HomeMy WebLinkAboutAgenda Report - January 16, 2008 E-04AGENDA ITEM Eowq
CITY OF LODI
COUNCIL COMMUNICATION
M
AGENDA TITLE: Adopt Resolutions Authorizing City Manager to Execute Agreements
Regarding Woodbridge Irrigation District Connection for Providing Surface
Water and Appropriating Funds ($92,000)
MEETING DATE: January 16,2008
PREPARED BY: Public Works Director
RECOMMENDED ACTION: Adopt resolutions authorizing the City Manager to:
1) Execute an agreement with Woodbridge Irrigation Districtfor the reimbursementof costs for
construction of rawwater supply piping for the Lodi Surface Water Treatment Plant and
appropriate $60,000 from the Water Development Impact Fee fund.
2) Execute Amendment No. 1, in the amount of $32,000, to the contract with HDR Engineering,
Inc., to add raw water pump station design and consultations with California Departmentof
Public Health and appropriate funds from the Water Development Impact Fee fund.
BACKGROUND INFORMATION: The Woodbridge Irrigation District (WID) is currently constructing a
fish screen at the head of the main irrigation canal. In planning for
the City's future surface water diversions, WID incorporated a
48 -inch diameter raw water supply pipe stub into the design and
construction of the fish screen facility for Lodi to access at a later time when the surface water treatment
plant was being constructed. The design and construction of the outlet pipe have been performed at no
cost to the City.
As City and WID staff continued discussion on the future connection, we determined the pipe could be
terminated at a higher elevation during the fish screen construction by adding an elbow fitting. This
would make it significantly easier to connect to the pipeline during construction of the City's surface water
treatment plant. Due to right-of-way constraints and the need to perform a significant excavation near the
river, adding the elbow now will cost significantly less since the excavation is currently open and the
temporary construction right-of-way has been acquired.
Citing potential of disturbing the newly -constructed fish screen improvements, WID is strongly urging the
City to have the work done now to avoid future excavation adjacent to their completed facility and has
offered to assist.
In order to save significant future construction costs and to avoid the risk of disturbing the WID fish
screen improvements, staff recommends Council authorize the City Managerto execute an agreement
with Woodbridge Irrigation District for the reimbursementof costs for construction of rawwater supply
piping for the Lodi Surface Water Treatment Plant and appropriate funds ($60,000). A copy of the WID
proposal is provided as Exhibit
APPROVED:
Blau City Manager
K:\WP\PROJECTS\WATER\SurfaceWaterRFP\CAgreements.doc
111012008
Adopt Resolutions Authorizing City Manager to Execute Agreements Regarding Woodbridge Irrigation
District Connection for Providing Surface Water and Appropriating Funds ($92,000)
January 16,2008
Page 2
However, construction of raw water supply piping at this time will require that the design of the pipeline
and pump station be advanced from conceptual to a more detailed design level. Since May 2007,
HDR Engineering, Inc., (HDR) has been under contractwith the City to prepare the surface water
treatment facility conceptual design and feasibility evaluation for utilization of the Woodbridge Irrigation
District (WID) surface water supply. That work is progressing and Council has preliminarily selected the
water treatment plant site.
Amendment No. 1 to the HDR contract adds the following services:
1. Near -final design of the raw water supply pipeline and pumping station to coordinatewith the WID
construction underway. In cooperation with the City, WID will have its contractor construct one
elbow of the new raw water supply piping as shown in Exhibit B.
2. Perform additional research and analysis of the California Health and Safety Code required to
develop a strategic action plan with respectto recreational use of Lodi Lake and the point of
diversion for a public drinking water supply.
Because Lodi Lake includes a swimming beach, several provisions of the California Health and Safety
Code, Division 104, are potentially relevant to the proposed diversion from the Mokelumne River at the
WID canal. Several alternatives exist for addressing the various and different provisions of the code and
their applicability to this project, A quick determination on these issues was required and a position
paper and decision matrix has been prepared and discussed with State of California Department of
Public Health, The decision by the State was favorable to the project.
FISCAL IMPACT: None at this time. Upon completion of the surface water treatment
facilities, additional maintenance costs will be incurred by the City. The
HDR contract is $399,786, and the amendment is $32,000 or 8%.
Approximately $112,000 has been expended on this contract as of
November 2007. Although it is early in the project, cost savings in the contract may result from the early
selection by the City Council of the preferredwater plant site that could partially offset this contract
amendment.
FUNDING AVAILABLE: Funds will need to be appropriated from the Water Development Impact
Fee fund in the amount of $92,000.
HDR Contract Amendment No. 1: $32,000
WID Cost imbursement: $60,000
Totaldation: $92,000
fis, Budget Manager
�ar Richard C. 17tima, Jr.
Public Works Director
Prepared by Wally Sandelin, City Engineer/Deputy Public Works Director and CharlieSwimley. Water Services Manager
RCPIFWSIpmf
Attachments
cc: Anders Christensen, Woodbridge Irrigation District F. Waily Sandelin, City Engineer/Deputy Public Works Director
Charlie Swimiey. Water Services Manager D. Stephen Schwabauer, City Attorney
K 1W PIPROJ ECTSIW ATERIS urfaceW aterRFPICAgreements. doc 111012008
WOODBRIDGE IRRIGATION DISTRICT
DgRECTORS 18777 N. LOWER SACRAMENTO ROAD
WILLIAM STOKES
PRESIDENT f WOOOBRIOGE CALIFORNIA 95258
ED LUCCNESI 12091369-6808
VICE PRESIDENT
FAX: 369-6823
BILL 5I4INN
AVERY McOUEEN
HENRY P. VAN EXEL
January 2, ZOOS
Charles Swimley
Public Works Department
221 West Pine Street
PO Box 3006
Lodi, CA 95241-1910
IEEr Charley, Re: Lodi Delivery Point
Exhibit A
ANDERS CIHRISTENSEN
MANAGER
SE -r 9 ARY / TREASURER
JIM 511ULT15
SUPERNTENDENT
We have made an analysis ofthe probable costs for the installation ofthe of the Lodi
Pipe extension to bring the centerline of the "T" elevation to 29.9' MSL to facilitate a
future installation. The project would involve excavation for the 90 deg. Elbow to
elevation 19' (approx.). The 90 deg. elbow would be secured with a concrete thrust block
poured in place. The remainder ofthe pipe extension would then be place on top ofthe
90 deg. bend. A crane would be utilized to place the sections. The District would wrap
the pipe with heavy poly wrap and back fill with Class 11 road base.
We have obtained a quote for the pipe including delivery to the site amounting to
$30,302.00 plus tax including all hardware. It is estimated that the pipe could be
delivered to the site in approximately 3 weeks after ordering.
The District would utilize its own labor forces for the install and would bill Lodi for all
labor and materials an equipment rental needed to make the installation. The cost for the
entire project including the pipe costs will mt exceed $60,000. If you agree with our
proposal, please sign the letter and return to the District.
Signed Anders Christensen: Date: i Z — d 8
Woodbridge Irrigation District
Signed Charles Swiumley:
City of Lodi
Date:
z'd Cass-69E(Goa) U014e21-IJi 92P!Jgp00M e89:01 80 20 Uer
a
r -
C)
0
N
L..
D
a
w
0
F-
0
J
a
Z
Cn
0
U
0
w
J
m
Q
H
Z
w
a
1
FDA.j_
HDR Engineering, Inc.
ISSUE I DATE
2
150#FF BLIND
FLANGE ---,
150#FF BLIND
FLANGE (REUSE
EXISTING BLIND
FLANGE) ---\,
EL 29.9
PROVIDE CEMENT MORTAR
LINING/COATING PER
AWWA C205, TYPICAL
ALL FITTINGS
FLANGED 48" DIA
1/4" WALL,
5 PIECE ELBOW
CL EL 21.5
(EXISTING,
CONCRETE
SUPPORT -
EL 43.6
(EXISTING)
GRADE EL 42.6
OIL (EXISTING)
PROJECT MANAGER
DESCRIPTION PROJECT NUMBER
EL 37.0
48"-36" REDUCER
1/4" WALL
48" TEE
1/4" WALL
6'-0" (VERIFY)
EL 28.0
(EXISTING)
3
tX151 INU 1 SU ff r F bLINU TO AWWA C 2 0 5
FLANGE TO BE RELOCATED
SECTION rA
FIG 1
0 2 4 8 FT
SCALE: %11=1'-0"
CITY OF LODI
RAW WATER PUMP STATION
4
I. E. 9.5
(EXISTING)
EL 19.0
EXHIBIT B
C
0
'•
0
'•
0
'•
0
'•
0
'•
0
'•
7
• A
•
4
• A
•
4
• A
•
4
• A
•
4
• A
•
4
• A
tX151 INU 1 SU ff r F bLINU TO AWWA C 2 0 5
FLANGE TO BE RELOCATED
SECTION rA
FIG 1
0 2 4 8 FT
SCALE: %11=1'-0"
CITY OF LODI
RAW WATER PUMP STATION
4
I. E. 9.5
(EXISTING)
EL 19.0
EXHIBIT B
C
RESOLUTION NO. 2008-01
A RESOLUTIONOF THE LODI CITY COUNCILAUTHORIZING THE
CITY MANAGER TO EXECUTE AGREEMENT WITH WOODBRIDGE
IRRIGATION DISTRICT FOR THE REIMBURSEMENT OF COSTS FOR
CONSTRUCTION OF RAW WATER SUPPLY PIPING FOR THE LODI
SURFACE WATER TREATMENT PLANT AND APPROPRIATING
FUNDS FOR THIS PROJECT
WHEREAS, the Woodbridge irrigation District (WID) is currently constructing a fish
screen at the head of its main irrigation canal; and
WHEREAS, in planning for the City's future surface water diversions, WID at no cost to
the City of Lodi incorporated a 48 -inch diameter raw water supply pipe into the design and
construction of the fish screen facility for Lodi to access at a later time when the surface water
treatment plantwas being constructed; and
WHEREAS, it was discovered the 48 -inch diameter raw water supply pipe could be
terminated at a higher elevation during the fish screen construction, thereby making it
significantly easier to connect to the pipeline during construction of the City's surface water
treatment plant; and
WHEREAS, due to right-of-way issues and the need to perform a significant excavation
near the river, this modification will cost significantly less to implement now since the excavation
is currently open and the temporary right-of-way has been acquired; and
WHEREAS, WID is strongly suggesting this work be performed as part of fish screen
improvements to avoid a future excavation adjacent to its completed facility.
NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council hereby authorizes the
City Manager to execute an agreement with Woodbridge Irrigation District for the
reimbursement of costs for construction of raw water supply piping for the Lodi Surface Water
Treatment Plant; and
BE IT FURTHER RESOLVEDthat funds in the amount of $60,000 be appropriated from
the Water Development Impact Fee fund.
Dated: January 16, 2008
hereby certify that Resolution No. 2008-01 was passed and adopted by the Lodi City
Council in a regular meeting held January 16,2008, by the following votes:
AYES:
NOES:
ABSENT:
ABSTAIN
COUNCIL MEMBERS —Hansen, Hitchcock, Johnson, Katzakian, and
Mayor Mounce
COUNCIL MEMBERS — None
COUNCIL MEMBERS— None
COUNCIL MEMBERS — None
ANDI JOHL
City Clerk
RESOLUTION NO. 2008-02
A RESOLUTION OF THE LODI CITY COUNCIL
AUTHORIZING THE CITY MANAGER TO EXECUTE
CONTRACT AMENDMENT NO. 1 WITH HDR ENGINEERING,
INC., TO ADD RAW WATER PUMP STATION DESIGN AND
CALIFORNIA DEPARTMENTOF PUBLIC HEALTH PERMIT
CONSULTATIONS AND FURTHER APPROPRIATING FUNDS
WHEREAS, HDR Engineering, Inc., (HDR) has been under contract with the City
of Lodi since May 2007 to prepare the surface water treatment facility conceptual design
and feasibility evaluation for utilization of the Woodbridge Irrigation District (WID) surface
water supply; and
WHEREAS, Amendment No. 1 would provide for the near -final design of the raw
water supply pipeline and pumping station to coordinate with the WID construction
underway and performance of research and analysis of the California Health and Safety
Code required to develop a strategic action plan with respect to recreational use of Lodi
Lake and the point of diversion for a public drinking water supply; and
WHEREAS, in cooperation with the City, WID will have its contractor construct
one elbow of the new raw water supply piping; and
WHEREAS, construction of a new fish screen by WID has included the
installation of a horizontal pipe stub that would be the future connection point for the raw
water supply to the water treatment plant, and staff recommends the installation of the
elbow at this time, which would require that the design of the pipeline and pump station
be advanced from conceptual to near -final design level; and
WHEREAS, Lodi Lake includes a swimming beach, and several provisions of the
California Health and Safety Code, Division 104, are potentially relevant to the proposed
diversion from the Mokelumne River for the water treatment plant. Several alternatives
exist for addressing the various and different provisions of the code and their
applicability to this project. A position paper and decision matrix will be prepared and
discussed with the California Department of Public Health for the purpose of establishing
a strategic action plan.
NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council does hereby
authorize the City Manager to execute Contract Amendment No. 1 with HDR
Engineering, Inc., in the amount of $32,000 to add raw water pump station design and
consultations with the California Department of Public Health; and
BE IT FURTHER RESOLVED that funds in the amount of $32,000 be
appropriated from the Water Development Impact Feefund.
Dated: January 16,2008
I hereby certify that Resolution No. 2008-02 was passed and adopted by the City
Council of the City of Lodi in a regular meeting held January 16, 2008, by the following
vote:
AYES: COUNCIL MEMBERS — Hansen, Hitchcock, Johnson, Katzakian,
and Mayor Mounce
NOES: COUNCIL MEMBERS — None
ABSENT: COUNCIL MEMBERS — None
ABSTAIN: COUNCIL MEMBERS — None
2D-
RANDI JOHL
City Clerk
2008-02
CITY COUNCIL
JOANNE L. MOUNCE. Mayor
LARRY D. HANSEN,
Mayor Pro Tempore
SUSAN HITCHCOCK
BOBJOHNSON
PHIL KATZAKIAN
CITY OF LODI
PUBLIC WORKS DEPARTMENT
CITY HALL, 221 WEST PINE STREET
P.O. BOX 3006
LODI. CALIFORNIA 95241-1910
(209) 333-6706
FAX (209) 333-6710
EMAIL pwdept@lodi.gov
http:\\www.lodi.gov
January 11,2008
Anders Christensen
Woodbridge Irrigation District
18777 N. Lower Sacramento Road
Woodbridge, CA 95258
BLAIR KING
City Manager
RANDI JOHL
City Clerk
D. STEVEN SCHWABAUER
City Attorney
RICHARD C. PRIMA, JR.
Public Works Director
SUBJECT: Adopt Resolutions Authorizing City Manager to Execute Agreements
Regarding Woodbridge Irrigation District Connection for Providing Surface
Water and Appropriating Funds ($92.000)
Enclosed is a copy of background information on an item on the City Council agenda of
Wednesday, January 16, 2008. The meetingwill be held at 7 p.m. in the
City Council Chamber, Carnegie Forum, 305 West Pine Street.
This item is on the consent calendar and is usually not discussed unless a
Council Member requests discussion. The public is given an opportunityto address
items on the consent calendar at the appropriate time.
If you wish to write to the City Council, please address your letter to City Council,
City of Lodi, P. O. Box 3006, Lodi, California, 95241-1910. Be sure to allow time for the
mail. Or, you may hand-deliverthe letter to City Hall, 221 West Pine Street.
If you wish to address the Council at the Council Meeting, be sure to till out a speaker's
card (available at the Carnegie Forum immediately prior to the start of the meeting) and
give it to the City Clerk. If you have any questions about communicating with the
Council, please contact Randi Johl, City Clerk, at (209) 333-6702.
If you have any questions about the item itself, please call Charlie Swimley,
Water Services Manager, at (209) 333-6740.
Richard C. Prima, Jr.
r. ' Public Works Director
RCP/pmf
Enclosure
cc: City Clerk
K:\WP\PROJECTS\WATER\SURFACEWATERRFP\NCGRAWWATERPIPING.DOC