HomeMy WebLinkAboutAgenda Report - August 2, 2006 E-07AGENDA ITEM E-7 CITY OF LODI COUNCIL COMMUNICATION TM AGENDA TITLE: Adopt Resolution Awarding Contract for Municipal Service Center (MSC) Additional Compressed Natural Gas (CNG) Installation Project to Performance Mechanical, Inc., of Pittsburg, CA ($44,600) and Appropriate Additional Funds ($70,000) MEETING DATE: August 2, 2006 PREPARED BY: Public Works Director RECOI&AENDED ACTION: That the City Council adopt a resolution awarding the contract for the above project to Performance Mechanical, Inc. (PMI), of Pittsburg, CA, in the amount of $44,602 and appropriate additional funds in accordance with the recommendation shown below. BACKGROUND INFORMATION: This project consists of the installation of additional Compressed Natural Gas (CNG) fueling equipment within the existing fueling facility at the Municipal Service Center (MSC). The City previously constructed a CNG fueling facility at the MSC to accommodate transit vehicles and miscellaneous CNG -fueled City equipment. This project will install a second compressor at the MSC, allowing for additional fueling capacity for an expanding transit fleet, as well as backup so that the compressors can be serviced without disrupting the fueling capabilities of the City fleet. Council authorized the purchase of the second CNG compressor and auxiliary equipment ($180,000) as a separate bid on December 7, 2005. Bidding the equipment separate from the installation was the most cost effective and efficient way to build the CNG station, reducing the cost of the equipment by avoiding mark-up of the manufacturer's price. Funding for the installation project is through a Congestion Mitigation and Air Quality (CMAQ) grant from the San Joaquin Council of Governments with matching funds (minimum 20%) from Transportation Development Act (TDA) transit capital funds. The total project cost (equipment and installation) is estimated to be $230,000 including contingencies. At the time the grant was submitted, the cost of the additional compressor and its installation was estimated to cost $220,000, however, the actual cost is $230,000 and, therefore, an appropriation of an additional $10,000 is being requested to cover the project cost. Plans and specifications for this project were approved on June 7, 2006. The City received only one bid for this project on July 12, 2006, but the bid from PMI was within the Engineer's estimate. In addition, PMI has proven to be a competent contractor, including serving as the general contractor on the City of Lodi/ LUSD CNG fueling station project. The total installation costs including contingencies are expected to be $50,000. Bidder Location Bid Engineer's Estimate Less than $50,000 Performance Mechanical, Inc. Pittsburg $44,602 APPROVED: /lzg , Blair King, ,ty Manager J1PROJPCTSITRANSITSCNGSTAT1ONtMSC_CNG_ExpansronICAward,doc 712712006 Adopt resolution Awarding Contract for Municipal Service Center (MSC) Additional Compressed Natural Gas (CNG) Installation Project to Performance Mechanical, Inc., of Pittsburg, CA ($44,600) and Appropriate Additional Funds ($10,000) August 2, 2006 Page 2 FISCAL IMPACT: Failure to award the contract for construction of the facility would result in the recently -purchased equipment going unused and a loss of fueling backup capability. FUNDING AVAILABLE: Funds, including a 10% contingency, were appropriated with the approval of the Federal Transit Administration grant in the amount of $220,000. An additional appropriation of $10,000 is required to fund the total project and will come from TDA funds. Project Recap: 1) Equipment and Engineering $180,000 2) Construction (original estimate) $ 40,000 Construction Adjustment (per bid, including contingency) $ 10,000 Revised Project Total: $230,000 tit,402- Ruby Oste, Interim Finance Director Richard C. Prima, Jr. Public Works Director Prepared by Dennis Callahan, Fleet and Facilities Manager Tiffani M. Fink, Transportation Manager RCPIDJCIpmf cc: City Attorney Purchasing officer Transportation Manager J:IPROJECTSITRANSITICNGSTATION`MSC_CNG_Expansion\CAward.doc 7127MOO RESOLUTION NO. 2006-146 A RESOLUTION OF THE LODI CITY COUNCIL AWARDING THE CONTRACT FOR THE MUNICIPAL SERVICE CENTER ADDITIONAL COMPRESSED NATURAL GAS INSTALLATION PROJECT, AND FURTHER APPROPRIATING ADDITIONAL FUNDS FOR THIS PROJECT WHEREAS, in answer to notice duly published in accordance with law and the order of this City Council, sealed bids were received and publicly opened on July 12, 2006, at 11:00 a.m. for the Municipal Service Center Additional Compressed Natural Gas Installation Project, described in the specifications therefore approved by the City Council on June 7, 2006; and WHEREAS, said bids have been compared, checked, and tabulated and a report thereof filed with the City Manager as follows: Bidder Bid Amount Engineer's Estimate Less than $50,000 Performance Mechanical, Inc., Pittsburg $44,602 WHEREAS, staff recommends award of the contract for the Municipal Service Center Additional Compressed Natural Gas Installation Project, be made to the sole bidder, Performance Mechanical, Inc., of Pittsburg, California, in the amount of $44,602.00. NOW, THEREFORE, BE IT RESOLVED by the Lodi City Council that the award of the contract for Municipal Service Center Additional Compressed Natural Gas Installation Project be and the same is hereby awarded to the sole bidder, Performance Mechanical, Inc., of Pittsburg, California, in the amount of $44,602.00; and BE IT FURTHER RESOLVED that an additional $10,000.00 be appropriated from Transportation Development Act funds for this project. Dated: August 2, 2006 I hereby certify that Resolution No. 2006-146 was passed and adopted by the City Council of the City of Lodi in a regular meeting held August 2, 2006, by the following vote: AYES: COUNCIL MEMBERS — Beckman, Hansen, Johnson, Mounce, and Mayor Hitchcock NOES: COUNCIL MEMBERS -- None ABSENT: COUNCIL MEMBERS — None ABSTAIN: COUNCIL MEMBERS — None 4J �JWER ' ZRN Interim -fity Clerk 2006-146