HomeMy WebLinkAboutAgenda Report - November 21, 2007 E-19AGENDA ITEM E-19
• CITY OF LODE
%W COUNCIL COMMUNICATION
TM
AGENDA TITLE: Adopt Resolutions Approving the Existing Building Code Fees, Schedule 1A, along
with the Existing Fees for Building, Mechanical, Plumbing, and Electrical Permits.
MEETING DATE: November21,2007
PREPARED BY: Community Development Department
RECOMMENDED ACTION: Adopt Resolutions Approving the Existing Building Code Fees,
Schedule 1A, along with the Existing Fees for Building, Mechanical,
Plumbing, and Electrical Permits.
BACKGROUND INFORMATION: The City Council at its meeting of November 7, 2007 took the first
step in adopting the Ordinances for the new Building Codes Pursuant to Health and Safety Code Section
18938. The second reading for those Ordinances is being held tonight.
In fiscal year 2005-2006 the Community Development Department became a special revenue fund. The
goal of the Community Development Department is to achieve a self sustaining fund. We are proposing
to keep our current fee Table 1A (Exhibit A) which was adopted as part of the old Code Ordinances.
With the adoption of the new Code Ordinances, the existing fee Table becomes void and needs to be re-
adopted. In our new Ordinances we reference the Fees as being adopted by Resolutions. This process
is only to formally adopt the fee schedule that we are currently using. We are not proposing to raise fees
at this time.
City Staff with the possible help of a consultant will be conducting a comprehensive analysis of staff time
and City costs relative to the provision of City Building Services which are to be funded by the building
fees. The comprehensive analysis will be used as the basis for determining whether the current fees are
sufficient to achieve full funding levels.
City Staff met with BIA and other representatives within the Building Industry on November 8, 2007 to
discuss the process of reviewing fees. City Staff will continue communications with the Building Industry
Association (BIA) group during the proposed fee study.
Therefore, it is recommended that the Council Adopt Resolutions Approving the existing Building Code
Fees, Schedule 1A, along with the existing Fees for Building, Mechanical, Plumbing, and Electrical
Permits, at the Current Fee Levels.
FISCAL IMPACT: N/A
FUNDING AVAILABLE: N/A
Randy Wtch, Community Development Director
DCNPIkjc
Attachments:
t. Building Permit Fees Table 1A
APPROVED: �'
Blair King, City Manager
•
BUILDING FEES COLLECTED AT PERMIT ISSUANCE EXHIBIT A
CITY OF LODI, COMMUNITY DEVELOPMENT DEPARTMENT, 221 W. PINE ST., LODI, CA 95240
PHONE: (209) 333-6714 FAx: (209) 333-6842
Building Permit Fee
Table lA (below)
Building Plan Check Fee
65% of building permit fee Table lA
Plumbing
Table 1-1 (page 3)
Electrical
Table 3-A (page 4)
Mechanical
Table 1-A (page 6)
Disabled Access
5% of building permit fee
Energy
5% residential and 10% non-residential
Plan Maintenance
5% of building permit fee (non-residential only.)
Strong Motion Inst. Fee
Valuation x 0.0001
Fire Inspection
25% of building permit fee
Fire Plan Check
25% of building plan check
Zoning Plan Check Fee
$350 Commercial/ Industrial
$100 Residential
$50 Additions/ Accessories
S.J. Co. Facilities Fee
$1,400 per SFD
$1,200 per Multi -Family Dwelling
$0.32 per Sq. Ft. Retail Commercial
$0.28 per Sq. Ft. Office Commercial
$0.16 per Sq. Ft. Industrial
S.J. Multi -Species
Based on Location:
Conservation Program Fees
$0Category A/No Pay Zone (Gen. Estab. City)
$909Category B/Pay Zone A (Large undeveloped)
$1,812Category C & D/Pay Zone B & C (Ag./Natural)
Building-Fees.doc
BUILDING PERMIT FEES
TABLE NO. 1-A
TOTAL VALUATION
FEES
$1.00 to $500
$50.00
$501 to $2,000
$50.00 for the first $500 plus $1.30 each additional $100 or fraction
thereof, to and including $2,000.
$2,001 to $25,000
$69.50 for the first $2,000 plus $14.00 for each additional thousand or
fraction thereof to and including $25,000.
$25,001 to $50,000
$391.50 for the first $25,000 plus $10.10 for each additional thousand, or
fraction thereof, to and including $50,000.
Building-Fees.doc
EXHIBIT A
$50,001 to $100,000
$644.00 for the first $50,000 plus $7.00 for each additional thousand, or
fraction thereof, to and including $100,000.
$100,001 to 500,000
$994.00 for the first $100,000 plus $5.60 for each additional thousand, or
fraction thereof.
$500,000 to
$3,234.00 for the first $500,000 plus $4.75 for each additional $1,000.00,
$1,000,000
or fraction thereof, to and including $1,000,000.
$1,000,001 and up
$5,609.00 for the first $1,000,000 plus $3.15 for each additional
thousand or fraction thereof.
OTHER INSPECTION FEES AND REFUNDS:
1. Inspections outside of normal business
$65.00 per hr.
hours (Minimum charge - 3 hours)
2. Reinspection fee assessed under provision
$50.00 each
of Section 108.8
3. Inspection for which no fee is specifically
$50.00 per hr.
indicated
4. Additional plan review required by changes,
additions or revisions to approved plans.
(Minimum charge - one half hour)
$65.00 per hr.
5. Special inspections required by owners, real
estate agencies, or loan agencies to
determine compliance to the Building Code
in effect at the time of construction: First
hour
$80.00
Each additional hour
$34.00
6. Refunds on all permits shall be subject to
$35.00
an administrative processing fee
7. Board of Appeals Fee
$250.00
8. Demolition Permit
$60.00
9. Manufactured Home, Commercial Coach
The fee shall be one-half (1 / 2) of the valuation set
out in Table No. 1-A.
10. Maintenance of Building Plans
Fees to comply with Section 19850, Part 7 of the
Health and Safety Code of the State of California.
All new non-residential building plans, except
agricultural buildings: Five percent (5%) of the
building permit fee.
11. Disabled Access Surcharge
Multi -family residential disabled access surcharge
shall be five percent (5%) of the building permit
fee. Commercial disabled access surcharge shall
be five percent (5%) of the building permit fee.
12. Energy Compliance Surcharge
Residential energy compliance surcharge shall be
five percent (5%) of the building permit fee.
Commercial energy compliance surcharge shall be
ten percent (10%) of the building permit fee.
IL; ing-Fees.doc 2
EXHIHII
13. Plan Checking Fees The plan checking fees for all buildings shall be
sixty-five percent (65%) of the building permit fee,
as set forth in this schedule.
Building-Fees.doc
PLUMBING PERMIT FEES
TABLE NO. 1-1
For issuing each permit
$ 30.00
In addition:
1.
For each plumbing fixture or trap or set of fixtures on one trap
(including water, drainage piping and backflow protection therefore)
$ 5.00
2.
For each building sewer
$10.00
3.
Solar heaters
$15.00
4.
Rainwater systems -per drain
$ 5.00
5.
For each fire hydrant (first one)
$170.00
(each additional)
$ 45.00
6.
For each private sewage disposal system
$25.00
7.
For each heater and/or vent
$ 5.00
8.
For each gas piping system of one (1) to five (5) outlets
$ 7.00
9.
For each gas piping system of six (6) or more, per outlet
$ 2.00
10.
For each industrial waste pre-treatment interceptor, including its trap
and vent, excepting kitchen -type grease interceptors functioning as
fixtures traps
$30.00
11.
For installation, alteration or repair of water piping and/or water
treating equipment
$ 7.00
12.
For repair or alteration of drainage or vent piping
$ 7.00
13.
For each lawn sprinkler system on any one meter, including backflow
protection devices therefore
$ 7.00
14. For vacuum breakers or backflow protective devices on tanks, vats, etc.
or floor installation on plumbing fixtures including necessary water
piping:
One (1) to five (5)
$ 7.00
Over five (5), each
$ 1.50
15.
Gasoline storage tanks
$30.00
16.
For new single or multi -family building, the following flat rate shall apply
$ 0.045 per SF
17.
Fire sprinkler systems shall be based on value charged according to the
fee schedule of Section 15.04.030 of the Code of the City of Lodi
Building-Fees.doc
1L.uilding-Fees.doc 4
EXHIBIT A
19.
18.
Gas piping pressure test (PG&E)
OTHER INSPECTION FEES AND REFUNDS:
For issuing permits, a fee shall be paid for issuing each permit in addition to all
1.
Inspections outside of normal business hours (Minimum charge -3 hours)
$ 65.00 per hr
2.
Reinspection fee
$ 50.00 each
3.
Inspections for which no fee is specifically indicated
$ 50.00 per hr
4.
Additional plan review required by the Building Official (Minimum
charge -one-half hour)
$50.00 per hr
5.
Refunds on all permits shall be subject to a $35.00 administrative
processing fee.
For each five feet or fraction thereof multi -outlet assembly
5.
For electric discharge lighting fixtures
$2.00
6.
Mercury vapor lamps and equipment
7.
Heaters
$4.00
8.
X-ray machines
9.
Swimming pools
X30.00
10.
Electric ranges, range top and ovens, clothes dryers, water heaters
11.
For fixed motors, transformers, welder, rectifier, air conditioners and other
miscellaneous equipment or appliances shall be that given in the following
table for the rating thereof;
Up to and including 1 hp
$5.00
Over 1 and not over 5
$7.00
Over 5 and not over 20
$10.00
Over 20 and not over 50
$15.00
Over 50 and not over 100
$20.00
Over 100 -Each motor per hp
$0.20
1L.uilding-Fees.doc 4
$15.00
19.
Swimming pools
$20.00
OTHER INSPECTION FEES AND REFUNDS:
For issuing permits, a fee shall be paid for issuing each permit in addition to all
1.
Inspections outside of normal business hours (Minimum charge -3 hours)
$ 65.00 per hr
2.
Reinspection fee
$ 50.00 each
3.
Inspections for which no fee is specifically indicated
$ 50.00 per hr
4.
Additional plan review required by the Building Official (Minimum
charge -one-half hour)
$50.00 per hr
5.
Refunds on all permits shall be subject to a $35.00 administrative
processing fee.
For each five feet or fraction thereof multi -outlet assembly
1L.uilding-Fees.doc 4
ELECTRICAL PERMIT FEES
TABLE NO. 3-A
1.
For issuing permits, a fee shall be paid for issuing each permit in addition to all
other charges specified in this section
$20.00
2.
For wiring outlets at which current is used or controlled
$1.00
3.
For fixtures, sockets, or other lamp holding devices less than eighteen inches
apart
$ 1.00
4.
For each five feet or fraction thereof multi -outlet assembly
5.
For electric discharge lighting fixtures
$2.00
6.
Mercury vapor lamps and equipment
7.
Heaters
$4.00
8.
X-ray machines
9.
Swimming pools
X30.00
10.
Electric ranges, range top and ovens, clothes dryers, water heaters
11.
For fixed motors, transformers, welder, rectifier, air conditioners and other
miscellaneous equipment or appliances shall be that given in the following
table for the rating thereof;
Up to and including 1 hp
$5.00
Over 1 and not over 5
$7.00
Over 5 and not over 20
$10.00
Over 20 and not over 50
$15.00
Over 50 and not over 100
$20.00
Over 100 -Each motor per hp
$0.20
12. For any equipment or appliance containing more than one motor or other current consuming
components in addition to the motor or motors, the combined electrical ratings, converted to KVA of all
shall be used to determine the fee; for the purposed of this subsection one H.P. or one KW is equivalent
to one KVA.
13. The fees for a change of location or replacement of equipment on the same premises shall be the
same as that for a new installation. However, no fees shall be required for moving any temporary
construction motor from one place to another on the same site during the time of actual construction
work after a permit has once been obtained.
14. For switchboards the fees for installing, changing, replacing, relocating, or
reinstalling a switchboard, or for additions to an existing switchboard shall be
as follows:
a) 600 volts and less
First switchboard section
$20.00
Each additional section
$10.00
b) Over 600 volts
$30.00
Each additional section
$15.00
15. For distribution panels the fee for each distribution panel, panelboard, or
motor control panel that is installed, changed, replaced, relocated or
reinstalled
$10.00
16. For service installations, the installation of each set of service conductors and
equipment, including changing, replacing or relocating existing service
equipment, the fees shall be as shown in the following table:
Type of Service Under 600 Volts (Including One Meter)
0 to 100 Amperes
$10.00
101 to 200 Amperes
$20.00
201 to 500 Amperes
$30.00
501 to 1200 Amperes
$40.00
Over 1200 Amperes
$75.00
All services over 600 volts
$75.00
For each additional meter
$2.00
17. For single -family dwelling on new construction work, the following flat rate
shall apply to service panels, all outlets, range, dryer, and other
miscellaneous circuits
$0.035 per SF
18. For multi-family building on new construction work, the following flat rate
shall apply to subpanels, all outlets, range, dryer, and any other
miscellaneous circuits
$0.035 per SF
19. Signs
$15.00 each
20. Inspections of damaged service
$20.00
No permit shall be issued to any person unless all fees due are paid in full.
OTHER INSPECTION FEES AND REFUNDS
1. Inspections outside of normal business hours (Minimum charge-3 hours) $45.00 per hour
2. Reinspection fee
$35.00 each
Building-Fees.doc
3. Inspections for which no fee is specifically indicated $34.00 per hour
4. Additional plan review required by changes, additions or revisions to
approved plans (Minimum charge -one-half hour) $34.00 per hour
5. Refunds on all permits shall be subject to a $35.00 administrative processing
fee.
Building-Fees.doc
R
MECHANICAL PERMIT FEES
TABLE NO. 1-A
1.
For the issuance of each permit
$30.00
2.
For the installation or relocation of each forced -air or gravity -type furnace or
burner, including ducts and vents attached to such appliance, up to and
including 100,000 BTUs
$15.00
3.
For the installation or relocation of each forced -air or gravity -type furnace or
burner, including ducts and vents attached to such appliance, over 100,000
BTU's to and including 500,000 BTUs
$20.00
4.
For the installation or relocation of each forced -air or gravity -type furnace or
burner, including ducts and vents attached to such appliance, over 500,000
BTU's
$25.00
5.
For the installation or relocation of each floor furnace, including vent
$15.00
6.
For the installation of relocation of each suspended heater, recessed wall
heater or floor -mounted unit heater
$15.00
7.
For the installation, relocation or replacement of each appliance vent installed
and not included in an appliance permit
$10.00
8. For the repair of, alteration of, or addition to each heating appliance,
refrigeration unit, cooling unit, absorption unit, or each heating, cooling,
absorption, or evaporative cooling system, including installation of controls
regulated by this code
$15.00
9.
For the installation or relocation of each boiler or compressor to and
including three horsepower, or each absorption system to and including
100,000 BTU's
$15.00
10.
For the installation or relocation of each boiler or compressor over three
horsepower to and including 15 horsepower, or each absorption system over
100,000 BTU's to and including 500,000 BTU's
$25.00
11.
For the installation or relocation of each boiler or compressor over 15
horsepower to and including 30 horsepower, or each absorption system over
500,000 BTU's and including 1,000,000 BTU's
$30.00
12.
For the installation or relocation of each boiler or compressor over 30
horsepower to and including 50 horsepower, or each absorption system over
1,000,000 BTU's to and including 1,750,000 BTU's
$45.00
13.
For the installation of or relocation of each boiler or refrigeration compressor
over 50 horsepower, or each absorption system over 1,750,000 BTU's
$70.00
Building-Fees.doc
R
14.
For each air handling unit to and including 10,000 cubic feet per minute,
including ducts attached thereto
Note: This fee shall not apply to an air -handling unit which is a portion of a
factory assembled appliance, cooling unit, evaporative cooler or absorption
unit for which a permit is required elsewhere in this code.
$10.00
15.
For each air handling unit over 10,000 cubic feet per minute
$15.00
16.
For each evaporative cooler other that portable type
$10.00
17.
For each ventilation fan connected to a single duct
$10.00
18.
For each ventilation system which is not a portion of any heating or air
conditioning system authorized by a permit
$10.00
19.
For the installation of each hood which is served by mechanical exhaust,
including the ducts for hood
$10.00
20.
For each appliance or piece of equipment regulated by this code but not
classed in other appliance categories, or for which no other fee is listed in this
code
$10.00
21.
For single or multi -family building, the following flat rate shall apply
$0.045 per SF
22.
Appliance inspection (PG&E)
$25.00
OTHER INSPECTION FEES AND REFUNDS
1.
Inspections outside of normal business hours (Minimum charge - 3 hours)
$65.00
2.
Reinspection fee assessed under provision of Section 305.(fl
$50.00
3.
Inspections for which no fee is specifically indicated
(Minimum charge - one-half hour)
$65.00
4.
Additional plan review as determined by the Building Official
(Minimum charge - one-half hour).
$65.00
5.
Refunds on all permits shall be subject to a $35.00 administrative processing
fee.
Building-Fees.doc
CITY OF LODI
LODI, CALIFORNIA
RESOLUTION NO. 2007-229
FEE RESOLUTION
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Lodi herebyfinds,
determines, and resolves as follows:
1) That the Lodi Municipal Code requires the City Council to set fees for various services
provided by the City of Lodi to recover the costs associated with providing specific
services and programs; and
2) That the Building, Mechanical, Plumbing, and Electrical Code related fees
referenced below are hereby approved and become effective January 1, 2008.
PART 1: COMMUNITY DEVELOPMENT DEPARTMENT
Section 1: Building Fees:
That the Building Code related permit/inspection fees as shown below on Table I -A are hereby
approved:
TABLE NO. 1-A
TOTAL VALUATION FEES
$1.00 to $500 $50.00
$501 to $2,000 $50.00 for the first $500 plus $1.30 each
additional $100 or fraction thereof, to and
including $2,000.
$2,001 to $25,000 $69.50 for the first $2,000 plus $14.00 for
each additional thousand or fraction thereof
to and including $25,000.
$25,001 to $50,000 $391.50 for the first $25,000 plus $10.10 for
each additional thousand, or fraction
thereof, to and including $50,000.
$50,001 to $100,000 $644.00 for the first $50,000 plus $7.00 for
each additional thousand, or fraction
thereof, to and including $100,000.
$100,001 to $500,000 $994.00 for the first $100,000 plus $5.60 for
each additional or $1,000 or fraction
thereof.
$500,000 to $1,000,000 $3,234.00 for the first $500,000 plus $4.75
for each additional $1,000.00, or fraction
thereof, to and including $1,000,000.00.
$1,000,001 and up $5,609.00 for the first $1,000,000.00 plus
$3.15 for each additional $1,000-00, or
fraction thereof.
OTHER INSPECTION FEES AND REFUNDS:
1. Inspections outside of normal business hours
(minimum charge — 3 hours) $65.00 per hr.
2. Reinspectionfee assessed under provision
of Section 108.8 $50.00 each
3. Inspection for which no fee is specifically
indicated $50.00 per hr.
4. Additional plan review required by changes,
additions, or revisionsto approved plans
(minimum charge — one half hour) $65.00 per hr.
5. Special inspections required by owners, real estate
agencies, or loan agencies to determine compliance
to the Building Code in effect at the time of
construction:
6.
7.
8.
9.
10.
11.
Ii Pi
First hour $80.00
Each additional hour $34.00
Refunds on all permits shall be subject to an
administrative processing fee $35.00
Board of Appeals Fee $250.00
Demolition Permit $60.00
Manufactured Home, Commercial Coach
Maintenanceof Building Plans
Disabled Access Surcharge
Energy Compliance Surcharge
2
The fee shall be one-half (112) of the
valuation set out in Table No. 1-
Fees to comply with Section 19850,
Part 7 of the Health and Safety
Code of the State of California. All
new non-residential building plans,
except agricultural buildings:
Five percent (5%)of the building
permit fee.
Multi -family residential Disabled
access Surcharge shall be five
percent (5%) of the building permit
fee. Commercial Disabled Access
Surcharge shall be five percent (5%)
of the building permit fee.
Residential energy compliance
surcharge shall be five percent (5%)
13. Plan Checking Fees
Section 2 - Mechanical Code Fees:
of the building permit fee.
Commercial energy compliance
surcharge shall be ten percent
(10%) of the building permitfee.
The plan checking fees for all
buildings shall be sixty-five percent
(65%) of the building permit fee, as
set forth in this schedule.
That the Mechanical Code related permitlinspection fees as shown below on Table I -A are hereby
approved:
TABLE 1 —A
1. For the issuance of each permit $30.00
2. For the installation or relocation of each forced -air
or gravity -type furnace or burner, including ducts
and vents attached to such appliance, up to and
including 100,000 BTU's $15.00
3. For the installation or relocation of each forced -air
or gravity -type furnace or burner, including ducts
and vents attached to such appliance, over 100,000
BTU's to and including 500,000 BTU's $20.00
4. For the installation or relocation of each forced -air
or gravity -type furnace or burner, including ducts
and vents attached to such appliance, over 500,000
BTU's $25.00
5. For the installation or relocation of each floor furnace,
including vent $15.00
6. For the installation or relocation of each suspended
heater, recessed wall heater, or floor -mounted unit
heater $15.00
7. Forthe installation, relocation, or replacementof
each appliance vent installed and not included in
an appliance permit $10.00
8. For the repair of, alteration of, or addition to each
heating appliance, refrigeration unit, cooling unit,
absorption unit, or each heating, cooling, absorption,
or evaporative cooling system, including installation
of controls regulated by this code $15.00
9. For the installation or relocation of each boiler or
compressor to and including three horsepower, or
each absorption system to and including 100,000 BTU's $15.00
3
10. For the installation or relocation of each boiler or
compressor over three horsepowerto and including
15 horsepower, or each absorption system over 100,000
BTU's to and including 500,000 BTU's $25.00
11. For the installation or relocation of each boiler or
compressor over 15 horsepowerto and including 30
horsepower, or each absorption system over 500,000
BTU's and including 1,000,000 BTU's $30.00
12. For the installation or relocation of each boiler or
compressor over 30 horsepowerto and including 50
horsepower, or each absorption system over 1,000,000
BTU's to and including 1,750,000 BTU's $45.00
13. For the installation of or relocation of each boiler of
refrigeration compressor over 50 horsepower, or
each absorption system over 1,750,000 BTU's $70.00
14. For each air handling unit to and including 10,000
cubic feet per minute, including ducts attached thereto $10.00
NOTE: This fee shall not apply to an air -handling unit
which is a portion of a factory assembled appliance,
cooling unit, evaporative cooler, or absorption unit for
which a permit is required elsewhere in this Code.
15. For each air handling unit over 10,000 cubic feet
per minute $15.00
16. For each evaporative cooler other than portable type $10.00
17. For each ventilation fan connected to a single duct $10.00
18. For each ventilation system which is not a portion
of any heating or air conditioning system
authorized by a permit $10.00
19. Forthe installation of each hood which is served by
mechanical exhaust, including the ducts for hood $10.00
20. For each appliance or piece of equipment regulated
by this Code but not classed in other appliance
categories, or for which no other fee is listed in
this Code $10.00
21. For single or multi -family building, the following
flat rate shall apply $.045 Per SF
22. Appliance inspection (PG&E) $25.00
4
OTHER INSPECTION FEES AND REFUNDS
1. Inspections outside of normal business hours
(Minimum charge - 3 hours) $65.00
2. Reinspectionfee assessed under provision of
Section 305.(f) $50.00
3. Inspections for which no fee is specifically
indicated (Minimum charge - one-half hour) $65.00
4. Additional plan review as determined by the Building Official
(Minimum charge - one-half hour) $65.00
5. Refunds on all permits shall be subject to a
$35.00 administrative processing fee
Section 3 - Plumbina Code Fees:
That the Plumbing Code related permit/inspection fees as shown below on Table 1-1 are hereby
approved:
TABLE NO. 1-1
For issuing each permit $30.00
In addition:
1.
For each plumbing fixture or trap or set
of fixtures on one trap (including water,
drainage piping and backflow protection
therefore)
$
5.00
2.
For each building sewer
$
10.00
3.
Solar heaters
$
15.00
4.
Rainwater systems -per drain
$
5.00
5.
For each fire hydrant (first one)
$170.00
(each additional)
$
45.00
6.
For each private sewage disposal system
$
25.00
7.
For each heater and/or vent
$
5.00
8. For each gas piping system of one (1) to
five (5)outlets $ 7.00
9. For each gas piping system of six (6)or
more, per outlet $ 2.00
10. For each industrial waste pre-treatment
interceptor, including its trap and vent,
excepting kitchen -type grease interceptors
functioning as fixtures traps $ 30.00
5
11. For installation, alteration, or repair of water
piping and/or water treating equipment
$
7.00
12. For repair or alteration of drainage or vent
piping
$
7.00
13. For each lawn sprinkler system on anyone
meter, including backflow protection
devices therefore
$
7.00
14. For vacuum breakers or backflow protective
devices on tanks, vats, etc. or floor installation
on plumbing fixtures including necessarywater
piping:
One (1) to five (5)
$
7.00
Over five (5), each
$
1.50
15. Gasoline storage tanks
$
30.00
16. For new single or multi -family building, the
following flat rate shall apply $.045 Per SF
17. Fire sprinkler systems shall be based on value
charged according to the fee schedule of
Section 15.04.030 of the Code of the City of
Lodi
18. Gas piping pressuretest (PG&E) $ 15.00
19. Swimming pools $ 20.00
OTHER INSPECTION FEES AND REFUNDS:
1. Inspections outside of normal business hours
(Minimum charge -3 hours) $ 65.00 per hr
2. Reinspectionfee $ 50.00 each
3. Inspectionsfor which no fee is specifically
indicated $ 50.00 per hr
4. Additional plan review as determined by the Building Official
(minimum charge —one-half hour) $ 50.00 per hr
5. Refunds on all permits shall be subject to
a $35.00 administrative processingfee
6
Section 4 — Electrical Code Fees:
That the Electrical Code related permit/inspection fees as shown below on Table 3-A are hereby
approved:
TABLE 3-A
1. For issuing permits, a fee shall be paid for
issuing each permit in addition to all other
charges specified in this section $20.00
2. For wiring outlets at which current is used
or controlled $ 1.00
3. For fixtures, sockets, or other lamp holding
devices less than eighteen inches apart $ 1.00
4. For each five feet or fraction thereof multi -
outlet assembly $ 1.00
5. For electric discharge lighting fixtures $ 2.00
6. Mercury vapor lamps and equipment $ 2.00
7. Heaters $ 4.00
8. X-ray machines $ 5.00
9. Swimming pools $30.00
10. Electric ranges, range top and ovens, clothes
Dryers, water heaters $ 5.00
11. Forfixed motors, transformers, welder,
rectifier, air conditioners and other
miscellaneous equipment or appliances
shall be that given in the following table
for the rating thereof;
Up to and including 1 hp
$ 5.00
Over 1 and not over 5
$ 7.00
Over 5 and not over 20
$10.00
Over 20 and not over 50
$15.00
Over 50 and not over 100
$20.00
Over 100 — Each motor per hp
$ .20
12. For any equipment or appliance containing more than one motor
or other current consuming components in addition to the motor
or motors, the combined electrical ratings, converted to KVA of
all shall be used to determine the fee; for the purposed of this
subsection one H.P. or one KW is equivalent to one KVA.
13. The fees for a change of location or replacementof equipment on
the same premises shall be the same as that for a new installation.
However, no fees shall be required for moving any temporary
7
construction motor from one place to another on the same site
during the time of actual construction work after a permit has once
been obtained.
14. For switchboards the fees for installing, changing, replacing,
relocating, or reinstalling a switchboard, or for additions to an
existing switchboard shall be as follows:
a) 600 volts and less
First switchboard section $20.00
Each additional section $10.00
b) Over 600 volts $30.00
Each additional section $15.00
15. For distribution panels the fee for each
distribution panel, panelboard, or motor
control panel that is installed, changed,
replaced, relocated or reinstalled $10.00
16. For service installations, the installation of each set of service conductors
and equipment, including changing, replacing or relocating existing service
equipment, the fees shall be as shown in the following table:
TYPE OF SERVICE UNDER 600
VOLTS (Including One Meter)
0 to 100 Amperes
$10.00
101 to 200 Amperes
$20.00
201 to 500 Amperes
$30.00
501 to 1200Amperes
$40.00
Over 1200Amperes
$75.00
All services over 600 volts
$75.00
For each additional meter
$ 2.00
17. For single-family dwelling on new construction
work, the following flat rate shall apply to service
panels, all outlets, range, dryer, and other
miscellaneous circuits $ .035 per SF
18. For multi -family building on new construction
work, the following flat rate shall apply to subpanels,
all outlets, range, dryer, and any other
miscellaneous circuits $ .035 per SF
19. Signs
20. Inspectionsof damaged service
$15.00 each
$20.00
No permit shall be issued to any person unless all fees due are paid in full.
8
OTHER INSPECTION FEES AND REFUNDS
1. Inspections outside of normal business hours
(Minimum charge — 3 hours) $45.00 per hour
2. Reinspectionfee $35.00 each
3. Inspectionsfor which no fee s specifically
indicated $34.00 per hour
4. Additional plan review required by changes,
additions or revisions to approved plans
(Minimum charge —one-half hour) $34.00 per hour
5. Refunds on all permits shall be subject to a
$35.00 administrative processing fee.
Section 5: All resolutions or parts of resolutions in conflict herewith are repealed insofar as such
conflict may exist; and
Section 6: This resolution shall be published one time in the "Lodi News -Sentinel," a daily
newspaper of general circulation printed and published in the City of Lodi, and shall be
in force and take effect on January 1, 2008, which date is at least thirty (30) days after
the passage of this resolution.
Dated: November 21,2007
I hereby certify that Resolution No, 2007-229 was passed and adopted by the City Council of
the City of Lodi in a regular meeting held November 21, 2007, by the following vote:
AYES: COUNCIL MEMBERS — Hansen, Hitchcock, Katzakian, Mounce, and
Mayor Johnson
NOES: COUNCIL MEMBERS— None
ABSENT: COUNCIL MEMBERS— None
ABSTAIN: COUNCIL MEMBERS — None
OD-__
RANDIJOHL
City Clerk
2007-229
E