HomeMy WebLinkAboutAgenda Report - November 15, 2006 E-03AGENDA ITEM E-01 CITY OF LODI COIUNCIL COMMUNICATION TM AGENDA TITLE: Approve Plan and Specifications and Authorize Advertisement for Bids for Water "128 Pump and Motor and Site Improvements MEETING DATE: November 15, 2006 PREPARED BY: Public /Works Director RECOMINENt3ED ACTION: Approve pians and specification and authorize advertisement for bids for the Well 28 pump and motor and site improvements. BACKGROUND INFORMATION: The project will have the contractor famish and install a 150 -horsepower deep well turbine pump and motor, 442 linear feet of 10 -inch water main, 340 linear feet of storm drainage pipe, 410 linear feet of 8 -foot chain link fence with gate, and other incidental and related work, all as shown on the plans and specifications for the "Water Well 28 Pump and Motor and Site Improvements, 2800 West Ketftman Lane" project. This is the final phase of the well improvement. The well is located on the site of the future Westside substation and will ultimately be enclosed within the walls of the substation. The completed well will provide much-needed peak demand water, as well as fire protection for the western edge of the City. The plans and specifications are on file in the Public Works Department. FISCAL WPACT: The completed water well will require regular maintenance and operation costs which will be offset by the water rates. Project Estimate: $300,000 Planned Bid Opening Date: December 20, 2006 FUNDING AVAILABLE: The project is accounted for in the FY 06/07 Water Impact Fee account in the amount of $175,000. Staff will return to Council after the bid opening for project award and ditionai opriation, if required. Prepared by: Lyman Chang, Associate Civil Engineer RC PILC/pmf cc: Water/Wastewater Superintendent Associde Civil Engineer, Chang APPROVED: -: -` Blair Kin Manager J:IPROJECTSWATER\WeU28Pump&Motor\CPS&A.doc 11/9/2006