AGENOA TITLE: Approw plans and specifications and authorize advertiserrwent for bids for roof
replacement improvements at Legion Park, 835 S. Hutchins Street and Kofu F%rk,
1145 S. Ham Lane
MEETINIS DATE. October 18, 2005
PRIEPASED BY: Parks and Recreation Director
RECOIIII MEQ ACTION: Approve plans and specifications and authorize advertisement for
bids for roof replacement improvements at Legion Park, 835 S.
Hutchins Street, and Kofu Park, 1145 S. Ham Lane.
BACKGROUND INFORMATION: The project was included in the Parks and Recreation Department
2000 Park Bond Act Per Capita Grant program request, which was
presented and approved by City Council at its regular meeting on
January 18, 2006.
The Le*n Community Build" work consists of removal and disposal of the existing flat roof structure,
existing steel support columna and flat roof decking overhangs. New work includes:
• Wood framing of a pitched roof and installation of a standing seam finished roof
• E3ectrical
• Beating Ventilation and Air Conditioning (HVAC)
•
Plumbing
• Go ncrete
• Flough and finish carpentry
The Kofit Community Building work consists of removal and disposal of the existing shake roof material,
and roof1hg paper from the emoting structure. New work includes:
• Dry rot replacement
• Intalttion of a new composition roof system
• Ckher related work shorn on the plans
Plans and specifications are an file in the Parks and Recreation office.
FISCAL BAPACT: There is no direct impact to the Parks and Recreation Department budget for the
installation of the new roof replacements. The 2000 Park Bond Act Per Capita
Grant program will be supporting the installation of this project in its entirety.
APPROVED:-'
Blair kiilg, City Manager
Approve pl and speciftations and authorize advertisement for bids for roof replacement improvements at Legion Pat*, 835 S. Hutchins
Street and. ofu Park, 1195 S. Ham Lane
October 1 a 2006
Page 2
FUNDING: Legion Roof Improvements: $ 73,000.00
Kofu Rbof Improvements: $ 18,000.00
Engineer's Estimate: $ 91,000.00
2000 Park Bond Act Per Capita Grant Allocation: $130,543.00
(Legion Park - $83,903.00 / Kofu Park - $46,640.00)
7'{.. 41, ,,�
Ruby FWhte, Financial Services Manager
Tony C o ig
Parks and ectlon Director
Prepared by Steve Virrey, Park Project Coordinator
cc: Susark fork, Management Analyst
Steve;butra, Parr Superintendent
Wes fttawi, Sr. IONK Erpinear
Joel H*ris, Purchosing Officer