposed, agrees, if this
proposal is approved, to provide all equipment, furnish all materials, except as otherwise noted
above, perform all services necessary for the work above specified, and accept as full payment
the prices shown above.
ACCEPTED: Date
:A
Contractor
Title
If the contractor does not sign acceptance of this order, the contractor should refer to Section 4-
1.03A of the Standard Specifications regarding filing a written protest within the specified time.
CC04.doc
RESOLUTION N . 2 -
O 009 44?*44ttr
A RESOLUTION OF THE LODI CITY COUNCIL AUTHORIZING
THE CITY MANAGER TO AMEND CONTRACT WITH
A.M. STEPHENS CONSTRUCTION, INC., FOR THE
DEBENEDETTI PARK/BASIN G ROUGH GRADING,
AND FURTHER APPROPRIATING FUNDS
WHEREAS, City Council awarded the contract for the DeBenedetti Park/Basin
G Rough Grading to A.M. Stephens Construction Company, Inc., on December 17,
2003. The project consisted of the excavation, rough grading, and export of material
from the DeBenedetti Park site and also included site fencing, mowstrips, rip -rap, and
other drainage related work; and
WHEREAS, the original contract completion date was October 31, 2006.
A.M. Stephens Construction Company requested additional time to complete the
excavation and grading of the park, and the contract completion date was extended to
December 31,2008: and
WHEREAS, the Parks and Recreation Commission, at its meeting on November
6, 2008, approved a modified design of DeBenedetti Park, which would decrease the
size of the park area by 3.3 acres and increase the storm drainage basin area by
3.3 acres: and
WHEREAS, the modification will result in a reduction in pump station
construction costs by an estimated $300,000 and will reduce operation and maintenance
costs. The cost savings result from the decreased depth of the basin from 30 feet to 20
feet, but the basin has been fully excavated and soil will need to be replaced to raise the
floor elevation by 10 feet; and
WHEREAS, staff recommends that A. M. Stephens Construction Company
receive an eight-month extension on the contract to complete the modified grading plan.
The contract would allow A.M. Stephens Construction Company to remove
approximately 57,000 cubic yards of dirt from the 3.3 acre high ground and place it in the
bottom of the existing basin, thereby decreasing the depth of the basin by 10 feet.
Included in the City's compensation to A. M. Stephens Construction Company are added
costs for weed and dust control; and
WHEREAS, approval by the City Council of the contract amendment will remove
3.3 acres from the original park conceptual development plan. At a future date, a
revised park conceptual plan will be presented to the City Council for approval. As a
result of the shift in acres from park use to storm drainage basin, the overall project
development cost split will change (park vs. storm drainage) and transfers between the
impact fee accounts will be made to reconcile past expense to the new cost split.
NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council does hereby
approve the DeBenedetti Park modified design; and
BE IT FURTHER RESOLVED that the Lodi City Council does hereby authorize
the City Manager to amend the contract with A. M. Stephens Construction Company,
Inc., of Lodi, California, for the DeBenedetti Park/Basin G Rough Grading to an eight-
month contract extension for the purpose of regrading the storm drain basin area of the
park; and
BE IT FURTHER RESOLVED that funds in the amount of $180,000 be
appropriated from the Parks and Recreation Impact Mitigation Fee Fund ($90,000) and
the Storm Drain Impact Mitigation Fee Fund ($90,000)for the project.
Dated: January7,2009
I hereby certify that Resolution No. 2009- was passed and adopted by the
City Council of the City of Lodi in a regular meeting held January 7, 2009, by the
following vote:
AYES: COUNCIL MEMBERS -
NOES: COUNCIL MEMBERS -
ABSENT: COUNCIL MEMBERS -
ABSTAIN: COUNCIL MEMBERS -
RANDI JOHL
City Clerk
ref•