HomeMy WebLinkAboutAgenda Report - April 19, 2006 E-10AGENDA ITEM 6110
CITY OF LODI
COUNCIL COMMUNICATION
AGENDA TITLE: Adopt Resolution Accepting Improvements Under Contract for
Lower Sacramento Road Widening Project, Kettleman Lane to Harney Lane, and
Appropriating $5,000 and Receive Notification of Contract Change Orders and
Property Owner Reimbursement
MEETING DATE: April 19,2006
PREPARED BY: Public Works Director
RECOMMENDED ACTION: That the City Council adopt a resolution accepting the improvements
under the "Lower Sacramento Road Widening Project, Kettleman Lane
to Harney Lane" contract and appropriating $5,000. In accordance with
the Contract Change Order Policy, the City Council is being informed of
the change orders approved by the City Managerfor this project since the July 20, 2005, Council meeting.
The Council is also being informed of reimbursement that is due to the property owner.
BACKGROUND INFORMATION: The project was awarded to George Reed, Inc., of Lodi, on
March 16, 2005, in the amount of $2,623,300. The contract has been
completed in substantial conformance with the plans and specifications
approved by City Council.
The original contract completion date was January 6, 2006. Changes in the design and scope of work
resulted in the extension of the completion date to January 26, 2006. The projectwas substantially complete
and in use by the City on November 1, 2005. The delay in final acceptance of the project was due to issues
with the weather and coordination with the associated County project. Detailed below is a description of
contract change orders approved by the City Manager since the July 20, 2005 Council meeting. The total cost
of change orders to date is $708,267.88 or 27% of the original contract. Change Order No. 1 ($12,815) was
for the removal of trees within the street right of way. Change Order No. 2 ($466,762.25) was a major
redesign of the project that included adding the median areas to the roadway and was approved by Council on
July 20, 2005. Excluding Change Order No. 2, the total of contract change orders is $241,505.63 or 9.21 % of
the original contract. Including all change orders, the total contract amount to date is $3,331,567.88. More
detailed descriptions and backup information for the change orders are available in the Public Works
Department.
Change Order No. 3 — This change order is for the cost of adding electrical conduit crossings for future
development as requested by the Electric Utility Department. ($20,278.20)
Change Order No. 4 —This change order is for the cost of importing soil for the median landscape areas. This
work was originally planned to be included in the Median Landscape contract but was included in the roadway
project so that traffic would be less impacted. ($39,340.00)
Chanqe Order No. 5 —This change order is for the cost of rebuilding two existing sewer manholes, change in
the materials used for 13water blow -off valves, and removal and replacement of unsuitable subgrade
materials. ($29,080.36)
Chanqe Order No. 6 —This change order is for the cost of adding tactile warning devices at the sidewalk curb
ramps, as required by the Americans with DisabilitiesAct (ADA). ($3,127.00)
Change Order No. 7 —This change order is for the cost of additional work the contractor had to perform due to
errors in design and surveying during construction. ($43,119.17) This cost was offset by additional work
performed and higher cost of materials which was included at no additional cost to the City.
APPROVED: J '`
Blair Kirf?City Manager
J1 PROJECTS/STREETSILWRSACTOIHARNEYKETTLEMANICAccept_CCO doc 4/1412006
Adopt Resolution Accepting Improvements Under Contract for Lower Sacramento Road Widening Project,
Kettleman Lane to Harney Lane, and Appropriating $5,000 and Receive Notification of Contract Change
Orders and Property Owner Reimbursement
April 19, 2006
Page 2
Chanqe Order No. 8 — This change order is for the cost of additional street signage required to meet standard
needs until associated projects (County Curve, etc.) are completed. ($3,944.50)
Change Order No. 9 —This change order is for the cost of repairing damaged electrical conduits. ($6,053.93)
Change Order No. 10 —This change order is for costs the contractor incurred providing concrete demolition
and water and storm drain service to the property at 13786 Lower Sacramento Road. The City was obligated
for these services under the right-of-way agreement. ($5,309.06)
Change Order No. 11 —This change order is for the cost of adding the concrete apron at the landscape
medians. This work was originally planned to be included in the Median Landscape contract but was included
in the roadway project so that traffic would be less impacted. ($20,150.00)
Chanae Order No. 12 —This change order is for the cost impacts to the contractor as a result of construction
staking, design coordination and work schedule issues. The contractor worked extra shifts to meet the original
road opening deadline (November 1, 2005). The issues that created the delays were not within the
contractor's control. ($38,288.41)
Change Order No. 13 —This change order is for the cost of repairing three trench settlement areas. One area
is at a PG&E trench. PG&E will be charged for costs associated with their trench. (Not to Exceed $20,000.00)
Included in the project cost are improvements to the property at 13786 Lower Sacramento Road associated
with the provision of sewer service, water service, driveway access restoration of site drainage that was
agreed upon by the City Council during a closed session on May 4, 2005. The property owner contracted for
these services. The total improvement project cost for the work amounted to $43,416.00 that consists of
$37,600.00 in construction costs and $5,816.00 in fees. The fees will be reimbursed upon sale, development
or significant modification/remodel to the existing residence. The actual improvement costs exceeded the staff
estimate of $15,000.00 due to unforeseen site conditions. Staff believes the costs to be reasonable and
justified with receipts.
Following acceptance by the City Council, the City Engineerwill file a Notice of Completion with the
County Recorder's office.
FISCAL IMPACT: Not applicable.
FUNDING AVAILABLE: Requested Appropriation: $5,000 from Measure K Congestion Relief funds.
There are sufficient funds budgeted for this project for payment of the change
orders listed above.
L� 72 . pac 4+
Ruby FWte, Interim Finance Director
�t
Richard C. Prima,
Public Works Dire
Prepared by Gary Wiman. Construction Project Manager
RCPIGWlpmf
cc: Joel Harris. Purchasing Officer
G a y Wiman. Construction Project Manager
J,PROJECTSISTREETSNLWRSACTONHARNEYKETTLEMANICAccept_CCO docCAccept_CCO doc 4/1312006
RESOLUTION NO. 2006-58
A RESOLUTIONOF THE LOUI CITY COUNCIL ACCEPTING IMPROVEMENTS
UNDER CONTRACT FOR LOWER SACRAMENTO ROAD WIDENING PROJECT,
KETTLEMAN LANE TO HARNEY LANE, AND FURTHER APPROPRIATING
$5,000 AND RECEIVE NOTIFICATION OF CONTRACT CHANGE ORDERS
AND PROPERTY OWNER REIMBURSEMENT
WHEREAS, the contract for the Lower Sacramento Road Widening Project, Kettleman Lane
to Harney Lane, project was awarded to George Reed, Inc,, of Lodi, on March 16,2005, in the
amount of $2,623,300: and
WHEREAS, the original contract completion date was January 6, 2006. Changes in the
design and scope of work resulted in the extension of the completion date to January 26, 2008. The
project was substantially complete and in use by the City on November 1, 2005. The delay in final
acceptance of the project was due to issues with the weather and coordination with the associated
County project: and
WHEREAS, the contract has been completed in substantial conformance with the plans and
specifications approved by City Council: and
WHEREAS, the total cost of change orders to date is $708,267.88 or 27% of the original
contract. Contract Change Orders, as approved by the City Manager since July 20, 2005, are
identified as follows:
Change Order No. 2 - This was a major redesign of the project that included adding the median
areas to the roadway and was approved by Council on July 20,2005 ($466,762.25),
Change Order No. 3 - This change order is for the cost of adding electrical conduit crossings for
future development as requested by the Electric Utility Department ($20,278.20).
Change Order No. 4 - This change order is for the cost of importing soil for the median landscape
areas. This work was originally planned to be included in the Median Landscape contract but was
included in the roadway project so that traffic would be less impacted ($39,340.00).
Change Order No. 5 - This change order is for the cost of rebuilding tiro existing sewer manholes,
change in the materials used for 13 water blow -off valves, and removal and replacement of
unsuitable subgrade materials ($29,080.36).
Change Order No. 6 - This change order is for the cost of adding Americans with Disabilities Act
required tactile warning devices at the sidewalk curb ramps ($3,127.00).
Chanae Order No. 7 - This change order is for the cost of additional work the contractor had to
perform due to errors in design and surveying during construction ($43,119.17).
Change Order No. 8 - This change order is for the cost of additional street signage required to meet
standard needs until associated projects (CountyCurve, etc.) are completed ($3,944.50).
Change Order No. 9 - This change order is for the cost of repairing damaged electrical conduits
($6,053.93).
Change Order No. 10 - This change order is for costs the contractor incurred providing concrete
demolition and water and storm drain service to the property at 13786 Lower Sacramento Road.
The City was obligated for these services under the right-of-way agreement ($5,309.06).
Change Order No. 11 - This change order is for the cost of adding the concrete apron at the
landscape medians. This work was originally planned to be included in the Median Landscape
contract but was included in the roadway project so that traffic would be less impacted ($20,150.00).
Chanae Order No. 12 — This change order is for the cost impacts to the contractor as a result of
construction staking, design coordination, and work schedule issues. The contractor worked extra
shifts to meet the original road opening deadline (November 1, 2005). The issues that created the
delays were notwithin the contractor's control ($36,288.41).
Chanae Order No. 13 — This change order is for the cost of repairing three trench settlement areas.
One area is at a PG&E trench. PG&E will be charged for costs associated with its trench (not to
exceed $20,000.00).
WHEREAS, included in the project cost are improvements to the property at 13786 Lower
Sacramento Road associated with the provision of sewer service, water service, driveway access
restoration of site drainage that was agreed upon by the City Council during a closed session on
May 4, 2005. The property owner contracted for these services. The total improvement project cost
for the work amounted to $43,416.00 that consists of $37,600.00 in construction costs and $5,616.00
in fees. The fees will be reimbursed upon sale, development, or significant modification/remodel to
the existing residence. The actual improvement costs exceeded the staff estimate of $15,000.00
due to unforeseen site conditions. Staff believes the costs to be reasonable and justified with
receipts.
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Lodi does
hereby accept the improvements under the contract for Lower Sacramento Road Widening Project,
Kettleman Lane to Harney Lane, and hereby directs the City Engineer to file a Notice of Completion
with the County Recorder's office; and
BE IT FURTHER RESOLVED that the Lodi City Council hereby receives notification of
Contract Change Orders and property owner reimbursement; and
BE IT FURTHER RESOLVED that the City Council of the City of Lodi does hereby
appropriate $5,000 for reimbursement to the property owner.
Dated: April 19,2006
hereby certify that Resolution No. 2006-58 was passed and adopted by the City Council of
the City of Lodi in a regular meeting held April 19, 2006, by the following vote:
AYES: COUNCIL MEMBERS— Beckman, Hansen, Johnson, Mounce, and
Mayor H itchcock
NOES: COUNCIL MEMBERS — None
ABSENT: COUNCIL MEMBERS— None
ABSTAIN: COUNCIL MEMBERS— None
SUSANY J. BtAOK TON
City Clerk