Loading...
HomeMy WebLinkAboutAgenda Report - October 17, 2007 K-02AGENDA ITEM �4020r'lk* CITY OF LODI COUNCIL COMMUNICATION M AGENDATITLE: Adopt Resolution Authorizing City Managerto Negotiate Change Orders up to $7,750,000 with Western Water Constructors, Inc., of Santa Rosa, for Emergency Repair of Domestic Outfall Sewer Pipeline MEETING DATE: October 17,2007 PREPARED BY: Public Works Director RECOMMENDED ACTION: Adopt a resolution declaring a local emergency for the Domestic Outfall Sewer Pipeline; dispensing the City's bidding requirements in accordancewith LMC §3.20.070; and authorizing the City Manager to negotiate change orders of up to $7,750,000 with Western Water Constructors, Inc., of Santa Rosa, for the emergency repair of the Domestic Outfall Sewer Pipeline. BACKGROUND INFORMATION: The City of Lodi's DomesticOutfall Sewer Pipeline (pipeline)was constructed in the late 1960's of unlined reinforced concrete pipe. It conveys an average of 6.5 million gallons of wastewater per day from the City of Lodi to the White Slough Water Pollution Control Facility (WSWPCF) that is located approximately five (5) miles to the southwest of town. Certain locations of the pipeline condition were evaluated numerous times since its original construction, however, the entire alignmentwas not assessed until recently. The most recent assessment revealed that portions are severely corroded and the pipeline is in need of rehabilitation. In response, the City has been repairing areas of concern and planning a pipeline repair project scheduled to commence in the spring of 2008. However, a recent event highlights the need to perform the repairs immediately. A construction worker replacing a corroded segment underThornton Road fell through another unstable section of the pipeline. Thankfully, the worker was not injured (the pipe was empty at the time as flows were being diverted to conduct the repairs). The event, however, clearly shows the potential risks associated with not taking immediate action. Staff has advised property owners along the alignment of the situation and has recommended safeguards for them to observe until further notice. In response to this urgent situation and to expedite the pipeline repair, staff recommends the Council authorize the City Manager to negotiate a change order with Western Water Constructors, Inc., (WWC). WWC is currently under contract with the City to construct the WSWPCF Phase 3 Improvements. The company has a long-standing relationshipwith the City, in addition to Phase 3, as it has successfully completed the WSWPCF Phase 1 and Phase 2 Improvements. All three project phases were competitively bid in accordance with State Public Contract Code and Phase 1 and 2 were completed on time and on budget. The company continues to exhibit fair, very cost effective, and responsive management practices while delivering top quality construction work during the current Phase 3 improvements. Their success is in part contributed to their familiarity with the City's facilities and APPROVED: Blair ' g, City Manager K:IWPIPROJECTS1SEWER\DomestioQutfalfAssessment\CSewerPfpefineRepair.doc 101812007 Adopt Resolution Authorizing the City Manager to Negotiate Change Orders up to $7,7500,000 with Western Water Constructors, Inc., of Santa Rosa, for Emergency Repair of Domestic Outfall Sewer Pipeline October 17. 2007 Page 2 infrastructure operation. In addition, the company has already performed spot repairs in the pipeline and has a good knowledge of local conditions. Staff is confident that by executing a change order with WWC for the pipeline work, the City will enjoy a very competitive price for the work while taking the most expeditious path toward completing the repair and eliminating the risks associated with a pipeline susceptible to collapse. FISCAL IMPACT: The Domestic Outfall Sewer Pipeline has reliably served the City for over 40 years, which is the typical life expectancy of non -lined reinforced concrete pipe. Though it is recommendedthe City's bidding requirements be dispensed, the cost of the repairs will likely be equal to or less than if the projectwas competitively bid due to the City's good relationship with the contractor. The total cost of the repair is estimated at $7,750,000. By repairing the pipeline, the City will mitigate its current risk of exposure to loss of life and/or property damage. FUNDING AVAILABLE: The projectwill be funded by proceedsfrom proposed 2007 Certificates of Participation scheduled to be sold in late November of this year. r vans, Budget Manager i Richard C. Prima, Jr. Public Works Director Prepared by Charlie Swimley, Water Services Manager RCPICESlpmf cc: Western Water Constructors, Inc. West Yost & Associates K 1WPIPROJECTSISEWERIDomesticOutfallAssessment\CSewerPipelineRepair.doc 101812007 RESOLUTION NO. 2007-208 A RESOLUTION OF THE LODI CITY COUNCIL DISPENSING WITH THE CITY'S BIDDING REQUIREMENTSAND AUTHORIZING THE CITY MANAGER TO NEGOTIATE CHANGE ORDERS WITH WESTERN WATER CONSTRUCTORS, INC., OF SANTA ROSA, FOR EMERGENCY REPAIR OF DOMESTIC OUTFALL SEWER PIPELINE WHEREAS, the City of Lodi's Domestic Outfall Sewer Pipeline (pipeline) was constructed in the late 1960's of unlined reinforced concrete pipe and conveys an average of 6.5 million gallons of wastewater per day from the City of Lodi to the White Slough Water Pollution Control Facility (WSWPCF): and WHEREAS, certain locations of the pipeline condition were evaluated numerous times since its original construction: however, the most recent assessment has revealed that portions of the pipeline are severely corroded and are subject to potential collapse; and WHEREAS, recent events involving a construction worker falling through an unstable section of the pipeline clearly shows the potential risks associated with not taking immediate action: and WHEREAS, Western Water Constructors, Inc., of Santa Rosa, is currently working for the City at WSWPCF, has made some repairs to the pipeline, is familiar with the project, and has performed in a cost-effective manner on the WSWPCF project: and WHEREAS, staff recommends authorizing the City Manager to negotiate contract change orders of up to $7,750,000 with Western Water Constructors, Inc., for work associated with the emergency repair of the Domestic Outfall Sewer Pipeline. NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council hereby declares a local emergency for the Domestic Outfall Sewer Pipeline: dispenses the City's bidding requirementsfor this project: and authorizes the City Manager to negotiate change orders of up to $7,750,000 with Western Water Constructors, Inc., of Santa Rosa, for the emergency repair of the Domestic Outfall Sewer Pipeline: and BE IT FURTHER RESOLVEDthat the Lodi City Council has appropriated in the 2007-08 Wastewater Capital Outlay Budget funding by proceeds from proposed 2007 Certificates of Participation scheduled to be sold in late November of this year. Dated: October 17, 2007 hereby certify that Resolution No. 2007-208 was passed and adopted by the City Council of the City of Lodi in a regular meeting held October 17, 2007, by the following vote: AYES: COUNCIL MEMBERS — Hansen, Hitchcock, Katzakian, Mounce, and MayorJohnson NOES: COUNCIL MEMBERS — None ABSENT: COUNCIL MEMBERS — None ABSTAIN: COUNCIL MEMBERS — None A IJOHL City Clerk 2007-208 CITY COUNCIL BOB JOHNSON, Mayor JOANNE L. MOUNCE Mayor Pro Ternpore LARRY D.HANSEN SUSAN HITCHCOCK PHILKATZAKIAN CITY OF LODI PUBLIC WORKS DEPARTMENT CITY HALL, 221 WEST PINE STREET P.O. BOX 3006 LODI. CALIFORNIA 95241-1910 BLAIR KING City Manager RANDI JOHL City Clerk D. STEVEN SCHWABAUER City Attorney RICHARD C PRIMA, JR. Public Works Director (209) 333-6706 FAX (209) 333-6710 EMAIL ovvdept@lodi.gov http:\\www.lodi.gov October 12,2007 Western Water Constructors, Inc. West Yost & Associates 707 Aviation Blvd. 1260 Davis Blvd., Ste. 240 Santa Rosa, CA 95403 Davis, CA 95616 SUBJECT: Adopt Resolution Authorizing City Manager to Negotiate Change Orders up to $7,750,000 with Western Water Constructors, Inc., of Santa Rosa, for Emergency Repair of DomesticOutfall Sewer Pipeline Enclosed is a copy of background informationon an item on the City Council agenda of Wednesday, October 17, 2007. The meeting will be held at 7 p.m. in the City Council Chamber, Carnegie Forum, 305 West Pine Street. This item is on the regular calendarfor Council discussion. You are welcome to attend. If you wish to write to the City Council, please address your letter to City Council, City of Lodi, P. O. Box 3006, Lodi, California, 95241-1910. Be sure to allow time for the mail. Or, you may hand-deliverthe letter to City Hall, 221 West Pine Street. If you wish to address the Council at the Council Meeting, be sure to fill out a speaker's card (available at the Carnegie Forum immediately prior to the start of the meeting) and give it to the City Clerk. If you have any questions about communicating with the Council, please contact Randi Johl, City Clerk, at (209) 333-6702. If you have any questions about the item itself, please call Charlie Swimley, Water Services Manager, at (209) 333-6740. Richard C. Prima, Jr. Public Works Director RCP/pmf Enclosure cc: City Clerk NCSEWERPIPELINEREPAIR.DOC