AGENDA TITLE: Public Hearing to introduce ordinance amending Chapter 13.20, "Electrical
Service," by amending Section 13.20.225 Schedule NEM (Net Energy
Metering) and adding Section 13.20.227 establishing Schedule CEM (Co-
Energg Metering Rider), both applicable to qualified, customer-hw011ed soler
and mid electric generation to become effiective on November 1, 2006 (EUO)
MEETIIG DATE: September 20, 2006
PREPARED BY: Electric Utility Director
RECO111111IAENDED ACTION: That the City Council by ordinance amend Chapter 13.20, "Electrical
Service," by amending section 13.20,225 Schedule NEM (Net
Energy Metering) and adding Section 13.20.227 establishing
Schedule CEM (Co -Energy Metering Rider), both applicable to qualified, customer -installed solar and
wind electric generation. It is recommended these changes become effective November 1, 2006.
BACKGROUND IWORMATION: In June 2003, the City adopted the Net Energy Metering Schedule,
NEM. The City of Lodi is required by State of California legislation,
Assembly Bill 58 and Senate Bill 1, to offer customers who install
qualified solar and wind generation, 10 kilowatts (KW) or less in size, a "net metering" rate. Net metering
measures the difference between the electricity supplied by the City through the electric grid and the
electricity generated by a customer -generator with credit being applied at the retail rate.
This same legislation allows for municipally owned utilities to establish a "co -metering" rate for those
customer -generators that install units larger than 10 kW. Electricity consumed by the customer will be
billed at the applicable retail rate while the electricity generated will be credited to the customer -generator
in an amount equal to the generation component of the applicable rate schedule. The generation
component of the applicable rate is proposed to be one-half (1 /2) of the applicable net energy charges.
When the NEM rate schedule was adopted in 2003, the co -energy metering component was not
included. Implementing a new co -metering schedule also requires making changes to the net metering
schedule.
The key changes being proposed under this ordinance are summarized as follows:
• The existing Net Energy Metering Schedule (NEM) is being modified to (i) apply only to qualified
customer generation of 10 KW or less, (ii) clarify that Customer Charges and Public Benefits
costs are "non -bypassable" and (iii) limit the amount of annual generation purchased by EUD from
a customer -generator to the amount of that customer's electrical usage during a year; and
APPROVED: i`ZDa,
Blair King, City Manager
BI 91.1 a11d Ian � ��� ►
Rid�rl, solar and wind etedit Owma on Io become eMMOM an
N 1,
S"W"WW3k2M
Pale 2 W2
Md a nwvC Meie�rirlg Scrradule (CIE* which Io quad cuska r en Dr
grru�ferOV. Thin schedule provides that to amount or the amt EUD provided for
wed ebc*jc generation under this schedule is equal to one-half (112) of the appy not
orgy chaff undet the rvW rate schedule applicable to that customer.
As notal l earlier in this Council Communication, these charges are intended to make EUD's rate
sc heclubs for the purchase df geaNied solarAvmd energy from customers consistent with amicable state
law and sound business pra dices.
The pn*ossd DIEM and CEM electric rate schedules are attached fbr consideration.
FISCAk iWPO=: The a*Nm of a Co-Enorgy MsterhV Rider will reduce payments by to Electric
Utility Departrnerd for solar and wind wwW generated by Marge (greater than
10kW) customer -owned facilities to a level generally consistent with market power
maximum alternatives.
Prepares By: Sondra Huff, Sr. Rate Analyst
GFWSHA.0
MOW ne
C: City Aporney
CITY OF LODE
ELECTRIC UTILITY DEPARTMENT
SCHEDULE NEM
NET ENERGY METERING RIDER
The purpose of this rider is to establish rates, terms and conditions for providing net
metering service to residential and small commercial customers generating electricity using
solar and wind facilities of 10 kW or less in size. This rider complies with California State
legislation requiring every electric utility in the state, including municipally owned utilities, to
develop a standard contract or tariff providing for residential and small commercial net
energy metering, as defined below.
AP l TY:
This schedule is applicable to service for customers where a part or all of the electrical
requirements of the customer can be supplied from a solar or wind power production
source owned and operated by the customer (customer -generator). Customer -generators
must currently be served under Lodi's residential rate schedules, or small commercial (G1
and G2) rate schedules. Availability of this schedule to eligible customer -generators wiH be
on a first-come, first -serve basis and will be available until such time the total rated
generating capacity used by eligible customer -generators equals two and one-half percent
(2.5%) of the City of Lodi aggregate customer annual peak demand.
The solar or wind generation source must_ 1.) have a capacity of 10kW or less, 2.) be
located on the customer -generators premises, 3.) be connected for parallel operation with
Lodi's distribution facilities, and 4.) be intended for the sole purpose of offsetting a part or
all of the customer -generator's own electrical requirements. In no case shall the power or
energy generated by the customer -owned solar or wind source be available for resale,
except as specified under this rider.
Additional terms and conditions for service, including terms of interconnection and parallel
operation, are specified in a customer -specific Photovoltaic (PV) Electrical Interconnection
Agreement and Net Metering Payment Agreement.
Charges for electricity supplied by the City will be based on metered usage in accordance
with Special Condition (c) below. Rates charged under this schedule wfil be in accordance
with the eligible customer -generator's otherwise applicable residential or small commercial
(G1 and G2) rate schedules. Public Benefit charges and monthly customer changes shall
not be by -passable.
Effective November 1, 2006
NEM -113 Ordinance No.
CITY OF LODI
ELECTRIC UTILITY DEPARTMENT
SCHEDULE NEM
NET ENERGY METERING RIDER
(a) Ofr Mr rr 0% A signed Photovoltaic (PV) Electrical Interconnection
Agreement and Net Metering Payment Agreement between the customer -
generator and the City is required for service under this schedule.
(b) MWdna Eauiiorn M Net energy metering shall be accomplished using a
single meter capable of registering the flow of electricity in two directions. If
customer's existing electrical meter is not capable of measuring the flow of
electricity in two directions, the customer -generator shall be responsible for
all expenses involved in purchasing and installing a meter that is capable of
measuring electricity in both directions. If an additional meter or meters are
desired by the City to monitor the electric generating system performance,
the cost to install these meters will be the responsibility of the City.
(c) Ng Erway Meftrinn and_8NI� Net Energy is defined as measuring the
difference between the electricity supplied by the City through the electric
grid to the eligible customer -generator and electricity generated by an
eligible customer -generator and fed back into the electric grid over a 12 -
month period.
In the event that the electricity supplied by the City during the 12 -month
period exceeds the electricity generated by the eligible customer -generator
during the same period, the eligible customer is a net electricity consumer
and the City shall bill the customer for the net consumption during the 12 -
month period based on the retail price per kilowatt-hour for eligible
customer -generator's rate class over the same period.
The City shall provide the customer -generator with net electricity
consumption information on each regular bill. That information shall include
the current amount owed to the City for the net electricity consumed.
Customer -generator may exercise the option to pay monthly for the net
energy consumed, but in any event shall be responsible for any payments
due at the end of each 12 -month period.
Effective November 1, 2006
NEM -713 Ordinance No.
CITY OF LODI
ELECTRIC UTILITY DEPARTMENT
SCHEDULE NEM
NET ENERGY METERIN RIDER
(d) EAM Ener: Net energy metering will be administered on an
annualized basis, beginning with the month of interconnection of the
customer's generating system with the City's electrical system. Electric
generation production may result in a dollar credit carrying forward to the
next billing period. ff a credit accumulation results in a net customer -owned
generation credit at the end of the annualized year, unused dollar credits will
be set to zero and not be carried into the new annualized year.
(e) Rtd" and Remlabms: Other conditions as specified in the City of Lodi
Electric Utifl#y Department's Rules, Regulations and Engineering Standards
shall apply to this electric rate schedule.
Effective November 1, 2006
NEM -313 Ordinance No.
_ .� 4
CITY OF LODI
ELECTRIC UTILITY DEPARTMENT
SCHEDULE CEM
CO -ENERGY METERING RIQER
The purpose of dus rider is to estabfish rates, terms and conditions for providing co -energy
metering service to customers generating electricity using solar and wind facillities greater
than 10 kW and less than 1 MW in size. This rider complies with California State
legislation allowing municipally owned utilities to develop a standard contract or tariff
providing for residential and small commercial (G1 and G2) co -energy metering, as defined
below.
This schedule is applicable to service for customers where a part or all of the electrical
requirements of the customer can be supplied from a solar or wind power production
source owned and operated by the customer (customer -generator). Customer -generators
must currently be served under Lodi's residential and small commercial (G1 and G2) rate
schedules. Availability of this schedule to eligible customer -generators will be on a first-
come, first -serve basis and will be available until such time the total rated generating
capacity used by eligible customer -generators equals two and one-half percent (2.5%) of
the City of Lodi aggregate customer annual peak demand.
The solar or wind generation source must: 1) be rated greater than 10 kW and not more
than 1 MW, 2) be located on the customer -generators premises, 3) be connected for
parallel operation with Lodi's distribution facilities, and 4) be intended for the sole purpose
of offsetting a part or all of the customer -generator's own electrical requirements. In no
case shall the power or energy generated by the customer -owned solar or wind source be
available for resale, except as specked under this rider.
Additional terms and conditions for service, including terms of interconnection and parallel
operation, are specified in a customer -specific Photovoltaic (PV) Electrical Interconnection
Agreement and Net Metering Payment Agreement.
RATEs:
Charges for electricity supplied by the City will be based on the co -metered usage in
accordance with Special Conditions (c), (d) and (e) below. Rates charged under this
schedule will be in accordance with the eligible customer -generator's otherwise applicable
residential or small commercial (G1 and G2) rate schedule. Public Benefit charges and
monthly customer charges shall not be by -passable.
Effective November 1, 2006
CEM -113 Ordinance No.
CITY OF LODI
ELECTRIC UTILITY DEPARTMENT
SCHEDULE CEM
CG -ENERGY METERING RIDER
Eby S The metered electricity supplied by the City to the
customer-ganerator over the applicable billing period will be billed at the applicable
service rate in effect when the service was rendered. All conditions, charges,
adjustments and taxes under the applicable rate schedule shall be in effect.
Emmy Tri Chit The metered electricity generated by the customer -
generator and supplied to the City over the applicable billing period will be credited
at a rate equal to the generation component of the applicable rate schedule. The
generation component shall be one-half (112) of the net Energy Charge (adjusted for
Market Cost Adjustment, Voltage Discount and Community Benefits Incentive
Discount, as applicable) of the customer -generator's applicable rate schedule.
(a) O,ftr �Agn@MUnft: A signed Photovoltaic (PV) Electrical Interconnection
Agent and Net Metering Payment Agreement between the customer -
generator and the City is required for service under this schedule.
(b) Meie� rim Equ a* Co -energy metering shall be accomplished using two
meters — the customer revenue meter of record and a separate generation
meter. The customer -generator shall be responsible for all expenses involved in
purchasing and installing required meters. If an additional meter or meters are
desired by the City to monitor the electric generating system performance, the
cost to install these meters will be the responsibility of the City.
(c) Co -EMM Marina: Co -Energy metering is defined as the dual measurement
of (i) the electricity supplied by the City through the electric grid to the eligible
customer -generator and (ii) the electricity generated by an eligible customer -
generator from the customer -owned solar or wind source.
(d) CO -Ey Bing: The customer -generator shall receive a "net bill' from the
City for each billing period. The co -energy metering net billing calculation shall
be composed of the Energy Supplied Charges less the Energy Transmitted
Credit.
All net charges are due at the time of billing. Electric generation production may
result in a dollar credit carrying forward to the next billing period, subject to
Special Condition (e) below.
Effective November 1, 2006
CEM -213 Ordinance No.
CITY OF LODI
ELECTRIC UTILITY DEPARTMENT
SCHEDULE CEM
CQ --ENERGY METERING RIDER
(e) Ex2M ROMX; Co -energy metering will be administered on an annualized
basis, beginning with the month of interconnection of the customer's generating
system with the City's electrical system. Electric generation production may
result in a dollar credit carrying forward to the next billing period. If a credit
accumulation results in a net customer -owned generation credit at the end of
the annualized year, unused dollar credits will be set to zero and not be carried
into the new annualized year.
(f) RuWs.mW Ramisfim: Other conditions as specified in the City of Lodi
Electric Utility Departments Rules, Regulations and Engineering Standards
shall apply to this electric rate schedule.
Effective November 1, 2006
CEM -313 Ordinance No.
ORDINANCE NO.
AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF 11*P44A;?k
LODI AMENDING TITLE 13, CHAPTER 13.20, "ELECTRICAL
SERVICE," BY REPEALING AND REENACTING SECTION
13.20.225 SCHEDULE NEM — NET ENERGY METERING
RIDER; AND ADDING SECTION 13.20.227 SCHEDULE CEM —
CO -ENERGY METERING RIDER
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF LODI AS FOLLOWS:
SE TION 1. Section 13.20.225 Schedule NEM — Net Energy Metering is hereby repealed
and reenacted to read as follows:
PUILPQM:
The purpose of this rider is to establish rates, terms and conditions for providing net
metering service to residential and small commercial customers generating electricity
using solar and wind facilities of 10 kW or less in size. This rider complies with
California State legislation requiring every electric utility in the state, including
municipally owned utilities, to develop a standard contract or tariff providing for
residential and small commercial net energy metering, as defined below.
APPLICA#3ILITY:
This schedule is applicable to service for customers where a part or all of the electrical
requirements of the customer can be supplied from a solar or wind power production
source owned and operated by the customer (customer -generator). Customer -
generators must currently be served under Lodi's residential rate schedules, or small
commercial (G1 and G2) rate schedules. Availability of this schedule to eligible
customer -generators will be on a first-come, first -serve basis and will be available until
such time the total rated generating capacity used by eligible customer -generators
equals two and one-half percent (2.5%) of the City of Lodi aggregate customer annual
peak demand.
The solar or wind generation source must: 1.) have a capacity of 10kW or less, 2.) be
located on the customer -generator's premises, 3.) be connected for parallel operation
with Lodi's distribution facilities, and 4.) be intended for the sole purpose of offsetting a
part or all of the customer -generator's own electrical requirements. In no case shall the
power or energy generated by the customer -owned solar or wind source be available for
resale, except as specified under this rider.
Additional terms and conditions for service, including terms of interconnection and
parallel operation, are specified in a customer -specific Photovoltaic (PV) Electrical
Interconnection Agreement and Net Metering Payment Agreement.
RAS:
Charges for electricity supplied by the City will be based on metered usage in
accordance with Special Condition (c) below. Rates charged under this schedule will be
in accordance with the eligible customer -generator's otherwise applicable residential or
small commercial (G1 and G2) rate schedules. Public Benefit charges and monthly
customer charges shall not be by -passable.
SPI CIAL CONDITIONS:
(a) Otber Ag eellnents: A signed Photovoltaic (PV) Electrical
Interconnection Agreement and Net Metering Payment Agreement
between the customer -generator and the City is required for service
under this schedule.
(b) MOrina Eauiorrmt: Net energy metering shall be accomplished using
a single meter capable of registering the flow of electricity in two
directions. If customer's existing electrical meter is not capable of
measuring the flow of electricity in two directions, the customer -generator
shall be responsible for all expenses involved in purchasing and installing
a meter that is capable of measuring electricity in both directions. If an
additional meter or meters are desired by the City to monitor the electric
generating system performance, the cost to install these meters will be
the responsibility of the City.
(c) Net Energy Metering and Billing: Net Energy is defined as measuring
the difference between the electricity supplied by the City through the
electric grid to the eligible customer -generator and electricity generated
by an eligible customer -generator and fed back into the electric grid over
a 12 -month period.
In the event that the electricity supplied by the City during the 12 -month
period exceeds the electricity generated by the eligible customer -
generator during the same period, the eligible customer is a net electricity
consumer and the City shall bill the customer for the net consumption
during the 12 -month period based on the retail price per kilowatt-hour for
eligible customer -generator's rate class over the same period.
The City shall provide the customer -generator with net electricity
consumption information on each regular bill. That information shall
include the current amount owed to the City for the net electricity
consumed. Customer -generator may exercise the option to pay monthly
for the net energy consumed, but in any event shall be responsible for
any payments due at the end of each 12 -month period.
(d) Excess Energy: Net energy metering will be administered on an
annualized basis, beginning with the month of interconnection of the
customer's generating system with the City's electrical system. Electric
generation production may result in a dollar credit carrying forward to the
next billing period. If a credit accumulation results in a net customer -
owned generation credit at the end of the annualized year, unused dollar
credits will be set to zero and not be carried into the new annualized year.
(e) Rules and Reaulations: Other conditions as specified in the City of Lodi
Electric Utility Department's Rules, Regulations and Engineering
Standards shall apply to this electric rate schedule.
SE TI N 2. Section 13.20.227 — Schedule CEM - Co -Energy Metering Rider is hereby
addled to read as follows:
The purpose of this rider is to establish rates, terms and conditions for providing co -
energy metering service to customers generating electricity using solar and wind
facilities greater than 10 kW and less than 1 MW in size. This rider complies with
California State legislation allowing municipally owned utilities to develop a standard
contract or tariff providing for residential and small commercial (G1 and G2) co -energy
metering, as defined below.
APPLICAiBIILITY:
This schedule is applicable to service for customers where a part or all of the electrical
requirements of the customer can be supplied from a solar or wind power production
source owned and operated by the customer (customer -generator). Customer -
generators must currently be served under Lodi's residential and small commercial (G1
and G2) rate schedules. Availability of this schedule to eligible customer -generators will
be on a first-come, first -serve basis and will be available until such time the total rated
generating capacity used by eligible customer -generators equals two and one-half
percent (2.5%) of the City of Lodi aggregate customer annual peak demand.
The solar or wind generation source must: 1) be rated greater than 10 kW and not more
than 1 MW, 2) be located on the customer -generator's premises, 3) be connected for
parallel operation with Lodi's distribution facilities, and 4) be intended for the sole
purpose of offsetting a park or all of the customer -generator's own electrical
requirements. In no case shall the power or energy generated by the customer -owned
solar or wind source be available for resale, except as specified under this rider.
Additional terms and conditions for service, including terms of interconnection and
parallel operation, are specified in a customer -specific Photovoltaic (PV) Electrical
Interconnection Agreement and Net Metering Payment Agreement.
RATES:
Charges for electricity supplied by the City will be based on the co -metered usage in
accordance with Special Conditions (c), (d) and (e) below. Rates charged under this
schedule will be in accordance with the eligible customer -generator's otherwise
applicable residential or small commercial (G1 and G2) rate schedule. Public Benefit
charges and monthly customer charges shall not be by -passable.
Energy Sw _ Ip ied Charges: The metered electricity supplied by the City to the
customer -generator over the applicable billing period will be billed at the
applicable service rate in effect when the service was rendered. All conditions,
charges, adjustments and taxes under the applicable rate schedule shall be in
effect.
Energy Tr3nsmiitted Credit: The metered electricity generated by the customer -
generator and supplied to the City over the applicable billing period will be
credited at a rate equal to the generation component of the applicable rate
schedule. The generation component shall be one-half (112) of the net Energy
Charge (adjusted for Market Cost Adjustment, Voltage Discount and Community
Benefits Incentive Discount, as applicable) of the customer -generator's applicable
rate schedule.
SPOCIAL CONDITIONS;
(a) Other AaMMnts: A signed Photovoltaic (PV) Electrical Interconnection
Agreement and Net Metering Payment Agreement between the customer -
generator and the City is required for service under this schedule.
(b) Mete fto Equipment: Co -energy metering shall be accomplished using two
meters — the customer revenue meter of record and a separate generation
meter. The customer -generator shall be responsible for all expenses
involved in purchasing and installing required meters. If an additional meter
or meters are desired by the City to monitor the electric generating system
performance, the cost to install these meters will be the responsibility of the
City.
�c) Co-Eotrgy Metering Co -Energy metering is defined as the dual
measurement of (i) the electricity supplied by the City through the electric grid
to the eligible customer -generator and (ii) the electricity generated by an
eligible customer -generator from the customer -owned solar or wind source.
(d) Co-E!Wrgy Billing: The customer -generator shall receive a "net bill" from
the City for each billing period. The co -energy metering net billing calculation
shall be composed of the Energy Supplied Charges less the Energy
Transmitted Credit.
All net charges are due at the time of billing. Electric generation production
may result in a dollar credit carrying forward to the next billing period, subject
to Special Condition (e) below.
(e) Excel Energy: Co -energy metering will be administered on an annualized
basis, beginning with the month of interconnection of the customer's
generating system with the City's electrical system. Electric generation
production may result in a dollar credit carrying forward to the next billing
period. If a credit accumulation results in a net customer -owned generation
credit at the end of the annualized year, unused dollar credits will be set to
zero and not be carried into the new annualized year.
(f) Rules and Regulations: Other conditions as specified in the City of Lodi
Electric Utility Department's Rules, Regulations and Engineering Standards
shall apply to this electric rate schedule.
SE ION 3. All ordinances and parts of ordinances in conflict herewith are repealed insofar
as such conflict may exist.
SE2TION 4. No Mandatory Duty of Care. This ordinance is not intended to and shall not be
construed or given effect in a manner which imposes upon the City, or any officer or employee
thereof, a mandatory duty of care towards persons or property within the City or outside of the
City so as to provide a basis of civil liability for damages, except as otherwise imposed by law.
SE TION 5. Severability. If any provision of this ordinance or the application thereof to any
person or circumstances is held invalid, such invalidity shall not affect other provisions or
applications of the ordinance which can be given effect without the invalid provision or
application. To this end, the provisions of this ordinance are severable. The City Council
hereby declares that it would have adopted this ordinance irrespective of the invalidity of any
particular portion thereof.
4
5E , I N 6. This ordinance shall be published one time in the "Lodi News -Sentinel," a daily
newspaper of general circulation printed and published in the City of Lodi, and shall take effect
thirty days from and after its passage and approval.
Approved this day of , 2006
SUSAN HITCHCOCK
Mayor
Attest:
JENNIFER M. PERRIN
I ntewim City Clerk
State of California
County of San Joaquin, ss.
I, Jennifer M. Perrin, Interim City Clerk of the City of Lodi, do hereby certify that
Ordinance No. was introduced at a regular meeting of the City Council of the City of Lodi
held September 20, 2006, and was thereafter passed, adopted and ordered to print at a regular
meeting of said Council held , 2006, by the following vote:
AYES:
COUNCIL MEMBERS —
NOES;
COUNCIL MEMBERS —
ABSENT:
COUNCIL MEMBERS —
ABSTAIN:
COUNCIL MEMBERS —
1 further certify that Ordinance No. was approved and signed by the Mayor on the
date of its passage and the same has been published pursuant to law.
JENNIFER M. PERRIN
Interim City Clerk
Approved as to Form:
4
D. STEPH CHWABAU
City Attorney
Please immediately confirm receipt
of this far by calling 333-6702
CI'T'Y OF LODI
P. O. BOX 3006
LODI, CALIFORNIA 95241-1910
ADVERTISING INSTRUCTIONS
Su SCT: changes to the Net Energy Metering Rate — Schedule NEM and
establish the new Co -Energy Metering Rider — Schedule CEM Ordinances (EUD)
PUBLISH DATE: Saturday September 9, 2006
TEAR SHEETS WANTED: Three (3) please
SEND AFFIDAVIT AND BILL TO: JENNIFER M. PERRIN, INTERIM CITY CLERK
City of Lodi
P.O. Box 3006
Lodi, CA 95241-1 91 0
DATED: Thursday September 7, 2006
ORDERED BY:
JENNIFER M. PERRIN, CMC
INTWIM CITY CLERK
DANA R. CHAPMAN
ADMINISTRATIVE CLERK
JENNIFER M. PERRIN
INTERIM CITY CLERK
JACQUELINE L. TAYLOR, CMC
DEPUTY CITY CLERK
forms\advins.doc
DECLARTI }N OF POSTINg
changes to the Net Energy Metering Rete - Schedule NEM and establish
the rww Cc -Energy Metering Rider - Schedule CEM Ordinances (EUD)
On Friday, September 8, 2006, in the City of Lodi, San Joaquin County, California,
changes to the Net Energy Metering Rate — Schedule NEM and establish the new Co -
Energy Metering Rider -- Schedule CEM Ordinances (EUD), was posted at the following
locations:
Lodi Public Library
Lodi City Clerk's Office
Lodi City Hall Lobby
Lodi Carnegie Forum
I declare under penalty of perjury that the foregoing is true and correct.
Executed on September 8, 2006, at Lodi, California.
JENNIFER M. PERRIN, CMC
INTERIM CITY CLERK
IdA R. CkAPMAN
ADMINISTRATIVE CLERK
N:1Administration\CLERK\Fofms\DECPOSTEUD2.DOC
N: ■ 410VOTAN
JENNIFER M. PERRIN
INTERIM CITY CLERK
JACQUELINE L. TAYLOR, CMC
DEPUTY CITY CLERK
CITY OF LODI
Carnegie Forum
305 West Pine Street, Lodi
LDote:
OTICE OF PUBLIC HEARING
eptember 20, 2006
00 p.m.
For information regarding this notice please contact:
Jennifer M. Perrin
Interim City Clerk
Telephone: (209) 333-6702
NOTICE OF PUBLIC HEARING
NOTICE IS HEREBY GIVEN that on Wednesday, September 20, 2006 at the hour of 7:00 p.m., or as soon
thereafter as the matter may be heard, the City Council will conduct a public hearing at the Carnegie Forum,
305 West Pine Street, Lodi, to consider the following matter:
a) changes to the Net Energy Metering Rate — Schedule NEM and establish the new Co -Energy
Metering Rider — Schedule CEM Ordinances
Information regarding this item may be obtained in the Electric Utility Department, 1331 S. Ham Lane, Lodi,
(209) 333-6762. All interested persons are invited to present their views and comments on this matter.
Written statements may be filed with the City Clerk, City Hall, 221 W. Pine Street, 2"d Floor, Lodi, 95240 at
any time prior to the hearing scheduled herein, and oral statements may be made at said hearing.
If you challenge the subject matter in court, you may be limited to raising only those issues you or someone
else raised at the public hearing described in this notice or in written correspondence delivered to the City
Clerk, 221 West Pine Street, at or prior to the close of the public hearing.
By Order of the Lodi City Council:
er M. Pe
nteft City Clerk
Doted: September 6, 2OD6
Approved as to form:
D. SpESchwabauer
City Attorney
CLER"USHEARWOTICES4MMU AM W7A6