HomeMy WebLinkAboutAgenda Report - October 4, 2006 E-04AGENDA ITEM &q CITY OF LORI COUNCIL COMMUNICATION TM AGENDA!, TITLE: Adopt a resolution awarding the purchase of pole -mount and pad -mount transformers to ERMCO, Inc., of Dyersburg, TN ($83,851.06) (EUD) MEETING DATE: October 4, 2006 PREPAID BY: Electric Utility Director RECOMMENDED ACTION: That the City Council adopt a resolution awarding the bid for the purchase of 27 pole -mount and fire pad -mount transformers to ERMCO, Inc., of Dyersburg, Tennessee, the bidder whose proposal and equipment meet City of Lodi specifications, and whose transformers are expected to yield the lowest overall life -cycle costs. Total purchase price is $83,851.06. BACKGODUND INFORMATION: On August 2, 2006, the City Council authorized the advertisement for bids for pole -mount and pad -mount transformers to meet the Electric Utility Department's anticipated needs for mid -2007. On September 6, 2006, bids were opened for three sizes each of pole -mount and pad -mount transformers, and life -cycle costs were evaluated. (Life -cycle costs are the combined total of purchase price plus cost of operation based on estimated power loss during the projected life of the transformer. Power loss in a transformer results from resistance to electrical current in the primary and secondary windings, creating heat, combined with the power needed to energize the core of the transformer.) A summary of the life -cycle cost evaluation for the transformers is attached as Exhibit A. The successful bidder, Electric Research and Manufacturing Cooperative (ERMCO), is represented by Hees Enterprises of Astoria, OR. These transformers are expected to arrive in May, 2007, to cover anticipated mid -2007 requirements. FISCAL IMPACT: Initial cost $83,851.06, to be recovered by revenues from future sale of power. FUNDING: Electric Utility Department 2006-2007 Financial Plan and Budget, Line Extensions ;06106by Paist* Financial} Services Manager rge Morrow, Electric Utility Director t Attachment: Exhibit A Prepared by Joel Harris, Purchasing Officer cc: City Attoifley EUD Eledricai Engineer APPROVED: / � Blair Kind -,--City Manager Transformer Bid Evaluation Polemount September 6, 2006 Bid Item 1: 25kVA, 120/240 Volt, Single Phase Conventional Pole Vendor Unit Extended Unit Price $ Price $ ERMCo cto Hees Enterprises, Inc. 834.00 4,170.00 WESCO Distribution -San Leandro 1,838.00 9,190.00 GE Supply 1,328.00 6,640.00 Howard Industries, Inc. 1,270.00 6,350.00 Central Moloney, Inc. No Bid Central Moloney, Inc. Hughes Supply, Inc. -Cooper 1,009.00 5,045.00 Bid Item 2: 37.5kVA, 120/240 Volt, Single Phase Circuit -Protected Pole Unit Vendor Unit Extended Price $ Price $ Price $ ERMCo cto Hees Enterprises, Inc. 1,236.00 11,124.00 WESCO Distribution -San Leandro 2,374.00 21,366.00 GE Supply 1,895.00 17,055.00 Howard Industries, Inc. 2,015.00 18,135.00 Central Moloney, Inc. No Bid 1,820.00 Howard Industries, Inc. -Cooper 1,400.00 12,600.00 Bid Item 3: 50kVA, 120/240 Volt, Single Phase Circuit -Protected Pole Vendor Unit Extended Number of units: Price $ Price $ ERMCo cto Hees Enterprises, Inc. 1,359.00 17,667.00 WESCO Distribution -San Leandro 2,666.00 34,658.00 GE Supply 2,890.00 37,570.00 Howard Industries, Inc. 2,054.00 26,702.00 Central Moloney, Inc. No Bid 1,312.50 Howard Industries, Inc. -Cooper 1,820.00 23,660.00 Bid Opening: September 6, 2006 Tax (factor): 1.0775 Primary Winding: 12,000 Volt Line -to -Line No Load Loss $/watt: 3.75 Load Loss $/watt: 1.25 Number of units: 5 Transformer Eval 09-15-06_pole.xls 1 45 500 Life Cycle No Load Load Number of units: 9 (weeks) Price Loss Loss No Load Load Cost of w/tax $ (watts) (watts) Loss value Loss value Losses $ 4,493.18 70 312 1,312.50 1,950.00 3,262.50 9,902.23 77 346 1,443.75 2,162.50 3,606.25 7,154.60 55 323 1,031.25 2,018.75 3,050.00 6,842.13 68 320 1,275.00 2,000.00 3,275.00 5,435.99 49 372 918.75 2,325.00 3,243.75 Transformer Eval 09-15-06_pole.xls 1 45 500 Life Cycle Delivery Height Number of units: 9 (weeks) No Load Load 7,755.68 31-33 41 Price Loss Loss No Load Load Cost of w/tax $ (watts) (watts) Loss value Loss value Losses $ 11,986.11 83 423 2,801.25 4,758.75 7,560.00 23,021.87 100 507 3,375.00 5,703.75 9,078.75 18,376.76 80 424 2,700.00 4,770.00 7,470.00 19,540.46 92 414 3,105.00 4,657.50 7,762.50 13,576.50 80 489 2,700.00 5,501.25 8,201.25 Transformer Eval 09-15-06_pole.xls 1 45 500 Life Cycle Delivery Height Number of units: 13 (weeks) No Load Load 7,755.68 31-33 41 Price Loss Loss No Load Load Cost of w/tax $ (watts) (watts) Loss value Loss value Losses $ 19,036.19 119 500 5,801.25 8,125.00 13,926.25 37,344.00 123 630 5,996.25 10,237.50 16,233.75 40,481.68 102 384 4,972.50 6,240.00 11,212.50 28,771.41 114 505 5,557.50 8,206.25 13,763.75 25,493.65 107 601 5,216.25 9,766.25 14,982.50 Transformer Eval 09-15-06_pole.xls 1 45 500 Life Cycle Delivery Height Weight Cost $ (weeks) (inches) (pounds) 7,755.68 31-33 41 400 13,508.48 31 37 322.2 10,204.60 23 21.8 336 10,117.13 22-24 32 334 8,679.74 39-41 37 328 21,777.75 39-41 41 441 51 800 Life Cycle Delivery 48 625 Life Cycle Delivery Height Weight Cost $ (weeks) (inches) (pounds) 19,546.11 31-33 40.9 529 32,100.62 31 42 507 25,846.76 23 32.7 501 27,302.96 22-24 36 442 21,777.75 39-41 41 441 51 800 Life Cycle Delivery Height Weight Cost $ (weeks) (inches) (pounds) 32,962.44 31-33 40.9 582 53,577.75 31 46 561.74 51,694.18 23 33.1 817 42,535.16 22-24 39 560 40,476.15 39-41 43 551 EXHIBIT A EXHIBIT A Transformer Bid Evaluation Bid Opening: September 6, 2006 Padmount Tax (factor): 1.0775 Primary Winding: 12,000 Volt, Delta Connected No Load Loss $/watt: 3.75 September 6, 2006 Load Loss $/watt: 1.25 Bid Item 1: 150 kVA, 208Y/120 Volt, Three Phase Pad Number of units: 1 65 >2.0 Vendor Unit Extended Price No Load Load No Load Load Cost of Life Cycle Delivery Height Impedance Price $ Price $ w/tax $ _oss (watts.oss (watt: Loss value Loss value Losses $ Cost $ (weeks) (inches) % ERMCo c/o Hees Enterprises, Inc. 5,955.00 5,955.00 6,416.51 323 1594 1,211.25 1,992.50 3,203.75 9,620.26 29-31 49 3.800 WESCO Distribution -San Leandro, CA 7,774.00 7,774.00 8,376.49 332 1242 1,245.00 1,552.50 2,797.50 11,173.99 52 48 2.710 GE Supply 7,485.00 7,485.00 8,065.09 635 2113 2,381.25 2,641.25 5,022.50 13,087.59 22 53.15 3.180 Howard Industries, Inc. 7,980.00 7,980.00 8,598.45 306 1617 1,147.50 2,021.25 3,168.75 11,767.20 18-20 46 2.300 Hughes Supply, Inc. -Pauwels 6,376.00 6,376.00 6,870.14 325 1555 1,218.75 1,943.75 3,162.50 10,032.64 26-28 52 2.120 Hughes Supply, Inc. -Cooper 6,861.00 6,861.00 7,392.73 339 1326 1,271.25 1,657.50 2,928.75 10,321.48 27-29 50 2.940 Central Maloney No Bid Bid Item 2: 225 kVA, 480Y/277 Volt, Three Phase Pad, Number of units: 1 65 >3.5 Vendor Unit Extended Price No Load Load No Load Load Cost of Life Cycle Delivery Height Impedance Price $ Price $ w/tax $ oss (watt:.oss (watt: Loss value Loss value Losses $ Cost $ (weeks) (inches) % ERMCo c/o Hees Enterprises, Inc. 6,990.00 6,990.00 7,531.73 379 2224 1,421.25 2,780.00 4,201.25 11,732.98 29-31 49 5.500 WESCO Distribution -San Leandro, CA 10,290.00 10,290.00 11,087.48 383 1764 1,436.25 2,205.00 3,641.25 14,728.73 52 56 3.890 GE Supply 8,800.00 8,800.00 9,482.00 730 2726 2,737.50 3,407.50 6,145.00 15,627.00 22 50.16 3.940 Howard Industries, Inc. 9,198.00 9,198.00 9,910.85 413 2,130 1,548.75 2,662.50 4,211.25 14,122.10 18-20 51 3.800 Hughes Supply, Inc. -Pauwels 7,664.00 7,664.00 8,257.96 442 1956 1,657.50 2,445.00 4,102.50 12,360.46 26-28 58 3.540 Hughes Supply, Inc. -Cooper 8,266.00 8,266.00 8,906.62 399 1730 1,496.25 2,162.50 3,658.75 12,565.37 27-29 50 3.850 Central Maloney No Bid Bid Item 3: 500 kVA, 480/277 Volt, Three Phase Pad, Number of units: 3 75 >4.0 Vendor Unit Extended Price No Load Load No Load Load Cost of Life Cycle Delivery Height Impedance Price $ Price $ w/tax $ oss (watt:.oss (watt: Loss value Loss value Losses $ Cost $ (weeks) (inches) % ERMCo c/o Hees Enterprises, Inc. 10,638.00 31,914.00 34,387.34 751 3470 8,448.75 13,012.50 21,461.25 55,848.59 29-31 49 5.700 WESCO Distribution -San Leandro, CA 15,242.00 45,726.00 49,269.77 620 3664 6,975.00 13,740.00 20,715.00 69,984.77 52 60 5.230 GE Supply 12,300.00 36,900.00 39,759.75 1359 5406 15,288.75 20,272.50 35,561.25 75,321.00 22 56.89 4.120 Howard Industries, Inc. 14,724.00 44,172.00 47,595.33 802 3786 9,022.50 14,197.50 23,220.00 70,815.33 18-20 61 4.300 Hughes Supply, Inc. -Pauwels 11,878.00 35,634.00 38,395.64 692 3905 7,785.00 14,643.75 22,428.75 60,824.39 26-28 58 4.000 Hughes Supply, Inc. -Cooper 13,099.00 39,297.00 42,342.52 845 2992 9,506.25 11,220.00 20,726.25 63,068.77 27-29 50 4.320 Central Maloney No Bid Transformer Eval 09-15-06_pole.xls 2 RESOLUTION NO. 2006-179 A RESOLUTION OF THE LODI CITY COUNCIL AWARDING THE BIDS FOR THE PURCHASE OF POLEMOUNT AND PADMOUNT TRANSFORMERS WHEREAS, in answer to notice duly published in accordance with law and the order of this City Council, sealed bids were received and publicly opened on September 6, 2006, at 11:00 a.m. for the purchase of polemount and padmount transformers for the Electric Utility Department, described in the specifications therefore approved by the City Council on August 2, 2006; and WHEREAS, said bids have been compared, checked, and tabulated and a report thereof filed with the City Manager as shown on Exhibit A attached; and WHEREAS, the City Manager recommends the award of the bids for the various types and sizes of polemount and padmount transformers for the Electric Utility Department be made to the bidder whose proposal and equipment meet City of Lodi specifications and whose transformers are expected to yield the lowest overall life -cycle costs, listed as follows: Polemounts: 27 ea Electric Research & Manufacturing Cooperative (ERMCO) $35,515.48 Padn-ounts: 5 ea ERMCO $48,335.56 $83,851-06 NOW, THEREFORE, BE IT RESOLVED that the award of the bids for the purchase of polemount and padmount transformers for the Electric Utility Department be and the same is hereby awarded to the lowest responsible bidder, ERMCO, Inc., of Dyersburg, Tennessee, (represented by Hees Enterprises of Astoria, OR) in the total amount of $83,851.06. Dated: October 4, 2006 I hereby certify that Resolution No. 2006-179 was passed and adopted by the City Council of the City of Lodi in a regular meeting held October 4, 2006, by the following vote: AYES: COUNCIL MEMBERS -- Beckman, Hansen, Johnson, Mounce, and Mayor Hitchcock NOES: COUNCIL MEMBERS — None ABSENT: COUNCIL MEMBERS — None ABSTAIN: COUNCIL MEMBERS — None J NNIFER PERRIN Interim City Clerk 2006-179 r -%jMI 4 A EXHIBIT A Transformer Bld Evaluation ®1d Opening: September 6, 21106 Polemaunt rax (factor): 0.0775 Prlfnary Winding: }2,006 Volt Vne4o-Line 9 48 625 No Load Loss Slwatt: 3.75 Vendor L" No Load Load Loss September 6, 2006 No Load LOW Load Loss SAva . 1.26 Vendor Unit Extended Price Loss Loss Bid Nem f: 25kVA,1201240 Volt, Single Phase Conventional Pole Cost of Life Cycle Delivery Number of units: 5 Costs 45 500 wAex S (watts) (watts) No Load Load Cost S (weeks) (inrhes) (pounds) IMGo Fps EMeipiispal'PIC � Vendor Lirsit Extended Price Loss Loss No Load Land Cost of Life Cycle Delivery Height ViAW& 9,078.75 Price $ Price S wltax $ (watts) (watts) Loss value Loss value Losses S Cost $ (weeks) (Inches) (pounds) tV'5. *064*- ` 49 1,... 7 312 12 e_ttl l� � . 3 _ - F' : '. 7,470.OD WESCO Distribution -San Leandro 1,638.00 9,190.00 9,902.23 77 346 1.443.75 2,162.50 . 3,806.25 _ 13,508,48 31 37 322,2 GE Supply 1,328.00 6,640.00 7,154.60 55 323 1,031.25 2,018.75 3,050.00 to,204.60 23 21.8 336 Howard Industries, Inc, 1,270.D0 6,350.00 6,842.13 68 320 1,275.00 2,000,00 3,275.00 10,117,13 22.24 32 334 Central Moloney, Inc. No Bid 80 489 2.706.00 5,501.25 8,201.25 21,777.75 39-41 41 441 Hughes Supply, Inc, -Cooper 1,009.00 5,045.00 8,435.99 49 372 918.75 2,325.00 3,243.75 51879.74 3941 37 328 1314 Nem 2: 37.5kVA, 1201240 Volt, Single Phase Circuit -Protected Pole No Load Number of units: 9 48 625 Vendor L" No Load Load Loss Loss No Load LOW Cost of Life Cycle Vendor Unit Extended Price Loss Loss No Load Load Cost of Life Cycle Delivery Height Weight Costs Price $ Price s wAex S (watts) (watts) Loss value Loss value Losses $ Cost S (weeks) (inrhes) (pounds) IMGo Fps EMeipiispal'PIC � 37,344.00 123 630 VVESCO Distribution -San Leandro 2,374.011 21,386.00 23,021.117 100 50}7 3,875.00 5,703.75 9,078.75 32,100.62 31 42 507 GE Supply 1,1195.00 17,055.00 16,376.76 80 424 2,706.00 4,770.00 7,470.OD 25,844.16 23 32.7 501 Howard Industries. Inc. 2,015.06 16,135.00 19,540.48 92 414 3,105.00 4,657.50 7,762.50 27,302.96 22-24 38 442 Central Mooney, fnc. No INd Howard industries, Inc. -Cooper 1,1920,00 Howard Industries. Inc. .Cooper 1,400.00 12,660.00 13,576.56 80 489 2.706.00 5,501.25 8,201.25 21,777.75 39-41 41 441 Bid Nem 3: 50WA,1201240 Volt, Single Phase Clrcuit•Proteaterd Pok Number of units: 13 51 Wo Transformer Evat 1)9.15-0 jx"-xis 1 No Load Load Vendor L" Extended Plica Loss Loss No Load LOW Cost of Life Cycle Delivery Height Weight Price i Price $ wltax S (watts) (watts) Loss value Loss value Losses $ Costs (weeks) (Inches) (pounds) -` VVESCO Distribution -San Leandro 2,666.00 34,656.00 37,344.00 123 630 5,996.25 10,237.50 16,233.75 53,577.75 31 46 561,74 GE Supply 2,990.00 37,570.00 40,481.68 102 384 4,972.50 6,240.00 11,212.50 $1,694.18 23 33.1 817 Howardlndusgtes. bc. 2054.00 28,702.00 28,771.41 114 505 5,557.50 8,2116.25 13,763.75 42,555.16 22-24 39 560 Central Moloney, Inc. INO Bid Howard industries, Inc. -Cooper 1,1920,00 23,690.00 25,483.65 107 601 5,216.25 9,766.25 14,982.50 40,476.15 3941 43 551 Transformer Evat 1)9.15-0 jx"-xis 1 P_XHIBM EXHI BIT A Transformer Bid Evaluation Padmount September S. 2006 Bid Opening: September 6, 2006 Tex (factor): 1.0775 Primary Winding. 12,000 Volt, Della Connected No Load Loss SAvatt: 3.75 Load Loss Shvatt: 1.25 Bid Item 1: 160 kVA, 20BYl120 Voll, Three Phase Pad '[j,379 2zz�225� Number of units: 1 VJESCO Disubt ion -San Leandro. CA 10,290.00 65 >2.0 Vendor Unit Extended Price No Load Load No Load Load Cost of Lire Cycle Delivery Height Impedance 8,800.00 Price $ Price $ witax $ oss (watts.oss (watts Loss value Loss value Losses S Cost $ (weeks) (inches) 96 RlylCt rJ pelf �ii1e+P�; .: r - ' k,5� alt .z4155btl �a' ,d4 los_,:_ 324' ' ("'11,44'a_._ ...Qlt ....`. vvEt3C0 olstrilwtion -Son Leandro, CA 7,774.00 7,774.00 8,376.49 332 1242 1,245.00 1,552.50 2,797.50 11,173.99 52 48 2.710 GE Supply 7,485.00 7,465.00 6,065.09 635 2113 2,381.25 2,841,25 5,022.50 13,087,59 22 53.15 3.t80 Howard Industries, Inc. 7,980.00 7,980.00 8,898.45 306 1617 1,147.50 2,021.25 3,168.75 11,767.20 18.20 46 2.300 Hughes Supply, Inc.-Pauwals 6,378.00 6,376.00 6,476.14 325 1555 1,218.75 1,943,75 3,182.50 10,032.64 26.28 52 2.120 Hughes Supply, Inc. -Cooper 6,861.00 6,851.00 7,392.73 339 1326 1,271.25 1,857.50 2,928.75 10,321.46 27-29 50 2.940 Central Maloney No Bid Bid Item 2: 225 kVA, 480Y1277 Volt, Three Phase Pad, Number of units: 1 65 >3.5 Vendor Unit Extended Price No Load Load No Load Load Cost of Life Cycle Delivery Height Impedance Pfice $ Price S w/tax S oss (wattt oss (watts Loss value Loss value Losses S Cost $ (weeks) (inches) % Bid Item 3: 500 kVA, 4601277 Volt, Three Phase Pad, Number of units: 3 75 >4.0 Vendor UM Extended Price No Load Load No Land Load Cost of Lffe Cycle Delivery Height Impedance Price $ Price $ w/tax S oss (watttoss (watts Loss value Loss value Losses S Coat $ (weeks) (inches) % iFs ',W '[j,379 2zz�225� VJESCO Disubt ion -San Leandro. CA 10,290.00 10,290.00 11,067,46 383 1764 1,436.25 2,205.00 3,541,25 14,726.73 52 58 3.890 GE Supply 8,800.00 8,800.00 9,482.00 730 2726 2,737.50 3,407.50 6,145.00 15,627.00 22 50.16 3.940 Howardlndusirtes,Inc. 9,198.00 9,198,00 9,910.85 413 2,130 1,548.75 2,662.50 4,211.25 14,122.10 18-20 51 3.800 Hughes Supply. Inc. -Pauwals 7,664.00 7,664.00 8,257.96 442 1956 1,657.50 2,445.00 4,102.50 12,360.46 26-28 58 3.540 Hughes Supply, Inc. -Cooper 8,266.00 6,288.00 8,906.62 399 1730 1,496.25 2,162.50 3,656.75 12,566.37 27.29 5o 3.850 Central Maloney No Bid Bid Item 3: 500 kVA, 4601277 Volt, Three Phase Pad, Number of units: 3 75 >4.0 Vendor UM Extended Price No Load Load No Land Load Cost of Lffe Cycle Delivery Height Impedance Price $ Price $ w/tax S oss (watttoss (watts Loss value Loss value Losses S Coat $ (weeks) (inches) % iFs ',W 751 < Pg' WESCO Distribution -San Leandro, CA 15,242.00 45,726.00 49,269.77 620 3664 6,975.00 13,740.00 20,715.00 69,984.77 52 60 5.230 GE Supply 12,300.00 36,900.00 39,759.76 13% 5408 15,288.75 20,272.50 35,561.25 75,321.00 22 56.89 4.120 Howard Industries, Inc. 14,724.00 44,172,00 47,595.33 802 3786 9,022.50 14,197.50 23,220.00 70,615.33 18.20 61 4.300 Hughes Supply, Inc.-Pauwels 11,878.00 35,634.00 38,385.84 692 3905 7,785.00 14,643.75 22,428.75 50,824.39 26.26 58 4.000 Hughes Supply. Inc. -Cooper 13,099.00 39,297.00 42,342.52 845 2992 9,500.25 11,220.00 20,726.25 63,068.77 27-29 50 4.320 Central Maloney No Bid Trwmbrmor Erol 0945-M— sale." Ai