HomeMy WebLinkAboutAgenda Report - September 5, 2007 K-04AGENDA ITEM K#4
CITY OF LODI
COUNCIL COMMUNICATION
TM
AGENDA TITLE: Direct City Staff to prepare a draft amendmentto the Lodi Municipal Code that
will add a Freeway Commercial Overlay Zone classification
MEETING DATE: September 5,2007
PREPARED BY: Community Development Department
RECOMMENDED ACTION:
BACKGROUND INFORMATION:
Purpose
Direct City staff to prepare a draft amendment to the Lodi
Municipal Code that will add a Freeway Commercial Overlay
Zone Classification.
Staff is concerned with the vitality of the Cherokee Lane corridor and enhancing its economic strength
and aesthetic appeal. Staff is also concerned with institutional barriers to the development of more
lodging opportunities within Lodi. Taken together, staff believes that the Cherokee Lane corridor
represents an opportunity to encourage hotel/motel development and other higher intensity uses. The
height limit of the C-2 General -Commercial Zone, the zone which the Cherokee Lane corridor is
designated, is 2 stories. Hotel/Motel development is often higher than 2 stories, up to 4 stories in
height. A mechanism should be developed to allow the City to respond to these market driven needs
for an increased height limit while also using this as an opportunity to improve the Cherokee Lane
corridor.
The Freeway Commercial Overlay Zone (FC -0) is intended to provide additional flexibility in the
development of commercial properties adjacent to Highway 99. The FC -0 would allow properties that
meet specific parcel and land use criteria to apply for approval of a development plan that includes
building features that vary from the normal development standards of the underlying General -
Commercial (C-2) zone. Each project would be reviewed on a case by case basis and must contain
unique features that would preclude the project from being developed using standard C-2
development criteria, particularly a building design that exceeds the current C-2 height limit of 2 -
stories or 35 feet.
Location
At present, the FC -0 is proposed to be limited to an area adjacent to Highway 99. Specifically, the
FC -0 would include the Cherokee Lane corridor generally extending from Turner Road on the north to
Century Boulevard on the south (see project area map). The area included is primarily zoned C-2,
general commercial, although a small portion of the area is zone M-1, light industrial and R -C -P,
Residential -Commercial -Professional. The area included in the Overlay has been identified as having
the highest potential for hotel and other types of higher intensity development given its exposure and
accessibility to the freeway.
APPROVED:
Blai g, City Manager
Criteria
For a project to qualify for consideration under the FC -0, the project will have to meet the following
criteria:
1. The Underlying land use designation must be zoned General Commercial (C-2).
2. The proposed project must be a commercial project and must be a land use permitted by the
underlying General Commercial (C-2) Zone.
3. The property must first have a General Plan designation of General Commercial and be
rezoned to C-2 before it can participate in the FC -0 process. This may require the rezoning of
multiple parcels to avoid creating a spot zone.
4. The project must be on a parcel(s) of land that can total one acre in size or larger.
5. The project can exceed the C-2 floor area ratio (F.A.R.) of 0.4, typically allowing 2 stories, but
shall not exceed a F.A.R. of 2.0 (typically 4 stories) and have a height restriction of 70 feet.
6. The project proponent must submit a development plan that clearly shows all aspect of the
proposed development, including building locations; building heights and number of floors:
building setbacks, parking and site landscaping. Additionally, the plans must indicate the type
of use proposed for each building and the exterior elevations of the buildings.
7. The proposed FC -0 provides the applicant the flexibility to detail their own setbacks, lot
coverage, and other site plan requirements subject to review and approval by staff and the
Planning Commission.
8. The project must have some unique development or design feature that would not permit the
project to comply with the normal development standards of the C-2 zone.
9. The project proponent must demonstrate that the requested changes to the design standards
for the proposed project will not adversely affect surrounding properties.
10. The project must also reflect design and landscaping standards that will enhance the existing
conditions in an effort to revitalized Cherokee Lane.
11. A specific Development Plan for the project must be approved by the Planning Commission.
Adoption Process
Adoption of the FC -0 will require a General Plan Amendment in order to create a new General Plan
classification. The Freeway Commercial Overlay (FC -0) designation will permitthe same uses as the
current General Commercial (GC) classification with one major difference. The GC designation
permits a maximum F.A.R. of 0.40. The proposed FC -0 designation will permit a F.A.R. of 2.0.
The Zoning Ordinance will also need to be amended to add the new designation of FC -0 with all
related development standards included. The F.A.R. of 2.0 will permit building heights greater than
the current two stories. Staffs current plan is to cap the height limit at 70 feet or four stories. Other
development standards can be determined on a case by case basis similar to a Planned
Development -PD zone.
Environmental Review Process
The adoption of the new General Plan and Zoning designations for the Freeway Commercial Overlay
designation will require some type of environmental review. It is anticipated that a Negative
Declaration will be the level of environmental review required. A Negative Declaration should be
sufficient because the new zone will require that each project be reviewed on a case by case basis.
Except for the modified setbacks and higher F.A.R., building height and maximum number of stories,
there are no additional entitlements that will result from the new zone. The permitted uses will remain
the same and the number of project sites that will be affected will be limited in number because of the
one -acre minimum size requirement.
Time LineforAdoption
The adoption of a new zoning classification will require both a General Plan Amendment and a
change in the Zoning Ordinance. Both will require public hearings before the Planning Commission
and the City Council. The Zoning Amendment will need to be done by Ordinance and therefore
requires a second reading and will not take effect until 30 days after the second reading. Prior to the
hearing process, the Community Development Department and the City Attorney's office will need to
work out the exact language of the new zoning classification and an environmental review process will
need to be completed. Based on these requirements it is anticipated that the entire process could
take a minimum of 90 days to complete.
Conclusion
The FC -0 will allow development of a limited number of unique projects that could not be built utilizing
the normal development standards of the C-2 zone. By utilizing the added flexibility of the Freeway
Commercial Overlay Zone, the City can allow the development of projects that can have a social
and/or economic benefit for the City, and provide jobs or other opportunities for Lodi residents and
provide for improvements to the Cherokee Lane corridor.
FISCAL IMPACT: The proposed zoning amendment is revenue neutral. Preparation of the
draft amendment and the related environmental documentwill be done
by City staff. If the amendment is adopted, an appropriate application
fee will be charged to any property owner requestingthe FC -0
designation.
FUNDING AVAILABLE: N/A
ndy
Community Development Director
Attachments:
1. Project area map