HomeMy WebLinkAboutAgenda Report - August 16, 2006 E-07A06140A ITEM A& CITY oiF LoI COUNCIL COMMUNICATION TM A(394" TITLE: Adopt *esoldtlon AwaWing Contact for Chutth Street end Secrameoft Streat Overlays 2806 Pr00ct to i; OOMe Reed, Inc., of Lodi ($374,790) MEETRO DATE: Augus416, 2006 PFt§PA *DIFY: PublicWorlts Dkector ACTION: That the City Council adopt a resolution awarding the contract for the above project to George Reed, Inc., of Lodi, in the amount of $374,791. BACKGOIDUND INFORMATION: This project includes installing a 0.20 -foot thick asphalt pavement overlay on Church Street between Lodi Avenue and Locketiord Street and a 0.15 -foot thick asphalt pavement overlay on Sacramento Street between Elm Street and Lockeford Street. The work also includes approxinvitely 3,000 tons of asphalt concrete and 3,200 square yards of pavement reinforcement fabric, pavemetlt grinding, pavement Striping, signal modifications and other incidental and related work, all as shown on the plans and specifications for the above project. Alternate Bid Items Nos. 2, 3, and 4 are the costs associa* with raising Electric Utility vault lids to grade within the pavement. Plans arW specifications for this project were approved on June 7, 2006. The City received the following two bids for lids project on July 19, 2006. It is expected that the paving will take place in late September with limited daytime closures. The scheduling will be coordinated with the Farmers Market and Street Faire. Bidder Location Bid Engineer's Estimate $422,490* George Reed, Inc. Lodi $374,791* Granite Construction Stockton $5132,735* lncktdes Alternate Bid Items Nos. 2, 3, and 4 FISCAL ~T: By investing in the recommended overlay project, sigrifficant capital dobers-will be saved by extending the useful life of the pavement section. FUN INS AVAILABLE: Measure K: $415,250 TDA Streets: $51,750 TDA Bike/Pedestrian: $10,000 Electric Utility: $10,000 Project Estimate (including contingency): $487,000 Budgeted: 06107 fiscal year Ruby P te, Fina ' Service er Richard C. Prima, J Public Works Director Pr�a redff a * J.Undseth, AssociateCivil Enginoer recc: attorney Purchasing Officer Street superintendent APPROVED: Blair K ity Manager J:IPROJECTBISTREETS1ChurchlChurCh St # Sacramento St Overlays 200MAward.6oc BJ81�C146 RESOLUTION NO, 2006-154 A RESOLUTION OF THE LODI CITY COUNCIL AWARDING THE CONTRACT FOR CHURCH STREET AND SACRAMENTO STREET OVERLAYS 2006 PROJECT WHEREAS, in answer to notice duly published in accordance with law and the order of this City Council, sealed bids were received and publicly opened on July 19, 2006, at 11:00 a.m. for the contract for Church Street and Sacramento Street Overlays 2006 Project, described in the specifications therefore approved by the City Council on June 7, 2006; and WHEREAS, said bids have been compared, checked, and tabulated and a report thereof filed with the City Manager as follows: BidorAAcafl2n Bird Amount Engbew's Estimate $422,490.00* George Reed, Inc., Lodi $374,791.00" Grante Construction, Stockton $582,735.00" " inciuges A)Wnste Bid Items Nes. 2, 3, and 4 WHEREAS, staff recommends award of the contract for Church Street and Sacramento Street Overlays 2006 Project, be made to the low bidder, George Reed, Inc., of Lodi, California, in the amount of $374,791.00, which includes Alternate Bid Items Nos. 2, 3, and 4. NOW, THEREFORE, BE IT RESOLVED by the Lodi City Council that the award of the contract for Church Street and Sacramento Street Overlays 2006 Project be made to the low bidder, George Reed, Inc., of Lodi, California, in the amount of $374,791.00, which includes Alternate Bid Items Nos. 2, 3, and 4. Dated: August 16, 2006 I hereby certify that Resolution No. 2006-154 was passed and adopted by the City Council of the City of Lodi in a regular meeting held August 16, 2006, by the following vote: AYES: COUNCIL MEMBERS - Beckman, Hansen, Johnson, Mounce, and Mayor Hitchcock NOES: COUNCIL MEMBERS - None ABSENT: CO(JNCIL MEMBERS - None ABSTAIN: COUNCIL MEMBERS - None J NIFE I}ERRiN Interim City Clerk 2006-154