AGENDA TITLE: Adopt Resolution Awarding the PurchaseofPadmount Transformers
($200,330.96) (EUD)
MEETING DATE: August 1,2007
PREPARED B Y Electric Utility Director
RECOMMENDED ACTION: Adopt a resolution awarding the bids for the purchase of padmount
transformers to the bidders whose proposals and equipment meet
City of Lodi specifications, and whose transformers are expected to
yield the lowest life -cycle costs.
BACKGROUND INFORMATION: On May 16,2007, the City Council authorized the Electric Utility
Department(EUD) to advertisefor bids as necessaryto meet the
EUD's needsfor padmount transformers through the fiscal year.
On July 1,2007, bidswere opened for nine sizes cf padmount transformers, and life -cycle oasts were
evaluated (Life -cycle costs are the combined total purchase price plus cost of operation based on
estimated power loss during the projected life of the transformer).
7 each 37.5kVA, 1 -Ph HEES Enterprises, Inc. $14,089.39
8 each 50WA, 1 -Ph HEES Enterprises, Inc. 17,636.52
6each 75kVA, 1 -Ph HEES Enterprises, Inc. 18,050.28
3 each 150kVA, 3 -Ph HEES Enterprises, Inc. 24,082.13
2 each 225kVA, 3 -Ph, 208Y PauwelsTransformen. Inc. 18,162.34
1 each 225kVA, 3 -Ph. 480Y Pauwels Transformers, Inc. 9,546.65
3 each 300kVA, 3 -Ph Pauwels Transformers, Inc. 32,273.28
leach KOWA, 3 -Ph PauwelsTransformers, Inc. 15,765.98
2 each 1500kVA, 3 -Ph HEES Enterprises, Inc. 50,724.39
AMMM
Proposals are also evaluated on the basis of compliance with equipment and bid specifications. Failure
to comply with both may lead to disqualification of the bid. A summary of the bid evaluation is attached
as ExhibitA Some of the transformers are planned for use in a commercial development on Reynolds
Ranch and other residential and commercial developments and upgrades within the City. Other
transformers are to bring the number of stock transformers of different sizes to the required inventory
level.
FISCAL IMPACT: Procurement cost is $200,330.96
FUNDING: 1
�
Budges lwwmaW
George F. Morrow, Electric Utility Director
PREPARED BY: y Sucaneg, Jr., P.E., Manager, Engin"O g a OpeWona
APPROVED:-/
Blair QWCIty Manager
Transformer Bid Evaluation
Bid Opening: July 11, 2007
Padmount
Tax (factor):
1.0775
Primary Winding:
12,000 Volt, Delta Connected, 3 -Phase
No Load Loss $/watt:
3.75
12,000 Grd W e/6,930 Volt, 1 -Phase
July 11 , 2007
Load Loss $/watt:
1.25
E7
Bid Item 1: 37.5 kVA, 2401120 Volt, Single
Phase Pad
Number of units:
26
>1.5
Vendor
Unit
Extended
Price
No Load
Load
No Load
Load
Cost of
Life Cycle
Delivery
Hei ht
Impedance
Price $
Price $
w/tax $
Loss (watts)
Loss watts
Loss value
Loss value
Losses $
Cost $
weeks
inches
%
Howard Industries, Inc.
HEES Enterprises, Inc.
Wesco Distribution, Inc.
2,421.001
1,666.00
2,469.00
16,947.0018,
13,076.00
17,283.00
0.3
9.
8,622.
t821,152.50
2
2,231.25
,310.00
928.75
,867.50
.033.751
6,160.00
6,177.50
6,186.25
24,420.39
20,266.89
24,808.68
6-8
14-16
30-40
24
26
24
1.728
1.500
Pauvwels Transformers, Inc.
No Bid
Central Moloney, Inc.
No Bid
Bid Item 2: 50 kVA, 2401120 Volt, Single Phase Pad
Number of units:
8
26
>1.6
Vendor
Unit
Extended
Price
No Load
Load
No Load
Load
Cost of
Life Cycle
Delivery
Hei ht
limped nce
Price $
Price $
w/tax $
Loss watts
Loss watts
Loss value
Loss value
Losses $
Cost $
weeks
inches
%
Howard Industries, Inc.
HEES Enterprises, Inc.
Wesco Distribution, Inc.
2,760.00
2,046.00
2,731.00
22,080.001
16,366.00
21,846.00
23,791.201
17,636.52
23,541.22
110
101
821
5111
580
461
3,300.00
3,030.00
2,460.00
5,110.00
5,600.00
4,610.00
8,410.00
6,830.00
7,070.001
32,201.20
26,466.52
30,677.22
6-8
14-16
30-40
24
26
24
1.612
1.600
Pauwels Transformers, Inc.
No Bid
Central Moloney, Inc.
No Bid
Bid Item 3: 75 kVA, 2401120 Volt, Single Phase Pad
Number of units:
6
26
>1.6
Vendor
Unit
Extended
Price
No Load
Load
No Load
Load
Cost of
Life Cycle
Delivery
Hei ht
Im edance
Price $
Price $
w/tax $
Loss watts
Loss watts
Loss value
Loss value
Losses $
Cost $
weeks
inches
%
Howard Industries, Inc.
HEES Enterprises, Inc.
Wesco Distribution, Inc.
3,651.00
2,792.00
3,254.001
21,906.00
16,752.00
19,624.001
23,603.72
18,050.28
21,037.111
149
149
1191
634
700
7691
3,352.50
3,352.50
2,677.501
4,755.00
5,250.00
5,917.501
8,107.50
8,602.50
6,595.001
31,711.22
26,652.78
29,632.17
6-8
14-16
30-401
24
28
24
1.681
1.800
Pauwels Transformers, Inc.
No Bid
Central Moloney, Inc.
No Bid
Bid Item 4: 750 kVA, 208Yl720 Volt, Three
Phase Pad
Number of units:
3
65
>2.0
Vendor
Unit
Extended
Price
No Load
Load
No Load
Load
Cost of
Life Cycle
Delivery
Hei ht
Impedance
Price $
Price $
wltax $
Loss (watts) Loss watts
Loss value
Loss value
Losses $
Cost $
weeks
inches
%
Howard Industries, Inc.
HEES Enterprises, Inc.
Wesco Distribution, Inc.
9,163.00
7,450.00
8,643.00
27,489.00
22,350.00
26,629.001
29,679.40
24,082.73
28,585.00
272
316
3351
1692
1537
1242
3,060.00
3,555.00
3,766.75
6,345.00
5,763.75
4,657.50
9,405.00
9,318.75
6,426.251
39,024.40
33,400.88
37,077.25
26-28
38-41
30-40
46
49
48
2.291
3.600
Pauwels Transformers, Inc.
7,415.00
22,245.00
23,968.99
349
1597
3,926.25
5,988.75
9,915.00
33,883.99
34-36
52.1
2.510
Central Moloney, Inc.
No Bid
Bid Item 5: 225 kVA, 208Yl720 Volt, Three
Phase Pad
Nu of units:
2
65
>3.5
Vendor
Unit
Extended
Price
lo 0
oa
o Load
Cost of
Life Cycle
Deliver
Hei ht
Impedance
Price $
Price $
wltax $
Loss w
s watts
Loss value
Loss value
Losses $
Cost $
weeks
inches
%
Howard Industries, Inc.
10,984.00
21 ,966.00
23,670.52
432
2307
3,240.00
5,767.50
9,007.50
32,678.02
26-28
51
3.605
HEES Enterprises, Inc.
9,530.00
19,060.00
20,537.151
217
3298
1,627.50
8,245.00
9.872.501
30,409.65
38-411
49
3.900
Wesco Distribution, Inc.
Pauwels Transformers, Inc.
Central Moloney, Inc.
10,522.00
8,428.00
No Bid
21 ,044.00
16,856.00
22,674.911
78,762.34
412
458
2673
2,688
3,090.00
3,435.00
6,682.50
6,720.00
9,772.601
10,155.00
32,447.47
28,377.34
30-401
34-36
56
52.1
3.740
Bid Item 6: 225 kVA, 480Y/277 Volt, Three
Phase Pad
Number of units:
1
65
>3.5
Vendor
Unit
Extended
Price
No Load
Load
No Load
Load
Cost of
Life Cycle
Delivery
Hei ht
Impedance
Price $
Price $
wltax $
Loss watts
Loss(watts),Loss
value
Loss value
Losses $
Cost $
weeks
inches
%
Howard Industries, Inc.
11 ,284.00
11 ,284.00
72,758.57
453
2151
1,696.76
2,686.75
4,367.50
76,546.07
28-30
51
3.782
HEES Enterprises, Inc.
9,208.00
9,208.00
9,927.62
225
3355
843.75
4,193.75
5,037.50
74,959.72
38-41
49
3.900
Wesco Distribution, Inc.
Pauwels Transformers, Inc.
Central Moloney, Inc.
10,571.00
8,860.00
No Bid
10,571.00
8,860.00
77,390.25
9,546.65
387
415
2035
2430
1,451.26
1,556.25
2,543.75
3,037.50
3,995.00
4,593.75
75,385.25
74,740.40
30-40
34-36
56
52.1
3.660
Bid Item 7: 300 kVA, 208Yl120 Volt, Three
Phase Pad
Number of units:
3
66
>3.6
Vendor
Unit
Extended
Price
No Load
Load
No Load
Load
Cost of
Life Cycle
Delivery
Hei ht
Impedance
Price $
Price $
wltax $
Loss (watts) Loss watts
Loss value
Loss value
Losses $
Cost $
weeks
inches
%
Howard Industries, Inc.
13,627.00
40,681.00
44,049.28
615
2577
5,793.76
9,663.75
16,467.60
59,506.78
26-28
51
3.689
HEES Enterprises, Inc.
11,646.001
34,938.001
37,645.701
3621
28231
4,072.50
10,586.251
14.658.751
52,304.45
38-411
57
3.900
Wesco Distribution, Inc.
Pauwels Transformers, Inc.
Central Moloney, Inc.
11,784.001
9,984.00
No Bid
35,352.001
29,952.00
38,091.781
32,273.28
4741
546
26001
3251
5,332.50
6,142.50
9,376.001
12,191.25
14,707.601
18,333.75
52,799.28
50,607.03
30-401
34-36
52
52.1
3.650
Bid Item 8: 500 kVA, 208Yl120 Volt, Three Phase Pad
Number of units:
1
76
>4.0
Vendor
Unit
Extended
Price
No Load
Load
No Load
Load
Cost of
Life Cycle
Delivery
Hei ht
Impedance
Price $
Price $
wltax $
Loss watts Loss(watts),Loss
value
Loss value
Losses $
Cost $
weeks
inches
%
Howard Industries, Inc.
19,073.00
19,073.00
20,551.16
754
4902
2,627.50
6,127.50
6,955.00
29,506.16
28-30
61
4.401
HEES Enterprises, Inc.
16,242.00
16,242. n000.76
505
6188
1 ,893.75
735.00
9,628.75
27,129.51
38-41
49
4.600
Wesco Distribution, Inc.
Pauwels Transformers, Inc.
Central Moloney, Inc.
17,721.00
14,632.00
No Bid
17,721.00
14,632.00
19, 4.38
1 S.
?111
53
2,523.75
093.75
M70.00
MA42.50
9,193.75
9,136.25
28,288.13
24,902.23
30-40
34-36
60
58.1
3.700
Bid Item 9: 1500 kVA, 480W277 Volt, Three Phase Pad
Number of units:
2
90
>5.3
Vendor
Unit
Extended
Price
No Load
Load
No Load
Load
Cost of
Life Cycle
Delivery
Hei ht
Impedance
Price $
Price $
wltax $
Loss(watts),Loss(watts),Loss
value
Loss value
Losses $
Cost $
weeks
inches
%
Howard Industries, Inc.
HEES Enterprises, Inc.
Wesco Distribution, Inc.
36,047.00
23,538.00
33,447.00
72,094.001
47,076.00
66,694.00
77,681.291
50,724.39
72,078.29
16041
1654
19401
120611
10167
9273
12,030.00
12,405.00
14,550.00
30,202.501
25,417.50
23,182.50
42,232.601
37,822.50
37,732.601
119,913.79
88,546.89
109,810.79
30-321
38-41
30-40
69
63
61
5.799
5.500
Pauwels Transformers, Inc.
27,582.00
55,164.00
59,439.21
1674
12676
12,555.00
31 ,690.00
44,245.00
103,684.21
34-36
72.1
5.750
Central Moloney, Inc.
No Bid
Total Cost:
HEES Enterprises, Inc.
124,582.71
Pauwels Transformers, Inc.
75,748.25
$
200,330.96
RESOLUTION NO. 2007-149
A RESOLUTION OF THE LODI CITY COUNCIL
AWARDING THE BIDS FOR THE PURCHASE OF
PADMOUNT TRANSFORMERS
WHEREAS, in answer to notice duly published in accordance with law and the order of
this City Council, sealed bids were received and publicly opened on July 1, 2007, at 11:00 a.m.
for the purchase of padmount transformers for the Electric Utility Department, described in the
specifications therefore approved by the City Council on May 16, 2007; and
WHEREAS, said bids have been compared, checked, and tabulated and a report
thereof filed with the City Manager as shown on Exhibit A attached; and
WHEREAS, the City Manager recommends the award of the bids for the various types
and sizes of padmount transformers for the Electric Utility Department be made to the bidder(s)
whose proposal and equipment meet City of Lodi specifications and whose transformers are
expected to yield the lowest overall life -cycle costs, listed as follows:
7 each 37.5 kVA, I - Ph
8 each 50 kVA, I - P h
6 each 75kVA, 1 -Ph
3 each 150kVA, 3 -Ph
2 each 225kVA, 3 -Ph, 208Y
1 each 225kVA, 3 -Ph, 480Y
3 each 300kVA, 3 -Ph
1 each 500kVA, 3 -Ph
2 each 1500kVA, 3 -Ph
HEES Enterprises, Inc.
$
14,089.39
HEES Enterprises, Inc.
$
17,636.52
HEES Enterprises, Inc.
$
18,050.28
HEES Enterprises, Inc.
$
24,082.13
Pauwels Transformers, Inc,
$
18,162.34
Pauwels Transformers, Inc.
$
9,546.65
Pauwels Transformers, Inc.
$
32,273.28
Pauwels Transformers, Inc.
$
15,765.98
HEES Enterprises, Inc.
$ 50.724.39
5200.530.96
NOW, THEREFORE, BE IT RESOLVED that the award of the bids for the purchase of
padmount transformers for the Electric Utility Department be and the same is hereby awarded
to-tf&-lowest responsible bidders, -as -shown above, in the total amountof $200.330.96.
Dated: August 1,2007
hereby certify that Resolution No. 2007-149 was passed and adopted by the City
Council of the City of Lodi in a regular meeting held August 1,2007, by the following vote:
AYES: COUNCIL MEMBERS— Hansen, Hitchcock, Katzakian, Mounce, and
MayorJohnson
NOES: COUNCIL MEMBERS — None
ABSENT: COUNCIL MEMBERS — None
ABSTAIN: COUNCIL MEMBERS — Nonq.�
RA JOHL
City Clerk
kiIl)aEL,'1
EXHIBIT A
ransformar Bid Evaluation
E 7 JBId iPlning:€July f 1.... - - _.... ._
Padmount— Tax (factor) 1.0775 I Primary Winding: 12000 Voll Deka Connected, 3—Phase
No Load Loss Vwatt 3 75— 12 OOD Grd W bl6 930 Voh
1—
July 11.2007 Load Loss SMatt.' 1.25 i i
19
20
...... _... -
n 7: 300 kVA, 20BYJ120 Vok, Three Phase Pad
Vendor_
Unit
Extended
19 073.00 19,073 00
Price
Price S .,
-. ------
._._.j
_.
....._. ..... .
Industries Inc.
13.627.001
40 881 00
nterprises, Inc.
11,11461]0
34 938 00
Distribution, Inc.
11,784,00
35-%2.00
s Transformers. Inc.
9,984.00
29,0152.00
kem B: 500 kVA, 20t11rJ720 Vok, Thres Phase Pad
!.
Price S Price S
iorvard Industries, Inc.
19 073.00 19,073 00
Nesco Distribution, Inc.
17,721.001 17,721.00
39uwels Transformers, Inc.
14,632:00 14,632:00
;entraf Moion�, Inc.-
No Bid'
Max i Loss (hafts) Lass
r -
F
Lasses i
_
Cost i
_ _ ...1-
aid Item 9: 1500 kVA, 460Y/277 Vok, Three Phase Pad
Vendor
Unit Extended
---
Price S Price
coward Industries, Inc.
36,047.00 72,094.00
ZEES Enterprises, Inc.
23,538.00 47,076.00
Nesco Distribution, Inc.
.. __ . _ _
33,447 001 66.,894 T
..__;..._.. -_
3auwels Transformers. Inc.
27.582.00: 55.164.00
!.
_
Number of units
1 Price - No Load
Load No Load Load
Cost Cr
Life gyRi
DaH+re„r� �_ He► M ,impedance
Max i Loss (hafts) Lass
r -
watts ,Las a Loss value E
_ - — b _
Lasses i
_
Cost i
_ _ ...1-
eks
._�!
mchea
. .._
96
.... __ .._..
---
9,663 75
15,457.50
59,x06 78'
26-28
51,
_
3.689
-
4,Q72� 110,51%J5
14668.75
52,31Mi.45
38-41
_ 57
3.900
3641_._51&_'5793.75
,09 .7681 474:'
474
2500 $ 332.50 9,375.00.
14,707.50
52,799.28
30-40'
S2'
323..28
323.1 6142::50 12,191.25
18,333.75
50,607.03
34-36
52:1
3.650
Number of unrts:� 1 76 >4.0
- _
Pnce s Load Load ad ` Load Cosi of Uie G_cle Deliver �He�hi Impedance
' ax S Lass is Lass is : Loss value Loss value Losses f Cost S eks orches 96
--
__.__� ...
20 51.16 7 4 4502 2827.50 B 127 60' 8,965.00 29,506.161 28-30 - 61 4.401
L----
rAn 76 505 6188 1,893.75 735 0o 9 w62B.75 27,12951 38 41 49 4600
_ .__._._ . ._. .....
.38 2,523.7 00 9,193.75 28,288.13, 30 4E1 80
;043.75 2.50 9,136.26 24,901:23 34-36 58.1 3.700
--+-_,_-, er of units 2 90 x5.3
-----------------
Pnce No Load Load No Load Load Cost of Life Ccle DelrvTrr? Height Impedance
-- - -
wJtax $Loes sLoss �watte) Loss value Loss value Losses S Cost S vreeks�µsnches 96
77,681.29 1604; 12081' 12,030.00 - 90(12 50 42 232.50 119.913.79 W 313 3W u 69. 5.794
50,124.39 1654 10167 12.405.OD 25,417.50 37,82240 68,546.89 38-41 63 5:500
72076.29 L 1940 _ - 9273 14,550.00 23,182.50; 37,732.501 109,810.79 30 40 - - 61
59,439.211 1674: 12676': 12.555.W 31MOD. 44245.001 163 .211 34-36 72.11 5.750
21