Loading...
HomeMy WebLinkAboutAgenda Report - October 3, 2007 E-06AGENDA ITEM G.+ (0 CITY OF LODI COUNCIL COMMUNICATION 110 AGENDA TITLE: Adopt Resolution Awarding the purchase cf padmounted liquid insulated vacuum switchgear and load/fault interrupters to Trayer Engineering of San Francisco, CA ($105,776.42) (EUD) MEETING DATE October 3, 2007 PREPARED BY: Electric Utilitty Director RECOMMENDEDACTION: Adopt a resolution awarding the purchase of padmounted liquid insulatedvacuum switchgearand IoadffaultinterrupterstoTrayer Engineering Corporation of San Francisco, California ($105,776.42). BACKGROUND INFORMATION: On April 18,2007 the City Council approved the specifications and authorized the advertisement for bids to procure padmounted liquid insulated vacuum switchgear. This equipment isfor the Reynolds Ranch Development Project. The bid documents and technical specificationswere advertised for bid. Four distribution power equipment suppliers and manufacturers requested bid documents On September 18,2007ptaff received proposals from two companies and an email response from one firm with the following results: Trayer Engineering Corporation, San Francisco, CA $105,776.42 Pacific Utilities Supply Co.. Pleasant Hill, CA $40,794.15"` Cooper Power Systems, Stateline, NV No Bid "Pacific Utilities Supply Company submitted a proposal for Bid Items 2 and 3 only with alternate switchgear design using air insulated medium. Their proposal did not comply with the technical specifications of the required power equipment. ABB, Inc. of the City oBndustry, California elected not to submit their bid proposal for this solicitation. The submitted bid costs by Trayer Engineeringand Pacific Utilities Supply are tabulated below. Staff found the proposal of Trayer Engineering Corporationto be compliant with the padmounted liquid insulated vacuum switchgear and loadffault interrupterspecifications. The Deparbnent has been using the Trayer Padmounted Switchgears in the City's electric distribution system for more than 10 years in several development projects. According to EUD's Line Crew, the equipment has proved itself to be easy to operate, with minimum maintenancework and safe operation especially during emergency troubleshooting during dark, night periods. The last procurement of Trayer padmounted liquid insulated vacuum switchgearswas made on January 17,2000 and eleven (11)units of the Bid Item 2 were purchased. The unit cost was APPROVED: /-- ZI Blair W g, Cfty Manager T Bid Item 1 "L- Nd � LI $22,138.34 Bid 4tem $20,585.64 $22,255.78 BW Item $2Q, 208. B1 24 367 . BO Rod Item No &A $37-015.00 2_..... Yes and air-insu ated !Mane Staff found the proposal of Trayer Engineering Corporationto be compliant with the padmounted liquid insulated vacuum switchgear and loadffault interrupterspecifications. The Deparbnent has been using the Trayer Padmounted Switchgears in the City's electric distribution system for more than 10 years in several development projects. According to EUD's Line Crew, the equipment has proved itself to be easy to operate, with minimum maintenancework and safe operation especially during emergency troubleshooting during dark, night periods. The last procurement of Trayer padmounted liquid insulated vacuum switchgearswas made on January 17,2000 and eleven (11)units of the Bid Item 2 were purchased. The unit cost was APPROVED: /-- ZI Blair W g, Cfty Manager Adopt Resoludon Awarding the purchm &padmounted liquid insulatedwatuun switchgear andloadlfautt interrupters tDTrayerEngineering Corporation of5an Francisco, CA ($105,776.42) (EUDI October 3,2007 Page 2 of 2 $22,489.80 on year 2000. Comparing to today's unit cost of $22,255.78, staff consideredTrayer's 2007 bid cost as reasonable. Bid Item 4 will be used for the Blue Shield Project and it will be fitted with automatic control and monitoringthat can be accessed remotelyfrom the EUD's Load Dispatch Center. It will be another step towards enhanced electric distribution system automation. Due to the criticality and long delivery time of this equipment, staff recommends City Council approval of a resolutionto award the procurement of the padmounted liquid insulatedvacuum switchgears and load/fault interruptersto Trayer Engineering Corporation of San Francisco, CA. FISCAL IMPACT: Procurement oast for this power equipment will be recovered through the City's Full Cost Recovery Rule as per Resolution No. 2006-234. Procurement cost is $105,776.42 FUNDING AVAILABLE: Account No. 160650 Budget Manager ill George F. Morrow Electric Utility Director PREPAREDBY: Demy Buaaneg, Jr.. P.E.. Manager. Engineering & Operations GFMIDBiist RESOLUTION NO. 2007-194 A RESOLUTION OF THE LODI CITY COUNCIL AWARDING THE BIDS FOR THE PURCHASE OF PADMOUNTED LIQUID INSULATEDVACUUM SWITCHGEAR AND LOAD/FAULT INTERRUPTERS WHEREAS, in answer to notice duly published in accordance with law and the order of this City Council, sealed bids were received and publicly opened on September 18, 2007, at 11 :00a.m_ for the purchase of padmounted liquid insulated vacuum switchgear and load/fault interrupters for the Electric Utility Department, described in the specifications therefore approved by the City Council on April 18,2007; and WHEREAS, the City Manager recommends the award of the bid for the various types and sizes of padmounted liquid insulated vacuum switchgear and load/fault interrupters for the Electric Utility Department be made to the bidder(s) whose proposal and equipment meet City of Lodi specifications and whose switchgear and load/fault interrupters are to be used for the Reynolds Ranch Development Project: Trayer Engineering Corporation, San Francisco, CA $105,776.42 Pacific Utilities Supply Co., Pleasant Hill, CA $ 40,794.15"` Cooper Power Systems, Stateline, NV No Bid 'Pacific Utilities Supply Company submitted a proposal for Bid Items 2 and 3 only with alternate switchgear design using air insulated medium. Their proposal did not comply with the technical specifications of the required power equipment. NOW, THEREFORE, BE IT RESOLVED that the award of the bid for the purchase of padmounted liquid insulated vacuum switchgear and load/fault interruptersfor the Electric Utility Department be and the same is hereby awarded to the lowest responsible bidder, Trayer Engineering Corporation, of San Francisco, California, in the total amount of $105,776.42. Dated: October 3, 2007 hereby certify that Resolution No. 2007-194 was passed and adopted by the City Council of the City of Lodi in a regular meeting held October 3, 2007, by the following vote: AYES: NOES: ABSENT: ABSTAIN: COUNCIL MEMBERS — Hansen, Hitchcock, Katzakian, Mounce, and MayorJohnson COUNCIL MEMBERS — None COUNCIL MEMBERS — None COUNCIL MEMBERS— None 2007-194 <9- RANDIJOHL City Clerk