HomeMy WebLinkAboutAgenda Report - September 6, 2006 E-13 PHAGENDA ITEM E15 j&% CITY OF LODI COUNCIL COMMUNICATION TM AGENDA TITLE: Set Public Hearing for October 4, 2046, to Consider Resolution Establishing Area of Benefit and Reimbursable Costs for Lower Sacramento Road (Kettleman Lane to Harney Lane) Improvements MEETING DATE: September 6, 2006 PREPARED BY: Public Works Director RECOMMENDED ACTION: That the City Council set a public hearing for October 4, 2006, to consider a resolution establishing an Area of Benefit and Reimbursable Costs for Lower Sacramento Road (Kettleman Lane to Harney Lane) Improvements benefiting the parcels shown on Exhibit A. BACKGROUND INFORMATION: As part of the City's Lower Sacramento Road (Kettleman Lane to Harney Lane) project, the City designed and installed public improvements that included a traffic signal and underground utility improvements in Lower Sacramento Road between Kettleman Lane and Harney Lane. As part of the County's Harney Curve project, the City paid for the installation of underground utility improvements in Harney Lane to and across the Lower Sacramento Road/ Harney Lane intersection. Both projects included improvements that benefit the adjacent parcels and would be required to be installed at the time of development of those parcels. Both projects are now complete. The improvements included the installation of water pipe, water service stubs, sewer pipe, sewer service stubs, industrial and domestic sewer pipe, traffic signal modifications at Kettleman Lane, a new traffic signal at Century Boulevard, and appurtenant structures and facilities. The benefiting properties are shown on Exhibit A as the Area of Benefit. The developer of the Vintage Oaks subdivision has paid the reimbursable costs for that project as well as the adjacent parcels to the north (APN 058-230-05) and south (APN 058-230-04) under the terms of the improvement agreement for that project. As a result, those properties are excluded from the Area of Benefit as shown on Exhibit A. The parcel at the corner of Century Boulevard and Lower Sacramento Road (APN 058-030-06), owned by Howard Investments, is already developed and, as such, has not been assigned benefit of the improvements. However, should redevelopment of that parcel be applied for, the full reimbursement of the Southwest Gateway obligation would be required if not already paid. This is not expected to occur. Pursuant to Lodi Municipal Code (LMC) Section 16.40.030, the costs of improvements installed by the City that benefit adjacent properties and would be required of the properties upon development are reimbursable to the City. A summary by category of reimbursable improvements for each parcel is APPROVED: /•..- Blair King, City Manager - J',DEV SERV1CCSetPHAreaoiBenefiiLwrSaC.doo 813112006 Set Public Hearing for October 4, 2006, to Consider Resolution Establishing Area of Benefit and Reimbursable Costs for Lower Sacramento Road (Kettleman Lane to Harney Lane) Improvements September 6, 2006 Page 2 provided in Exhibit B. This exhibit also provides an explanation of how the benefit was determined for each category. The reimbursable costs for each of the benefiting properties have been calculated and are shown in Exhibit C. The total reimbursement to the City is calculated to be $780,700. Payment of reimbursement costs will be a condition of approval for any future complete applications for entitlements, including development plans, development agreements, tentative subdivision maps, lot line adjustments, dedications to public agency, and/or final maps for the benefiting parcels. For payment collection purposes, some of the benefiting parcels have been segregated into the following groups as shown on Exhibit B. The groups and the total reimbursement (rounded) for each group is listed below (note the parcels on Harney Lane east of Lower Sacramento Road are not grouped, hence the sum of the figures below do not equal the above total). 1. Lodi Shopping Center $86,750 2. Olive Drive Group $35,560 3. Peterson Group $116,560 4. Southwest Gateway Group $460,700 Total reimbursement costs for all parcels within a given group will be payable at the time of development of the first parcel in that group. For example, in the case of the Olive Drive Group, the full reimbursement costs for all parcels within that group will be due at the time of development of the first parcel in the group. Pursuant to LMC Section 15.64.080, the reimbursable amount will be adjusted annually to include an amount attributable to interest, which will be based on the change in the Engineering News Record (ENR) 20 Cities Construction Cost Index from January 1, 2006 to January 1s' of the year of reimbursement. The beginning ENR index is 7660. In conformance with LMC 16.40, staff recommends that Council set a public hearing to establish an Area of Benefit and Reimbursable Costs to recover the cost of improvements constructed with the Lower Sacramento Road (Kettleman Lane to Harney Lane) project that benefit adjacent properties. FISCAL IMPACT: Not applicable. FUNDING AVAILABLE: Not applicable. um�R JW Richard C. Prima, Jr. Public Works Director Prepared by Sharon A. Welch, Senior Civil Engineer RCP/SAW/pmt Attachments CC, Senior Civil Engineer Welch ,associate Civil Engineer Lindseth Associate Civil Engineer Chang Property Owners i %,DEV SERV\CCSetPHAreaofBenefitLwrSac.doc a131l2W6 ow CITY OF LODIPUBLIC WORKS DEPARTMENT Exhibit A AREA OF BENEFIT LOWER SACRAMENTO RD KETTLEMAN TO HARNEY ®AREA OF IMPROVEMENTS SITE NO. APN ACREAGE 1 058-030-13 9.26 AC. 2 058.030-03 87.72 AC. 3 058-030-04 1.03 AC. 4 058-030-05 8.17 AC. 5 058-030-06 1.53 AC. 6 058-040-01 39.09 AC. 7 058-040-02 39.07 AC. 8 058-040-04 14.28 AC. 9 058-040-05 5.41 AC. 10 058-070-07 1.13 AC. 11 058-070-08 1.14 AC. 12 058-070-09 1.21 AC. 13 058-140-04 1.03 AC. 1405&140 05 1.47 AC. _ .. 15 058-140-06 0. 16 058-140-07 0.72 AC. 17 058-140-08 0.70 AC. 18 05&140-09 0.36 AC. 19 05&140-10 0.36 AC. 20 OSB -140-11 0.59 AC. 21 058-140-12 19.50 AC. 14¢14._ 2.30 AC. 23 058-140-52 19.40 AC. 24 058-230-06 0.46 AC. 26 05&230-07 0.46 AC, 26 05&230-0e 0.46 AC. 21 3 2 4 23 5 6 DeBertedetti Park c 7 8 9 F a .tomm, . 1 M111111111 Exhlblt B Notes: 1 Water pipes installed along the frontage of parcel was allocated 50% to each parcel based upon frontage length. Some valve costs were assigned to benefitting parcels. 2 Water service stubs were installed beyond the edge of pavement and costs were assigned based upon the length of the stub and included blowoff valve and some valve casts. 3 Sewer pipes installed along the frontage of parcels was allocated 50% to each parcel based upon frontage length. 4 Sewer service stubs were installed beyond the edge of pavement and costs were assigned based upon the length of the stub and included manhole oasts when only required to install the stub. 5 Domesllic sewer crossing at Century Blvd. assigned 100% to adjacent parcel west side of Lower Sacramento Rd. 6 Storm drain crossing at Century Blvd. assigned 100% to adjacent parcel west side of Lower Sacramento Rd. 7 Storm drain stub installed at frontage and costs are based upon the length of the pipe installed. 8 Indusbfal waste realignment assigned to adjacent Van Ruiten parcel with pending Annexation Application. 9 Domestic sewer realignment assigned to adjacent Van Ruiten Parcel with pending Annexation Application 10 Kettleffan signal modifications were made for the benefit of the future intersection into the Lodi Shopping Center. 11 Century Blvd traffic signal assigned 25% to each of the adjacent parcels. (75% allocated to parcels/25% to DeBenedetti Park) 12 Consultant design costs incurred late in the project to add: 1) future intersection into the Lodi Shopping Center 2) southbound left tum to Food4Less and 3) southerly extension of median and landscaping. A third of the costs are allocated to Lodi Shopping Center. 13 Electric Utility Conduits costs allocated 50% to each adjacent parcel. 14 Olive Drive improvements include water pipe, water service stub, sewer pipe, sewer service stub, storm service stub, and related appurtenance that lie along the frontage of those parcels. Costs have been allocated based upon the acreage of the individual parcels. The total cost of the Olive Drive improvements is $35,527. ©f 1 las° - --------------©-- 4 1 , MnMMMM----©-©-©-- MnMUMM----..©-©-- i 1 1 1 . ©©---..-...-©-©.n M 1 1 i e', n-------------=-- 1 1 iaa ©---------------- ®1 1 1 •• ©---------------. ©©-©..---..--©--- ©©-©-.-.--.--©--- ®I : 1�6. ©©.©-M----.--©.-- '� 1 I , Moro"". _ ©©.©------..-©--- �' •'r ©©-©-....-.--©--- :� I : Id • '� • ©©.©..----..-©--- ©©-©-.----..-©--- ®I ' ©©-©-.--.-.-©©--- ®I i f _ ©.....----. © .-© ®1 '' - ©---------------© ®/ 1.MILK ©MMMMMMMMM©m©mmm© 1 ' nMMMMM----.---M-- ©..--.----M...--- ®1• •i ©---------------- ®1 1 1 __InMMMMMMMMMMMMMMMM Notes: 1 Water pipes installed along the frontage of parcel was allocated 50% to each parcel based upon frontage length. Some valve costs were assigned to benefitting parcels. 2 Water service stubs were installed beyond the edge of pavement and costs were assigned based upon the length of the stub and included blowoff valve and some valve casts. 3 Sewer pipes installed along the frontage of parcels was allocated 50% to each parcel based upon frontage length. 4 Sewer service stubs were installed beyond the edge of pavement and costs were assigned based upon the length of the stub and included manhole oasts when only required to install the stub. 5 Domesllic sewer crossing at Century Blvd. assigned 100% to adjacent parcel west side of Lower Sacramento Rd. 6 Storm drain crossing at Century Blvd. assigned 100% to adjacent parcel west side of Lower Sacramento Rd. 7 Storm drain stub installed at frontage and costs are based upon the length of the pipe installed. 8 Indusbfal waste realignment assigned to adjacent Van Ruiten parcel with pending Annexation Application. 9 Domestic sewer realignment assigned to adjacent Van Ruiten Parcel with pending Annexation Application 10 Kettleffan signal modifications were made for the benefit of the future intersection into the Lodi Shopping Center. 11 Century Blvd traffic signal assigned 25% to each of the adjacent parcels. (75% allocated to parcels/25% to DeBenedetti Park) 12 Consultant design costs incurred late in the project to add: 1) future intersection into the Lodi Shopping Center 2) southbound left tum to Food4Less and 3) southerly extension of median and landscaping. A third of the costs are allocated to Lodi Shopping Center. 13 Electric Utility Conduits costs allocated 50% to each adjacent parcel. 14 Olive Drive improvements include water pipe, water service stub, sewer pipe, sewer service stub, storm service stub, and related appurtenance that lie along the frontage of those parcels. Costs have been allocated based upon the acreage of the individual parcels. The total cost of the Olive Drive improvements is $35,527. City of Lodi Lower Sacramento Road (Kettieman Lane to Homey Lanef EXHIBIT C Public Works Dept Reimbursable Costs ITEM N. DESCRIPTION UNIT Unit Pnce BDC Lodi Ili Site No. 1 058-030-13 Quanthx Total Van Rulten Site No. 3 05&03M4 Quantity Total Van Ruken Site No. 2 05&030-03 Quantity Total Van Rullan Site No. 4 058-030-05 Quantity Total Howard invee6nenfa 5140 NOL 5 058-03M6 Quantity Total LOWER SACRAMENTO ROAD CONSTRUCTION PROJECT 1 &INCH SAWTARY MWO Pft LF 7 195.00 90 16 ,650.01) $ 2 21 -INCH SANITARY SEWER PIPE LF $ 235.00 1 38 6 930.00 S 3 42 -INCH SANITARY SEWER PIPE LF $ 390.00 218 85,024.00 $ $ - 4 18 -INCH STORM DRAIN PIPE LF S 125.00 $ $ 5 46 -INCH STORM DRAIN PIPE LF $ 205.00 242 49610.00 $ S 5 30 -INCH INDUSTRIAL WASTE PIPE LF $ 155.00 271 4,18500 $ $ 7 PIPE MARKERS EA $ 200.00 $ e SIDE INLET CATCH BASIN EA$ 950.00 $ $ 9 ST 11 10 SANITARY SEWER MANHOLE EA S 3,100.00 0.5 1 550.00 2 8,200.00 5 - 11 INDUSTRIAL WASTE MANHOLE EA S 3625.00 1S S 12 104NOH WATER PIPE LF S 44.00 399 19,551.001 212 10 38B.D0 404 $ 19 796.00 - 13 84NCH WATER PIPE LF $ 35.00 $ $ - 14 6 -INCH WATER PIPE LF S 26.00 70 S 1.820 00 $ 15 2 -INCH WATER PIPE EA S ZGW00 5 $ - 16 TEMPORARY BLOW -OFF EA S 1150.00 2 2300.00 1 1150.00 2 S 2.300.00. $ - 17 WATER VALVE1G4NCH EA $ 2215.00 2 4430.00 1.5 3,323.00 1.5 $ 3,322.50 $ - 18 WATER VALVE 8INCH EA $ 1,M.00 $ $ - 19 WATER VALVE 6 -INCH EA S 1:2 1 S 1.225 00 $ - 20 FIRE HYDRANT ASSEMBLY EA S 3050.00 S $ 21 ICONDUIT 2 -INCH CROSSINGS LF 13 23.00 51 1 173.00 145 3 335.00 218 5,014 00 S - $ - 22 CONDUIT 44NCH CROSSINGS LF $ 16.00 51 818.00 07 1,55200 132 2,112.00 $ S 23 CONDUIT 6-INCHCROSSINGS LF $ 17.00 51 887.00 132 2,244.00 S S 24 TRAFFIC SIGNAL SYSTEM -CENTURY BLVD LS $ 153 300.00 015 38 325.00 $ $ 25 SIGNAL MODIFICATIONS AT KETTLEMANILOWER SAC LS $ 12 000.00 1 12 000.00 $ 28 ADD CONDUIT CROSSINGS PER EUD REQUEST LS $ 20.27a.20 $ $ CONDUIT2'CROSSING LF $ 9.50 50 475.00 Sal 817.00 S $ CONDUIT4'CROSSING LF $ 14.40 50 720.00 172 2577.00 1 1440 $ CONDUIT 6"CROSSING LF $ 17.70 172 3,049.00 S 27 J DESIGN CHANGES FUTURE TS SIKETTLEMAN Is S 55 000.00 0.33 18,333.00 5 $ MTCO AMENDMENT #3 113 COST X 55,000 S S $ HARNEY CURVE PROJECT 1 10' WATER PIPE LF S 72.00 S $ 2 10' WATER VALVE EA S 2,450.00 S - $ 3 4' BLOW OFF EA S 2,100.00 S S - 4 EUD CONDUIT CROSSINGS LSR HARNEY $ $ WEST CROSSING HARNEY 70 LF 114 COST LS 1 $ 4875.00 S I - EAST CROSSING HARNEY 70 LF 114 COST LS S 4 875.00 S $ NORTH CROSSING SR 120 LF 112 COST LS $ 9 749.00 S $ S CENTURY BLVD CONSTRUCTION PROJECT 1 48" STORM DRAIN PIPE LF $ 205.00 423.5 88 817.50 $ $ $ $ TOTAL CONPWJCTM COSTS7 00 S 4. 87.00 399 761.50 S 77.90 10% ENGINEERING 8 ADMiNISTRATI S 7,M50 1 499.70 $ 30 979.15 S 2947.79 $ TOTAL REIMBURSABLE COSTS 1 S K7511.50 1 8,375.70 1 340,7392D 31 325.99 S ReimbursableCoelsTotal Project 1 8/25/2006 City of Lodi Lower Sacramento Road {Kettleman Lane to Harney Lanef EXHIBIT C Public Works 0( -pt Reimbursable Costs i ITEM No. DESCRIPTION UNIT Unfl Pr Schumacher Site Na. 8 05&040-49 QugmW Talal Schumacher Ske Nb. 7 058-04002 QuanMy Total Schumacher Ste No. 8 05&040-04 Ougn%y Total Schumacher See No. 9 05&040-05 Quantity Total SChumemer i Sitze No. 28 058-230-10 Quantity Total LOMR SACRAMENTO ROAD CONSTRUCTION PROJECT 1 8 -INCH SANITARY SEWER PIPE LF 185.00 $ S 2 21 -INCH SANITARY SEWER PIPE LF $ 235.00 S S $ $ 3 42 -INCH SANITARY SEWER PIPE LF $ 390.00 $ $ $ $ 4 18 -INCH STORM DRAIN PIPE LF ; 12$.00 $ $ 5 48 -INCH STORM DRAIN PIPE LF $ 205.00 $ $ $ $ $ fi 30 -INCH INDUSTRIAL WASTE PIPE LF S 155.00 $ $ $ $ $ 7 PIPE MARKERS EA $ 200.00 $ $ $ ; $ 8 SIDE INLET CATCH BASIN EA $ 950.00 $ $ $ $ $ 9 STORM DRA64YYH1HDLE EA 56900 S 10 SANITARY SEWER MANHOLE EA S 3 10D.00 $ S $ 11 INDUSTRIAL WASTE MANHOLE EA $ 3.625.00 $ $ $ $ $ 12 10-3NCHWATER PIPE LF 49.00 68 S 333200 72 $ 3528.00 158 $ 7,742.00 33 $ 1,617.00 1$ 13 8 -INCH WATER PIPE LF $ 35.00 $ $ 52 2,170.130 $ 14 6 -INCH WATER PIPE LF 26.00 $ $ $ $ 5 15 2 -INCH WATER PIPE EA 2.6M00 ; S $ 16 TEMPORARY BLOW -OFF EA 1,150.00 1 $ 1,15000 1 $ 1 15000 1 $ 1,150,00 1 $ 1 150.00 $ 17 WATER VALVE 10-fNCH EA 2,215.00 1.5 $ 3,322.W 2 S 4430.00 0.5 $ 1,107,5o 0.5 $ 1,107.50 $ 18 WATER VALVE &INCH EA I S 1,925.00 $ $ 1 $ 1,925.00 $ $ 19 WATER VALVE 64NCH EA 1 225.00 $ $ $ $ 20 FIRE HYDRANT ASSEMBLY EA 3.050.00 $ $ $ $ S 21 CONDUIT 2 -INCH CROSSINGS LF S 2300 107 $ 2,46100 124 S 2652.00 119 $ 2737.00 S S 22 CONDUIT 4-kNCHCROSSINGS LF S 1600 I $ 848.00 62 S 992.00 60 $ 960.00 $ S 23 CONDUIT 6-INCHCROSSINGS LF 17.00 S S $ $ S 24 TRAFFIC SIGNAL SYSTEM -CENTURY BLVD LS $ 153 300.00 0.25 S 38,325 00 $ ; IS $ 25 SIGNAL MODIFICATIONS AT KETTL£MANILOWER SAC LS 12 000.00 $ $ $ $ $ 26 ADD CONDUIT CROSSINGS PER EUD REQUEST $ 20 278.20 $ $ $ CONDUIT2"CROSSING 5 9.50 $ $ $ $ $ CONOUIT4"CROSSING $ 14.40 S $ $ $ $ CONDUIT 6"CROSSING 5 17.70 $ $ $ $ 3 27 DESIGN CHANGES FUTURE TS SXETTLEMAN ILF $ 55,om w $ S S MTCO AMENDMENT 03 113 COST X 55,000 $ $ S $ S $ $ $ $ HARNEY CURVE PROJECT 1 10" WATER PIPE $ 72.00 S $ $ 204 $ 14,886.00 383 $ 26,136.0D 2 10' WATER VALVE EA S 2,4W.00 S $ 1-5 $ 3 675.00 1.5 $ 3 675.00 3 4' BLOW OFF EA $ 2,100.00 S $ $ 1 $ 2,100.00 4 EUD CONDUIT CROSSINGS LSR HARNEY S $ $ $ $ WEST CROSSING HARNEY 70 LF 114 COST LS $ 4.875.00 S $ $ 0.5 $ 2,437.50 $ EAST CROSSING HARNEY 70 Lf 114 COST LS $ 4,875.00 $ S $ S $ NORTH CRCSSING (LSR120 LF 112 COST LS $ 9,749,00 $ $ S 0.5 $ 4,874.M 0-5-S 4,874.50 $ $ S S CENTURY BLVD CONSTRUCTION PROJECT 1 48"STORM DRAIN PIPE LF $ 205.00 423.5 S 86817.50 $ $$ $ $ $ $ $ $ TOTAL CONSTRUCTION COM I I 13LMA0 $ 12 00 $ 17 791.50 31 60.50 .60 10% ENGINEERING 6 ADMINISTRATIgM 13625.60$ 1 5.20 $ 1,779.15 ; 3,164,95 $ 3,712.30 TOTAL REBURSABLE COSTS IM $ 44,425,601 $ 1 47m $ 19 570.15 $ 341.814.45 S 40 653.30 RermbursahleCoSUTatat Protect 2 8!2512000 900Zf9Zl9 oafaid Ie401sIsOD8lgeslnqul!atj OL'ZBV S OZ'£ S S OS'Z£Z L S MILD 4S $ Op'14Z 4L S1SOO 318VSangWIM 1V101 O4'L9£ S OZ'M S 04.199 S 00'980 £ S OL'OM 9 S LLVHL IM Y ONRI33NION3 %OV 0O'LL f 00'ZLM 4 00141 S 00'06106 I 00'1 N I S1S00 NOI10RiLLSN091V101 00'90Z S jl 3dld NIV80 VY801S.94 l 103rMd NOl1,MLLSN07 QA -1V AUMN30 00'6416 S Sl 1500 ZR jl OZ4 ifSl ONISSO'dO H1MlON - ; - S - S - S - S 00'9194 $ Si ISM 4Il -A-1 OL 0,3NNVH SNISS080ISV3 • S - S - S - 00'9L94 S Sl 1SOO 0,10 Sl OL A3NZIVH 9NISSOND.MM ' $ S $ - $ - S A3NdVH 'dSl SONISSOiID 1If10NOO an3 4 t S 00"OOL Z S V3 dj0MOl9.4 E 00-044 Z $ V3 3A-IVA b31VM.W Z 00"ZL S jl 3dld d31VM.W 0 103fOad wimn0 A3WwR II ODO'SS X 1S00 VW £N 1N3WON3WV 001W 00'OOO99 S M NVW31113WSSl3bn-L ziS3ONVHONVS30 LZ 00'998 L S 094 OL'Ll S jl ONISSOHD.91If10N00 00'090 Z S 040 D4'4l SI jl ONISS0110.411f10N00 00'914 jm0 09'6 S Al ONISSO'dO.Z11f10N00 ; - - S 0Z'9GZ OZ S Sl 1S3f1032i cm Nay SON4SSOMD 11f10N00 OOV 9Z 00'000 Z0 S Sl DVS'd@M0llNVW31113N lV SNOI1VOUI00W IVNOIS 5Z 00'8ZE 9£ S SZ'0 00'00£ £9L 3 Sl ams AanlN3D- P1315AS -NNO15 oizuvul 4Z 190 - S - 00"10 S 31 SONISSOUD HONI9lIf1ONOO EZ 00'009 $ 09 I 0O'OZ€'Z S 544 - S 00'9L $ .l SONISSOU0 HONI'41If30N00 ZZ OD'OSl l ID9 1 00'9££ f S 441 - S DO'CZ $ jl S-ONISSOMIO HONI-Z lIMN00 LZ - $ - $ 00,090,C $ V3 A19W3SSV 1NVdQAH 32iLi OZ DO'SZZ l S L - ; WSW L S 1 V3 1 H3NI93AIVA2l31VM 64 4 00'928 L $I V3 HONI-93A-IVAa31VM 9L 00'0E44 S Z 009LZZ ; l Do's LZZ $ V3 HONI-DL3AIVAM31VM Ll ' S - ; - S 00"00CZ Z SI DVOSVt S I V3 I 3310•MOl9ALiVMOdW31 9L - S - $ $ - s 00'SZ9 Z S V3 3dld 831VM HDNT-Z 91 ' $ $ S 00-9 L4 $ 9L - $ Do 9a S jl 3dW NalVM HONI-9 4I - S - S - S S - S 00'9£ $ -Al 3dld N31VM HON" E L - - $ 00'9SOZ S Z4 00'456'9L 4 94£ OO'L W 9 1 E£E 00'64 $ jl 3dId89-LVMHONI-OL Z 00'SZ9 € $ V3 31OHNVW 31SVM IVD IOONl L L S S S 00"OA4£ t V3 3lOMMNVW LWYS OL S V3 3 4 ols 6 00'096 $ V3 NISV9 HD1V3 131N1 3015 9 DO'OOZ $ V3 SM37WV'W 3d1d L 00'950 $ dl 3dld 31SVM iviulsniml HONI-OE 9 S DOW S jl 3d4dNlYdOMYtlOLSHONI.0 5 DO'SZL S jl 3dld NIVLIO MMMJOIS HDNI-Qi 4 OD'OeE S Al 34ld M3M3S AdV1MiVS HDNI-Z4 £ 00,9£Z $ -1 3d1d H2M3S Add-UNVS HONK Z S ; S S 00'961 S jl 30to UWAN MWJUMVS HONn L %09' 1l %0611 103f01ld NOLLOf1211!Mo avow 01NMVMOVS Ml3MOl ,om_L ImuLn,, 01-041950 M -0N eAS ameo-V lLgoi pump 90-044-890 91 -Nous ueuuaH 1e101. uenp 44-044-890 ZZ'ON ai15 umalad IeWl !luen0 Z V040-990 LZ ON as!S uOQmK8d IM01 fq.queno ZS-W-OSO EZ ON eIIS uoslowd 95ud l!u(1 11Nf1 NOI1dWUSM ON V1311 O 1191HX3 SMSoO afgesangwfaa (aat7 AstuV { 01 Oue-I aewMUON) Pros aluw.UBJDeg JQMO-1 1d9Q gjoAA Oilgnd POl 40 Allo City of Lodi Lower Sacramento Road (Kettleman Lane to Barney Lane) Public Works Dept EXHIBIT C Reimbursable Costs ITEM No DESCRIPTION UNIT Unit Pnce Frame Site No. 13 058-140-04 Quantity Total Ran n Sittle No. 14 058-140-05 Quantity Total Del Rio Slte No. 16 058-140-07 Quantly Total Hao Site No. 17 058-140-08 Quitaty, Total Del Rio Site No. 18 058-140-09 Quantity Total LOWER SACRAMENTO ROAD CONSTRUCTION PROJECT 11.40% 24.30% 11.80% 11.80% 7.80% 1 84NCH &ANITARY LF S 18b.00 $ S 2 21 -INCH SANITARY SEWER PIPE LF 1 $ 235.00 $ $ $ 3 42 -INCH SANITARY SEWER PIPE LF S 300.00 $ S S $ $ 4 18 -INCH STORM DRAIN PIPE LF $ 125.00 $ $ $ $ $ 5 1484NCH STORM DRAIN PIPE LF $ 205.00 $ $ $ $ $ 6 30 -INCH INDUSTRIAL WASTE PIPE LF $ 155.00 $ $ $ $ $ 7 JPIPE MARKERS EA ; 200.00 $ S $ $ 8 SIDE INLET CATCH BASIN EA $ 950.00 $ $ $ $ $ 9T D F„A 70 A AIRY E EA $ 'ibb.00 S § $ § 11 INDUSTRIAL WASTE MANHOLE EA I $ 3_625.00 S $ $ $ $ 12 10 -INCH WATER PIPE LF $ 49.00 $ $ $ 13 8 -INCH WATER PIPE LF S 35.00 $ $ $ 14 6 -INCH WATER PIPE LF $ 28.00 $ $ $ $ $ 15 2 -INCH WATER PIPE EA S 2 825.00 $ $ $ 16 TEMPORARY BLOW -OFF EA $ 1,J50.00 $ $ $ $ s 17 WATER VALVE 10 -INCH EA $ 2,215.00 $ $ $ $ $ 113 WATER VALVE B -INCH EA 1 925.00 $ 3 ; 19 WATER VALVE IiINCH EA $ 1,226.00 $ $ S S $ 20 FIRE HYDRANT ASSEMBLY EA S 3050.00 1 $ $ $ $ $ 21 CONDUIT 2 -INCH CROSSINGS LF $ 23.00 $ $ s $ ; 22 CONDUIT 4 -INCH CROSSINGS LF $ 16.00 $ $ $ $ $ 23 CONDUIT &INCH CROSSINGS LF $ 17.00 $ $ $ $ S 24 TRAFFIC SIGNAL SYSTEM -CENTURY BLVD LS $ 153 300.00 $ $ $ S 25 SIGNAL MODIFICATIONS AT KEMEMAN&OWER SAC LS $ 12 OOO.00 $ $ $ $ 1 26 ADD CONDUIT CROSSINGS PER EUD REQUEST LS $ 20,2782D S $ $ S S CONDUIT 2" CROSSING LF $ 9-50 $ $ $ $ CONDUIT 4" CROSSING LF $ 14.40 $ $ $ $ CONDUIT 6" CROSSING LF $ 17,70 $ S S S $ 27 DESIGN CHANGES FUTURE TS SA(ETTLEMAN Is $ 55 000.00 $ S 5 $ MTCO AMENDMENT #3 113 COST X 55,000 $ S S $ $ $ $ $ $ $ HARNEY CURVE PROJECT 1 10" WATER PIPE LF 72.00 $ S $ $ 2 10" WATER VALVE EA $ 2450.00 $ $ $ $ $ 3 4" BLOW OFF EA S 2,100.00 $ $ 4 EUD CONDUIT CROSSINGS LSR HARNEY $ $ $ $ § WEST CROSSING HARNEY 70 LF 1/4 COST LS 1 $ 4875.00 S $ $ $ $ EAST CROSSING HARNEY 70 LF 114 COST LS $ 4875.00 $ $ $ 5 NORTH CROSSING (LSR) 120 LF 112 COST LS $ 9749.00 S $ $ $ $ $ s s s s CENTURY BLVD CONSTRUCTION PROJECT 1 48" STORM DRAIN PIPE LF S 205.00 $ $ E $ $ $ $ $ $ s TOTAL CONSTRUCTION COSTS 082.00 i 7,U8.00 $ 3,811.00 $ 3,811.00 10% ENGINEERING S ISTRATI S 300.20 S 784.80 $ 381.00 $ 301.10 S 245.40 TOTAL REIMBURSABLE COSTS 4,050.20 1 8 032.00 $ 4,192.10 $ 4192.10 $ 2,699.40 ReimbursableCoslsTotal Project 4 8/25/2006 City of Lodi Lower Sacramento Road (KedMman Lane to Homey Lane) EXHIBIT C Public Works Dept Reimbursable Costs ITEM No OESCRIPTION UNIT Unit Price Zane Site No. 20 058-140-11 Quantity Total Clffktdo Site No 24 058-230-06 Quantity Total SOoe Site No. 25 058-230-07 Quantity Total Sanchez Site Na. 26 056-230-08 Quanli Total Sandoval Site No. 27 058-230-09 Quantity Total LOWER SACRAMENTO ROAD CONSTRUCTION PROJECT 6.50% 1 6 TARY SEWER POE LF $ 116.00 T$ $ $ $ 2 21 -INCH SANITARY SEWER PIPE LF $ 235.00 E $ ; $ $ 3 42 -INCH SANITARY SEWER PIPE 390.00 $ S $ $ $ 4 18 -INCH STORM DRAIN PIPE 125.00 $ S $ 5 484NCH STORM DRAIN PIPE 205.00 $ $ $ 6 30-1 NCH INDUSTRIAL WASTE PIPE 155.00 $ $ $ $ $ 7 PIPE MARKERS JEA$ 200.00 $ $ $ $ $ 8 SIDE INLET CATCH BASIN 950 p0 $ $ $ $9 STORM DRAIN LE 3 0010 Sk IIIAMIOLE 3 $ $ $ $ 11 INOUSTRIAL WASTE MANHOLE EA $ 3,825.00 $ $ $ $ S 12 10 -INCH WATER PIPE LF $ 49.00 $ $ $ $ 13 B -INCH WATER PIPE LF S 35.00 $ $ $ 14 6 -INCH WATER PIPE LF $ 26.00 $ - $ S $ $ 15 2 -INCH WATER PIPE EA $ 2 125.00 $ $ S 16 TEMPORARY GLOW -OFF EA S 1_19G.00 $ $ $ $ $ 17 WATER VALVE 10 -INCH EA $ 2,215.00 $ $ $ $ $ 18 WATER VALVE 8 -INCH EA 1,925.00 $ $ $ $ $ 19 WATER VALVE 6 -INCH EA $ 1,225.00 $ S $ $ $ 20 FIRE HYDRANT ASSEMBLY EA I $ 3 050.170 $ $ $ $ $ 21 CONDUIT 24NCH CROSSINGS LF $ 23.00 $ $ $ $ 22 CONDUIT 4-114CH CROSSINGS LF $ 16.00 $ $ $ $ $ 23 CONDUIT &INCH CROSSINGS LF $ 17.00 S S $ $ 24 1 TRAFFIC SIGNAL SYSTEM -CENTURY BLVD LS $ 153 300.00 $ - $ $ $ $ 25 SIGNAL MODIFICATIONS AT KETTLEMANILOWER SAC LS $ 12 000,00 $ S $ $ $ 26 ADD CONDUIT CROSSINGS PER EUD REQUEST LS $ 20 278.20 $ $ $ $ $ CONDUIT 2' CROSSING LF $ 9.50 $ $ S $ CONDUIT4'CROSSING LF $ 14.40 $ $ $ $ $ CONDUIT 6" CROSSING LF 17.70 $ $ $ S S 27 DESIGN CHANGES FUTURE TS SIKETTLEMAN Is $ 55 000.00 $ $ $ $ S MTCO AMENDMENT #3 113 COST X 55,000 $ $ $ S $ s s a $ HARNEY CURVE PROJECT 1 10" WATER PIPE LF $ 72.00 S - 33 $ 2 378.00 33 S 2,376.00 33 S 2,376.00 33 $ 2,376,01) 2 10" WATER VALVE EA $ 2,450.00 $ $ $ $ S 3 4" BLOW OFF EA 2,100.Q0 ; $ $ 4 EUD CONDUIT CROSSINGS LSR HARNEY $ $ $ $ $ WEST CROSSING HARNEY 70 LF 114 COST LS $ 4,875.00 A $ $ EAST CROSSING HARNEY 70 LF 114 COST LS I S 4,875.00 $ S $ $ $ NORTH CROSSING LSR 120 LF 112 COST L5 § 9 749,00 ; S $ S ; S S $ $ $ CENTURY BLVD CONSTRUCTION PROJECT I 48" STORM DRAIN PIPE LF $ 205.00 $ - $ $ $ $ s $ s s TOTAL CONSTRUCTION COSTS 1 $ 2,M.00 111 2,374'00 S 2 370.00 2 376.01 $ 20M.09 10% ENGINEERING 8 ADWNMMTOON 1 IF Z09.90 I 237.60 I $ 237.10 $ 237.60 237.50 TOTAL REIMBURSABLE COSTS I S 2,308.90 1 2,613.60 2 e13.60 $ 2 613.60 2,613.60 ReirrbursableCostsTotal Project 5 8/25/2006 City of Lodi Lower Sacramento Road (KetNernan Lane to Harney Lane] EXHIBIT Ci Public Works Dept Reimbursable Costs ITEM No DESCRIPTION UNIT Unit Price Woods Site No. 12 05B-070-09 Quantity Total Lyndte Site No. 11 058-070-08 Quantity Total Hayn Site No. 10 05&070-07 Quantity T0481 LOWER SACRAMENTO ROAD CONSTRUCTION PROJECT 1 18 -INCH SANTARY SSW PIPE LF 186.00 ; $ 2 214MCH SANITARY SEWER PIPE LF $ 235.00 $ $ $ 3 42 -INCH SANITARY SEWER POPE LF 1 $ 380.00 $ $ $ 4 1&INCH STORM DRAIN PIPE LF $ 125.00 $ $ 5 484NCH STORM DRAIN PIPE LF $ 205.00 6 30 -INCH INDUSTRIAL WASTE PIPE LF $ 155.00 $ $ ; 7 PIPE MARK£FLS EA $ 200.00 $ $ $ 8 SIDE INLET CATCH BASIN EA $ 950.00 $ $ $ 9 STORM DRAIN MANHOLE EA $ 3 .00 S - 10 RA MANHOLE FA S 3 ; 11 INDUSTRIAL. WASTE MANHOLE EA $ 31125.00 S $ $ 12 10 -INCH WATER PIPE LF $ 49.00 ; 13 B -INCH WATER PIPE LF S 35.00 S $ 14 &INCH WATER PIPE LF $ 26.00 $ $ S 15 2 -INCH WATER PIPE EA 2,U5,00 § $ 16 TEMPORARY SLOW -OFF EA $ 1 180.00 $ $ $ 17 WATER VALVE 10 -INCH EA $ 2,215.00 $ $ $ 18 WATER VALVE 8 -INCH EA S 1,9Z5.00 § $ $ 19 WATER VALVE &INCH EA $ 1 225.00 $ $ $ 20 FIRE HYDRANT ASSEMBLY EA $ 3,050.00 S $ $ 21 CONDUIT2-INCH CROSSINGS LF $ 23,00 $ 22 CONDUIT4-INCHCROSSINGS LF 1 $ 16.00 ; $ S 23 CONDUIT 6•INCHCROSSINGS LF $ 17.00 $ $ 24 TRAFFIC SIGNAL SYSTEM -CENTURY BLVD LS $ 153 300.00 $ $ $ 25 SIGNAL MODIFICATIONS AT KETTLEMANILOWER SAC LS 12,D00.00 $ $ 26 ADD CONDUIT CROSSINGS PER EUD REQUEST LS $ 20 278.20 $ S $ C6NDUIT2"CROSSING LF $ 9.50 $ S CONDUIT V GROSSING LF 14.40 $ $ CONDUIT 6' CROSSING LF ; 17.70 S $ $ 27 DESIGN CHANGES FUTURE TS S/KETTLEMAN Is IS 55 000.00 $ $ $ MTCO AMENDMENT 03 113 COSTJ X 55,000 $ $ $ $ $ $ HARNEY CURVE PROJECT 1 I 10" WATER PIPE LF $ 72.00 103 7 416.00 103 $ 7,416.00 103 S 7,41&00 2 10" WATER VALVE EA $ 2.4-50 DO $ $ 1 2.450.00 3 4" BLOW OFF FA $ 2 100,DD S 4 EUD CONDUIT CROSSINGS LSR HARNEY $ $ $ WEST CROSSING HARNEY 70 LF 1!4 COST LS $ 4875.00 $ EAST CROSSING HARNEY 70 LF (1/41 COST LS ; 4,875.00 $ $ $ NORTH CROSSING (LSR) 20 LF 172 COST LS $ 9,749.00 $ $ ; $ S CENTURY BLVD CONSTRUCTION PROJECT 1 48" STORM DRAIN PIPE LF $ 205.00 $ $ $ TOTAL CONSTRUCTION COSTS $ 7 41&00 $ 7,414.00 SAIM1.0111, 10% ENGIIIEERING& ADMINfSTRA $ 741.601 $ 741.60 $ 1,230,50 TOTAL REIMBURSABLE COSTS is 8.157.80 1 $ 8157.60 $ 13,53&35 Reimhumab4CostsTotal Project 6 8!2512006 Please immediately confirm receipt of this fax by calling 333-6702 CITY OF LODI P.O. BOX 3006 LODI, CALIFORNIA 95241-1910 ADVERTISING INSTRUCTIONS SUIJECT: Resolution establishing Area of Benefit and Reimbursable Costs for Lower Sacramento Road (Kettleman Lane to Harney Lane) Improvements PUBLISH DATE: Saturday September 9, 2006 TEAR SHEETS WANTED: Three (3) please SEND AFFIDAVIT AND BILL TO: JENNIFER M. PERRIN, INTERIM CITY CLERK City of Lodi P.O. Box 3006 Lodi, CA 95241-1 91 0 DATED: Thursday September 7, 2006 OR©ERED BY: JENNIFER M. PERRIN, CMC IIff-RIM CITY CLERK DANA R. CHA A ADMINISTRATIVE CLERK to the Sentinel at 369-1084 at Phoned to confirm receipt of all formslad vin s. doc JENNIFER M. PERRIN INTERIM CITY CLERK JACQUELINE L. TAYLOR, CMC DEPUTY CITY CLERK JLT . c DECLARATION Of POSTING Resolution establishing Area of Benefit and Reimbursable Costs for Lower Sacramento Road (Kettleman Lane to Harney Lane) Improvements On Friday, September 8, 2006, in the City of Lodi, San Joaquin County, California Resolution establishing Area of Benefit and Reimbursable Costs for Lower Sacramento Road (Kettleman Lane to Harney Lane) Improvements was posted at the following locations: Lodi Public Library Lodi City Clerk's Office Lodi City Hall Lobby Lodi Carnegie Forum I declare under penalty of perjury that the foregoing is true and correct. Executed on September 8, 2006, at Lodi, California. JENNIFER M. PERRIN, CMC INTERIM CITY CLERK DANA R. HA MAN ADIVRNISTRATIVE CLERK N:1Administration\CLERKIFormslDECPOSTPW 1.DOC ORDERED BY: JENNIFER M. PERRIN INTERIM CITY CLERK JACQUELINE L. TAYLOR, CMC DEPUTY CITY CLERK DECLARATION Of MAILING Resolution establishing Area of Benefit and Reimbursable Costs for Lower Sacramento Road (Kettleman Lane to Harney Lane) Improvements On September 8, 2006, in the City of Lodi, San Joaquin County, California, I deposited in the United States mail, envelopes with first-class postage prepaid thereon, containing a Notice of Public Hearing, a Resolution establishing Area of Benefit and Reimbursable Costs for Lower Sacramento Road (Kettleman Lane to Harney Lane) Improvements. The mailing list for said matter is attached hereto, marked exhibit A. There is a regular daily communication by mail between the City of Lodi, California, and the places to which said envelopes were addressed. I declare under penalty of perjury that the foregoing is true and correct. Executed on September 8, 2006, at Lodi, California. ORDERED BY: JENNIFER M. PERRIN, CMC I RIM CITY CLER I / !� DANA R. CHAP N ADMINISTRATIVE CLERK Formsldecmail.doc ORDERED BY: JENNIFER M. PERRIN INTERIM CITY CLERK, CITY OF LODI JACQUELINE L. TAYLOR, CMC DEPUTY CITY CLERK •. CITY OF LODI Carnegie Forum 305 West Pine Street, Lodi L OTICE OF PUBLIC HEARING ovember 1, 2006 00 p.m. For information regarding this notice please contact: Jennifer AN. Perritt Interim City Clerk Telephone: (209) 333-6702 NOTICE OF PUBLIC HEARING NOTICE IS HEREBY GIVEN that on Wednesday, November 1, 2046 at the hour of 7:00 p.m., or as soon thereafter as the matter may be heard, the City Council will conduct a public hearing at the Carnegie Forum, 305 West Pine Street, Lodi, to consider the following matter: a) Resolution establishing Area of Benefit and Reimbursable Costs for Lower Sacramento Road (Kettleman Lane to Harney Lane) Improvements Information regarding this item may be obtained in the Public Works Department, 221 West Pine Street, Lodi, (209) 333-6706. All interested persons are invited to present their views and comments on this matter. Written statements may be filed with the City Clerk, City Hall, 221 W. Pine Street, 2nd Floor, Lodi, 95240 at any time prior to the hearing scheduled herein, and oral statements may be made at said hearing. If you challenge the subject matter in court, you may be limited to raising only those issues you or someone else raised at the public hearing described in this notice or in written correspondence delivered to the City Clerk, 221 West Pine Street, at or prior to the close of the public hearing. By Order of the Lodi City Council: rM. P r' terim City Clerk Dated: September 6, 2006 Approved as to form: D. Stephen Schwabauer City Attorney CLERKS USHEAMNOTICEMNOpw4.doc WMA APN OWNER ADDRESS CITY STATE ZIP SITUSNUM 05803013 BDC LODI III 100 SWAN OAKLAND CA 94621 1551 N LLC WAY SUITE LOWER 206 SAC RAM ENTO RD 05803003 VAN RUITEN 463 W LODI CA 95242 14509, 14499, 05803004 RANCH LTD TURNER RD 14433 N 05803005 LOWER SACRAMENTO RD 05803006 HOWARD 2026 STOCKTON CA 95207 14195 N INVESTMENTS ANGELICO LOWER LLC ETAL CIR SACRAMENTO RD 05804001 SCHUMACHER 1303 LODI CA 95240 14101, 13837, 05804002 WELDON & RIVERGATE 13537, 13589 05804004 BONNIE TR DR N LOWER 05804005 SACRAMENTO RD 05807007 HAYN, BRIAN S 810 E LODI CA 95242 810 E HARNEY HARNEYLN LN 05807008 BELL LYNDLE 814 E LODI CA 95242 814 E HARNEY A TR HARNEY LN LN 05807009 WOODS MARY 880 E LODI CA 95242 880 E HARNEY E TR HARNEY LN LN 05814004 FRAME DEAN 212 LODI CA 95242 14752 N K & SHARON L RUTLEDGE LOWER TR DR SACRAMENTO RD ALI RAMZAN 1112 LODI CA 95240 865 E OLIVE 105814005 RIVERGATE ST DR 05814006 HERRMANN 1200 LODI CA 95240 800 E OLIVE VERNET & C GLENHURST AVE TRS 05814007 DEL RIO 15315 N LODI CA 95240 844 E OLIVE SANTIAGO M & HOERL RD AVE RAMONA T 05814008 HALL FRANK PO BOX 90 FRENCH CA 95231 890 E OLIVE CAMP AVE 05814009 DEL RIO 865 E OLIVE LODI CA 95242 908 E OLIVE SANTIAGO M & AVE AVE - RAMONA T 05814010 AMIGABLE 930 E OLIVE LODI CA 95240 930 E OLIVE LETICIA F AVE AVE ETAL 05814011 GRIEVER 1432 PARK LODI CA 95242 777 E OLIVE ZANE M & P ST AVE TRS 05814012 PETERSON M P O BOX 473 LOCKEPORD CA 95237 14500, 14320 05814052 BILL N LOWER SACRAMENTO RD 05814014 PETERSON PO BOX 331 SUTTER CA 95685 14620 N RUTH SUSAN CREEK LOWER SAC RAM ENTO RD 05823006 GALINDO 871 E LODI CA 95242 871 E HARNEY MARK L & HARNEY LN LN ELEANOR R 05823007 STICE LARRY 893 E LODI CA 95242 893 E HARNEY & GORETI HARNEY LN LN 05823008 SANCHEZ JOB 909 E LODI CA 95242 909 E HARNEY & ELENA HARNEY LN LN 05823009 SANDOVAL 931 E LODI CA 95242 931 E HARNEY LORENZO V & HARNEY LN LN MARGARIT 05823010 SCHUMACHER 1303 LODI CA 95240 13520 N WELDON & RIVERGATE LOWER BONNIE TR DR SACRAMENTO RD WAL MART MAIL STOP BENTONVILLE AR 72716 - REAL ESTATE 0555 0555 BUSINESS TR TAMURA JOEY 788 W LODI CA 95240 TR ARMSTRONG RD E -W 13 RECD r 7006 AFF - S F" t : I `J CITi of i= September 6, 2006 Honorable Mayor Hitchcock and Members of the Lodi City Council 221 W. Pine Street Lodi, CA 95240 It has come to my attention today, for the first time, that the City of Lodi is proposing to assess my properties for certain improvements made during the Lower Sacramento Road reconstruction project. I had no idea of the City's intent to assess my property for this work. When the representatives from the City of Lodi approached me to obtain the right of ways they needed for the project, I was told that I would not incur any cost for this construction project and, in exchange, I gave the City the right of ways that they said they needed to make the improvements. I have never been told, nor have I received any documentation that indicated to me that my property would be assessed. Today I learned of the City's proposal, but I still have not seen any details of what the City intends to do. I respectfully request that this item not be scheduled for a public hearing on October 4, 2006. I need sufficient time to review this matter before it is considered by the City Council. iiten Weldon D. Schumacher, M.D. 1303 Rivergate Drive Lodi, California 95240 September 6, 2006 City of Lodi 221 West Pine Street Lodi, California 95241 To: City Manager, Honorable Mayor and City Council Re: Item E-13 on City Council Agenda (9/6/06) E" 13 RE(,EI V E0 206 SSP C LL Cly Y OF LC),J1 1 would respectfully request that the Public Hearing on this matter be scheduled for a November or December hearing. This matter has only come to my attention today and I will need the additional time to prepare for the hearing. Sincerely yours, 9 Weldon D. Schumacher, M.D. CITY COUNCIL SUSAN HITCHCOCK, Mayor BOB JOHNSON, Mayor Pro Tempore JOHN BECKMAN LARRY D. HANSEN JOANNE MOUNCE Property Owners CITY OF LODI PUBLIC WORKS DEPARTMENT BLAIR KING, City Manager JENNIFER M. PERRIN, Interim City Clerk D. STEPHEN SCHWABAUER, City Attorney CITY HALL, 221 WEST PINE STREET / P.O. BOX 3006 RICHARD C. PRIMA, JR., LODI, CALIFORNIA 95241-1910 Public Works Director TELEPHONE (209) 333-6706 1 FAX (209) 333-6710 EMAIL pwdept@lodi.gov http:/Iwww,lodi.gov August 31, 2006 Moj /I r?g L&a2Pd SUBJECT: Set Public Hearing for October 4, 2006, to Consider Resolution Establishing Area of Benefit and Reimbursable Costs for Lower Sacramento Road (Kettleman Lane to Harney Lane) Improvements Enclosed is a copy of background information on an item on the City Council agenda of Wednesday, September 6, 2006. The meeting will be held at 7 p.m. in the City Council Chamber, Carnegie Forum, 305 West Pine Street. As indicated in the title, the only action will be to set a public hearing date on the item. Public hearings are usually set for the second following Council Meeting. If you wish to write to the City Council, please address your letter to City Council, City of Lodi, P. O. Box 3006, Lodi, California, 95241-1910. Be sure to allow time for the mail. Or, you may hand -deliver the letter to City Hall, 221 West Pine Street. If you wish to address the Council at the Council Meeting, be sure to fill out a speaker's card (available at the Carnegie Forum immediately prior to the start of the meeting) and give it to the City Clerk. If you have any questions about communicating with the Council, please contact Jennifer Perrin, Interim City Clerk, at (209) 333-6702. If you have any questions about the item itself, please call Sharon Welch, Senior Civil Engineer, at (209) 333-6800, extension 2659. Richard C. Prima, Jr. Y • Public Works Director RCPlpmf Enclosure cc: City Clerk J:\DEV_SERV\NCCSetPHAreaofBenefitLwrSac.doe APN OWNER ADDRESS CITY STATE ZIP SITUSNUM 05803013 BDC LODI III 100 SWAN OAKLAND CA 94621 1551 N LLC WAY SUITE LOWER 206 SAC RAM ENTO RD 05803003 VAN RUITEN 463 W LODI CA 95242 14509, 14499, 05803004 RANCH LTD TURNER RD 14433 N 05803005 LOWER SACRAMENTO RD 05803006 HOWARD 2026 STOCKTON CA 95207 14195 N INVESTMENTS ANGELICO LOWER LLC ETAL CIR SACRAMENTO RD 05804001 SCHUMACHER 1303 LODI CA 95240 14101, 13837, 05804002 WELDON & RIVERGATE 13537, 13589 05804004 BONNIE TR DR N LOWER 05804005 SACRAMENTO RD 05807007 HAYN, BRIAN S 810 E LODI CA 95242 810 E HARNEY HARNEYLN LN 05807008 BELL LYNDLE 814 E LODI CA 95242 814 E HARNEY ATR HARNEY LN LN 05807009 WOODS MARY 880 E LODI CA 95242 880 E HARNEY ETR HARNEY LN LN 05814004 FRAME DEAN 212 LODI CA 95242 14752 N K & SHARON L RUTLEDGE LOWER TR DR SACRAMENTO RD 05814005 ALI RAMZAN 1112 LODI CA 95240 865 E OLIVE RIVERGATE ST DR 05814006 HERRMANN 1200 LODI CA 95240 800 E OLIVE VERNET & C GLENHURST AVE TRS 05814007 DEL RIO 15315 N LODI CA 95240 844 E OLIVE SANTIAGO M & HOERL RD AVE RAMONA T 05814008 HALL FRANK PO BOX 90 FRENCH CA 95231 890 E OLIVE CAMP AVE 05814009 DEL RIO 865 E OLIVE LODI CA 95242 908 E OLIVE SANTIAGO M & AVE AVE RAMONA T 05814010 AMIGABLE 930 E OLIVE LODI CA 95240 9k E OLIVE LETICIA F AVE AVE ETAL 05814011 GREVER 1432 PARK LODI CA 95242 777 E OLIVE ZANE M & P ST AVE TRS 05814012 PETERSON M P O BOX 473 LOCKEFORD CA 95237 14500, 14320 05814052 BILL N LOWER SACRAMENTO RD 05814014 PETERSON PO BOX 331 SUTTER CA 95685 14620 N RUTH SUSAN CREEK LOWER SACRAMENTO RD 05823006 GALINDO 871 E LODI CA 95242 871 E HARNEY MARK L & HARNEY LN LN ELEANOR R 05823007 STICE LARRY 893 E LODI CA 95242 893 E HARNEY & GORETI HARNEY LN LN 05823008 SANCHEZ ,JOB 909 E LODI CA 95242 909 E HARNEY & ELENA HARNEY LN LN 05823009 SANDOVAL 931 E LODI CA 95242 931 E HARNEY LORENZO V & HARNEY LN LN MARGARIT 05823010 SCHUMACHER 1303 LODI CA 95240 13520 N WELDON & RIVERGATE LOWER BONNIE TR DR SACRAMENTO RD WAL MART MAIL STOP BENTONVILLE AR 72716- REALESTATE 0555 0555 BUSINESS TR TAMURA JOEY 788 W LODI CA 95240 TR ARMSTRONG RD