Loading...
HomeMy WebLinkAboutAgenda Report - June 6, 2007 E-19AGENDA ITEM edoll CITY OF LODI COUNCIL COMMUNICATION TM AGENDA TITLE: Adopt Resolution Approving a Second One -Year Extension of the 2005106 Annual Curb, Gutter and Sidewalk Replacement Contract with Jeff Case Construction Company, of Lodi, for the 2007108 Fiscal Year with a Three Percent Increase ($73,336) MEETING DATE: June 6,2007 PREPARED B Y Public Works Director RECOMMENDED ACTION: Adopt a resolution approving a second one-year extension of the 2005/06 annual curb, gutter and sidewalk replacement contract with Jeff Case Construction Company for the 2007108 fiscal year, with a three percent increase, at a cost of $73,336. BACKGROUND INFORMATION: The annual curb, gutter and sidewalk replacement contract is administered by the Street Division. This contract is for replacement of miscellaneous concrete work as guided by the sidewalk replacement program and sidewalk inventory. Jeff Case Construction Company is the provider currently under contract. Section 6-04.03 of the contract allows that "by mutual agreement, the City and Contractor may enter into an agreement for an annual extension of this contract based upon the same terms and conditions set forth herein." Jeff Case Construction Company agreed to honor the prices from the 2005106 contact with a 3% increase (cost sheet attached) to cover increased costs of materials and fuel for the 2006107 fiscal year. Once again, Jeff Case Construction has agreed to honor the original bid from 2005106 with another 3% increase. Staff feels this increase is more than justified due to the increased cost for fuel and concrete. All miscellaneous concrete bids in past years have been very close in cost, and Jeff Case Construction Company has provided excellent service and a very good product. FISCAL IMPACT: The extent of actual work done will be tied to the level of funds available after the beginning of the 2007108 fiscal year. FUNDING AVAILABLE: Funding for this contractwill be coming from various funds as approved in the budget for sidewalk work. This contract is also utilized for public sidewalk work done on behalf of property owners for which the City is reimbursed. i Evans, Budget Richard C. Prima, Jr. Public Works Director Prepared by Curt Juran, Assistant Streets and Drainage Manager RCP/GMB/CJ/dsg Attachment (Cost Sheet) cc: George M. Bradley, Streets and Drainage Manager APPROVED: Blair � . Citv Manaaer K:NWP%COUNCIL1071SidewalkReplacement.docSidewalkReplacement.doc ., r .. 4/27/2007 CITY OF LODI Public Works Department Jeff Case Bid Tab PROJECT SOURCE: 2005-06 SIDEWALK REPAIR PROGRAM AND MISCELLANEOUS CONCRETE WORK. 2007-08 SIDEWALK REPAIR PROGRAM AND MISCELLANEOUS CONCRETE WORK WITH 3% + 3% (6 total) INCREASE 2005-2006 Bid Costs 2007-2008 Costs with 6% Increase Item Description Qty Unit Price Total Unit Price With 3% increase Total Price With 6% increase 1 Saw Cut Concrete 200 LF $4.75 $950.00 $5.04 $1,007.00 $0.00 2 Remove Sidewalk or Asphalt Concrete 1000 SF $5.50 $5,500.00 $5.83 $5,830.00 $0.00 3 Remove Commercial Sidewalk 150 SF $6.50 $975.00 $6.89 $1,033.50 $0.00 4 Remove Square -Type Curb and Gutter 50 LF $10.00 $500.00 $10.60 $530.00 $0.00 5 Remove Vertical -Type Curb and Gutter 20 LF $10.00 $200.00 $10.60 $212.00 $0.00 6 Remove Driveway -Type Curb and Gutter 50 LF $10.00 $500.00 $10.60 $530.00 $0.00 7 Remove Commercial -Type Curb and Gutter 50 LF $12.00 $600.00 $12.72 $636.00 $0.00 8 Root Surgery Under Sidewalk or in Planter Area 1 EA $350.00 $350.00 $371.00 $371.00 $0.00 9 Root Surgery Under Curb and Gutter 1 EA $400.00 $400.00 $424.00 $424.00 $0.00 10 Install Sidewalk or Residential Driveway (0 - 75 SF) 100 SF $10.00 $1,000.00 $10.60 $1,060.00 $0.00 11 Install Sidewalk or Residential Driveway (76 - 300 SF) 500 SF $6.00 $3,000.00 $6.36 $3,180.00 $0.00 12 Install Sidewalk or Residential Driveway (>300 SF) 2500 SF $5.00 $12,500.00 $5.30 $13,250.00 $0.00 43 install HandiGap RaFn,p 0 SF $A 9i3 $0-:00 $0.00 $0.00 $0.00 14 Install Square -Type Curb and Gutter 7 -inch or less (0 - 20 LF) 20 LF $25.00 $500.00 $26.50 $530.00 $0.00 15 Install Square -Type Curb and Gutter 7 -inch or less >20 LF 75 LF $25.00 $1,875.00 $26.50 $1,987.50 $0.00 16 Install Square -Type Curb and Gutter Greater than 7 -inch (0 - 20 LF) 50 LF $25.00 $1,250.00 $26.50 $1,325.00 $0.00 17 Install Square -Type Curb and Gutter Greater than 7 -inch >20 LF 75 LF $25.00 $1,875.00 $26.50 $1,987.50 $0.00 18 Install Vertical -Type Curb and Gutter (0 - 20 LF) 75 LF $25.00 $1,875.00 $26.50 $1,987.50 $0.00 19 Install Vertical -Type Curb and Gutter (>20 LF) 100 LF $20.00 $2,000.00 $21.20 $2,120.00 $0.00 20 Install Driveway -Type Curb and Gutter (0 - 20 LF) 100 LF $25.00 $2,500.00 $26.50 $2,650.00 $0.00 21 Install Driveway -Type Curb and Gutter >20 LF 1000 LF $20.00 $20,000.00 $21.20 $21,200.00 K\VACW,10L\07\SdelelldWwment_A WYr9nLA&e#f Case Bid v& b-/. K\VYRO UL\07\SdelelWZeplaomiat_AltadvrertbsM Case Bid v&b-/o $0.00 22 Install Tree Well 1 EA $350.00 $350.00 $371.00 $371.00 $0.00 23 Install Furnished Side -Inlet Catch Basin Assembly 3 EA $750.00 $2,250.00 $795.00 $2,385.00 $0.00 24 Install Catch Basin Barrel 3 EA $1,400.00 $4,200.00 $1,484.00 $4,452.00 $0.00 25 Install Furnished Street Name Sign Base 1 LF $150.00 $150.00 $159.00 $159.00 $0.00 26 Miscellaneous Concrete Sub rade Compaction 1000 LF $2.75 $2,750.00 $2.92 $2,915.00 $0.00 27 Move -In Cost for Jobs <$200 2 EA $500.00 $1,000.00 $530.00 $1,060.00 $69,050.00 $73,193.00 K\VYRO UL\07\SdelelWZeplaomiat_AltadvrertbsM Case Bid v&b-/o RESOLUTION NO. 2007-110 A RESOLUTION OF THE LODI CITY COUNCIL APPROVING A SECOND ONE-YEAR EXTENSION OF THE 2005-06 ANNUAL CURB, GUTTER, AND SIDEWALK REPLACEMENT CONTRACT FOR THE 2007-08 FISCALYEAR WITH A THREE PERCENT INCREASE NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council hereby approves the second one-year extension of the 2005-06 Annual Curb, Gutter, and Sidewalk Replacement Contract with Jeff Case Construction Company, of Lodi, for the 2007-08 fiscal year with a three percent (3%) increase in an amount not to exceed $73,336. Dated: June 6, 2007 hereby certify that Resolution No. 2007-110 was passed and adopted by the City Council of the City of Lodi in a regular meeting held June 6, 2007, by the following vote: AYES: COUNCIL MEMBERS— Hansen, Hitchcock, Katzakian, Mounce, and Mayor Johnson NOES: COUNCIL MEMBERS— None ABSENT COUNCIL MEMBERS— None ABSTAIN: COUNCIL MEMBERS —None JOHL City Clerk 2007-110