Loading...
HomeMy WebLinkAboutAgenda Report - July 19, 2006 K-07AGENDA ITEM 9' 1 &ft CITY OF LODI COUNCIL COMMUNICATION TM AGENDA 71TLE: Adopt Separate Resolutions Approving Water Supply Assessment Reports for Reynolds Rand Project and Westside -Southwest Gateway Project MEETING DATE: July 19, 2006 PREPARED BY: Public Works Director RECORWENIDED ACTION: That the City Council adopt separate resolutions approving Water Supply Assessment reports for the Reynolds Ranch project and Westside -Southwest Gateway project. BACKGROUND INFORMATION: The Water Supply Assessments for the Reynolds Ranch (Exhibit A) and Westside -Southwest Gateway (Exhibit B) projects were prepared by Public Works Department staff and Willdan Consultants, in accordance with Senate Bill (SB) 610 and Water Code Section 10912. The assessments are in the format designated in State guidelines and document that sufficient water supply is available to serve the projects. (See summary table, next page.) No entitlements are conferred upon these projects by the requested action. Approval of the assessment for each project by the water supplier is a prerequisite to Certification of the Final Environmental Impact Reports. The Reynolds Ranch project site is located south of Harney Lane, west of State Highway 99, and east of the Union Pacific Railroad, as represented in Exhibit C. The Reynolds Ranch project is 220 acres in size, and the land uses include 20 acres of offices, 40 acres of retail commercial sites, 1,084 residential units (mix of low, medium, and high density), parks, elementary school and other uses. The annual water supply required to serve the demands of the project at completion is approximately 501 acre-feet per year. The Westside -Southwest Gateway project site is located westerly of Lower Sacramento Road extending to the General Plan boundary, as represented in Exhibit D. The project is approximately 410 acres in size, and the land uses include 2,090 residential units, elementary school, parks and other uses. The annual water supply required to serve the demands of the project is approximately 887 acre-feet per year. The data presented in the assessments confirm that water supplies are sufficient during normal, single -dry and multiple -dry years over a 20 -year planning horizon to serve the demands of existing development, planned future development within the General Plan, and these proposed projects. A summary of this data is presented below. However, additional future development beyond the current General Plan is expected, and as presented in the 2005 Urban Water Management Plan, demands are expected to exceed supplies by around 2025. The City will need to secure additional water supplies to serve development beyond 2025. Potential future water sources include WID, MORE project (Mokelumne River), recharge using captured storm water runoff, and banked groundwater. A complete master water supply plan will be contained in the new General Plan. APPROVED: —:� Blair Kin ity Manager J-1DEV_SER=C WSA-doc 7114/2006 Adopt Separate Resolutions Approving Water Supply Assessment Reports for Reynolds Ranch Project and Westside -Southwest Gateway Project July 19, 2006 Page 2 Summary of Water Supply and Demands Water Supply Acre Feet per Year Groundwater' 15,000 Supplemental Safe Yield (Reynolds Ranch)" 374 Supplemental Safe Yield (Westside -Southwest Gateway)" 695 Woodbridge Irrigation DiWcf 6,000 Reduction in Demand through Conservation and Meteringd 2,500 Total Supply 24,569 Water Demand Existing City 17,011 Reynolds Ranch 501 Westside -Southwest Gateway 887 Vacant Lands 9.378 Total Supply 19,777 Surplus Supply 4,792 a Safe yield of the groundwater resource underlying the existing City. " Increase in safe yield of the groundwater resource underlying the project area, calculated as the product of 1.7 acre-feet per year per acre times the acreage of the project. Although an implementation plan for the use of the WID surface water has not been decided upon, credit for the supply is permitted by the WSA Guidelines. d Projected reduction of 15% of existing water demand through meter installation and other conservation measures. This does not apply to new construction because the effects of metered water and conservation measures are accounted for in the calculation of water demands. Remaining vacant land based on current General Plan. The following actions by the City Council are recommended: Action A: Adopt resolution approving the Water Supply Assessment for Reynolds Ranch project. Action B. Adopt resolution approving the Water Supply Assessment for Westside -Southwest Gateway project. FISCAL WPACT: None. FUNDING AVAILABLE: Not applicable. 4LSVZ Richard C. Prima, Jr. Public Works Director Prepares! by Wally Sandelin, City Engineer, and Paula J. Fernandez, Senior Traffic Engineer RCP/FWS/PJF/pmf Attachments cc: City Attorney Community Development Director Planting Manager Jeff Atteberry, Willdan Consultants Chatitty Wagner, LSA 5:1Dti=V Sti=RVtCC WSA.doc 7112/2006