Loading...
HomeMy WebLinkAboutAgenda Report - December 6, 2006 E-05A6EII410A ITEM E405 CITY OF LOIDI COUNCIL COMMUNICATION TM AGENDA TITLE: Adopt Resolution Awarding Contract for Water and Wastewater Main Repla"n ent Program, Project No. 3 to J. F. Pacific Liners, Inc., of Vacaville ($825,675) MEETING DATE: December 6, 2006 PREPAID BY: Public Works Director RECOMMENDED ACTION: Adopt a resolution awarding the contract for the Water and Wastewater Main Replacement Program, Project No. 3 to J. F. Pacific Liners, Inc., of Vacaville, in the amount of $825,575. BACKGROUND INFORMATION: The City's Water and Wastewater Main Replacement Program is intended to systematically replace and, where needed, upgrade existing water and wastewater infrastructure within the oldest areas of the City. In these older areas, wastewater pipelines are mostly constructed of terracotta or concrete pipe and the waterlines are largely constructed of small -diameter cast iron or steel pipe. The majority of these pipes are in need of rehabilitation and/or replacement. Project No. 3 is the third project scheduled in this program and will focus on rehabilitating wastewater mains that are located in the greater Downtown area. A number of water and wastewater mains in the core Downtown area were rehabilitated as part of other projects. Included in these projects was the rehabilitation of the main in the alley south of Pine Street between Church Street and Hutchins Street which was done at the request of the Regional Water Quality Control Board. Their concern was that a leaking sewer could interfere with PCE/TCE remediation methods. This project is similar and is compatible with the City's PCE/TCE remediation program. Project No. 3 includes in-place (trenchless) rehabilitation of approximately 12,500 linear feet of 6 -inch diameter wastewater main, the rehabilitation of 65 manholes, and the reconnection of approximately 300 wastewater laterals. Plans and specifications for this project were approved on August 2, 2006. The City received the following two bids for this project on November 8, 2006. Bidder Location Bid Engineer's Estimate $ 855,580 J. F. Pacific Liners, Inc. Vacaville $ 825,757 Insituform Technology, Inc. Chesterfield, MO $ 1,150,255 The bid received from J.F. Pacific Liners is compliant with the City's plans and specifications, and the bidder possesses the required valid contractor's license. Construction of this project is, anticipated to start in January of 2007. Inspection and construction management services will be performed by City Engineering staff. Staff will provide project information to the pub#c regarding the construction schedule and the project scope. APPROVED: Blair King, City Manager J %PROJECTS\WATER1EastsideWaterWastewaterRehablProject rd.doc 1113012006 Adopt Resolution Awarding Contract for Water and Wastewater Main Replacement Program, Project No. 3 to J. F. Pacific Uners, Inc., of Vacaville ($825,575) December 6, 2006 Page 2 The difference between the cpntract amount and the project estimate includes an allowance for contingencies arising for unfoi eseen changes in the work. This project is funded by Environmental Protection Agency (EPA) Grant funds requiring National Environrfental Policy Act (NEVA) compliance. In accordance with the EPA procedures for implementing NEPA 40 CFR Part 6, the EPA has determined the project is eligible for a categorical exclusion under 40 CFR 16.107 and is exempt from the substantive environmental review requirements of NEPA (42 U.S.C. 4321 et sea.). In addition, this project has been determined to be categorically exempt in accordance with California Environmental Quality Act (CEQA) Section 15301 (d) Restoration or Rehabilitation of Existing FacAities. FISCAL IMPACT: This work is partially funded by an EPA State and Tribal Assistance Grant (STAG) account for water, wastewater and groundwater infrastructure projects. The grant will fund 55% of the project construction costs up to $385,700. Since the project costs are estimated at $850,000, the maximum grant amount will be utilized and the matching project costs ($464,300) will be funded by wastewater capital outlay funds. Completing this project wHI reduce future maintenance costs and increase the performance and reliability of the wastewater system. FUNDING AVAILABLE: Project Estimate: $ 850,000 Wastewater Fund (171678): $ 850,000 EPA Grant Funds: $ 385,700 Local Wastewater Funds: $ 464,300 r S -fir R aiste, Financial Services Manager i c Richard C. Prima, Jr. Public Works Director Prepared by Charlie Swimkey, senior Civil Engineer RCPiCESlpmf Attachment cc: City AODrney Purcht*ing officer Water*asiewater Superintendent J %PROJECT$IWATER1EastsideWaterWastuosterRehablProject#31CAward.doc 11/1712106 y -OFA— <IFOKCITY OF LO PUBLIC WORKI WATER/WASTEWATER MAIN REHABILITATION PROGRAM PROJECT #3 0 12 cwzf�mmmmiml'l 12 -•-fes,-�! Look in < m � Elm St. -� Ix `Q m ` �v " m v U " m <e v > C > < " o Lift m C C Pine St. scat > 10 U m / MonbdrVJ `8^ m ><g�Eon v k St. v c < > Q v to vJ ao N fq .0 <" Q° Ilev " J L) A E a ° a co m a v Walnut St, <10in <g v m c v g CC N �o c v ,Qv v U v <12 <12 <1 <12 Lodi Ave. < ER PROJECT AREA U.P.R.R me BOUNDARY XVR LEGEND N.T.S. M:\0PEN\EXHIBITS\06X001.dwg, EPA GRANT, 11/16/2006 3:25:13 PM, jpizzo WASTEWATER MAIN SIZE 6> WITH FLOW DIRECTION 6 > EXISTING WASTEWATER �O MAIN TO BE REHABILITATED 6 > EXISTING WASTEWATER PREVIOUSLY REHABILITATED o EXISTING WASTEWATER MANHOLE TO BE REHABILITATED N.T.S. M:\0PEN\EXHIBITS\06X001.dwg, EPA GRANT, 11/16/2006 3:25:13 PM, jpizzo RESOLUTION NO. 2006-216 A RESOLUTION OF THE LODI CITY COUNCIL AWARDING THE CONTRACT FOR WATER AND WASTEWATER MAIN SOLACEMENT PROGRAM, PROJECT NO.3 WHEREAS, in answer to notice duly published in accordance with law and the order of this City Council, sealed Fids were received and publicly opened on November 8, 2006, at 11:00 a.m., for Water and Wastewater Main Replacement Program, Project No. 3, described in the specifications therefore approved by the City Council on August 2, 2006; and WHEREAS, said bilis have been compared, checked, and tabulated and a report thereof filed with the City Manager as follows: EftonO 'S E $ 855,580 J. F. Pacific Liners, Inc., Vacaville $ 825,757 Insituform Techngllogy, Inc., Chesterfield, MO $1,150,255 WHEREAS, staff r#commends that the City Council award the contract to J. F. Pacific Liners, Inc., of Vacaville, Wifornia, in the amount of $825,575. NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council hereby awards the contract to J. F. Pacific Liners, Inc., of Vacaville, California, in the amount of $825,575. Dated: December 6, 2006 I hereby certify that Resolution No. 2006-216 was passed and adopted by the City Council of the City of Lodi in a regAr meeting held December 6, 2006, by the following vote: AYES: COUNCIL MEMBERS — Beckman, Hansen, Johnson, Mounce, and Mayor Hitchcock NOES: COUNCIL MEMBERS — None ABSENT: COUNCIL MEMBERS — None ABSTAIN: COUNCIL MEMBERS — None RANDI JOHL City Clerk