Loading...
HomeMy WebLinkAboutAgenda Report - April 5, 2006 E-05AGENDA ITEM P5 CITY OF LODI %V COUNCIL COMMUNICATION TM AGENDA TITLE: Adopt Resolution Approving Plans and Specifications, Authorizing Advertisement for Bids for Lockeford Street and Sacramento Street Traffic Signal and Lighting Project, and Authorizing the City Manager to Execute All Necessary Agreements to Implementthe Project MEETING DATE: April 5,2006 PREPARED BY: Public Works Director RECOMMENDED ACTION: That the City Council adopt a resolution approving the plans and specifications, authorizing advertisement for bids for the Lockeford Street and Sacramento Street Traffic Signal and Lighting project, and authorizing the City Manager to execute all necessary agreements to implement the project. BACKGROUND INFORMATION: The project includes installing a traffic signal, street lighting, wheelchair ramps, and emergency and railroad preemption at the Lockeford Street and Sacramento Street intersection. Signalization for this intersectionwas a mitigation measure identified for the Lodi Station Parking Structure in the February 2001 Environmental Assessment. The intersection was also included in the 2000 Signal Priority Study approved by Council. This intersection is one of the fourteen intersections on the Signal Priority Study List. In 2001, City Council authorized the City Manager to execute a professional services agreement with Y & C Transportation Consultants, Inc., to design this project. In 2002, the plans and specifications for the traffic signal design and an agreement between the City and Union Pacific Railroad Company (UPRR) were ready for Council's approval; however, funding was not available at that time. The agreement between the City and UPRR includes the City installing a railroad preempted signal and UPRR installing preemption circuits for the signal. In 2005, when funding became available, we requested that UPRR update the agreement and cost estimates for this project. In March 2006, we received the revised UPRR agreement. City staff recommends installing the countdown pedestrian signals at this location and future signals to help alleviate pedestrian concerns on how much time remains to cross the roadway. We have included countdown pedestrian signals in the design of the project. The countdown pedestrian signals display the number of seconds remaining in the pedestrian change interval. In 2004, Caltrans adopted the Federal Highway Administration's (FHWA) Manual of Uniform Traffic Control Devices (MUTCD) 2003 Edition which includes the countdown pedestrian signals. Currently, we use educational pedestrian push button signs to briefly describe the walk, flashing hand and steady hand modes. The plans and specifications are on file in the Public Works Department. APPROVED: _-p Blair King, Manager J :PROJECTS �SIGNALS1Lockeford SacramentolCPS&A doc 312112006 Adopt Resolution Approving Plans and Specifications, Authorizing Advertisement for Bids for Lockeford Street and Sacramento Street Traffic Signal and Lighting Project, and Authorizing the City Manager to Execute All Necessary Agreements to Implement the Project April 5, 2006 Page 2 FISCAL IMPACT: Preventative maintenance and repair service costs are estimated to be approximately $550 per year and will be funded by Transportation Development Act funds. FUNDING AVAILABLE: The project estimate is $250,000 and includes project construction, contingency costs, and railroad signal interconnection. The funding source is Transportation Development Act funds. Planned Bid Opening Date: May 3, 2006 Ruby Iste, Interim Finance Director Richard . rrifinalt, Public Works Direc Prepared by Paula J. Fernandez. Senior Traffic Engineer RCPIPJFIpmf cc: City Engineer Street Superintendent Purchasing Officer Police Chief Senior Traffic Engineer Affected Properly Owners J PROJECTS1SIGNALS\Lockeforc4 Sacrarnento\CPS&A doc 3/21/2006 RESOLUTION NO. 2006-48 A RESOLUTION OF THE LODI CITY COUNCIL APPROVING PLANSAND SPECIFICATIONS, AUTHORIZING ADVERTISEMENT FOR BIDS FOR THE LOCKEFORD STREET AND SACRAMENTO STREET TRAFFIC SIGNAL AND LIGHTING PROJECT, AND FURTHER AUTHORIZING THE CITY MANAGER TO EXECUTEALL NECESSARY RAILROAD AGREEMENTS RELATING TO THIS PROJECT WHEREAS, this project includes installing a traffic signal, street lighting, wheelchair ramps, and emergency and railroad preemption at the Lockeford Street and Sacramento Street intersection; and WHEREAS, signalization for this intersection was a mitigation measure identified for the Lodi Station Parking Structure in the February2001 Environmental Assessment; and WHEREAS, this intersection was also included in the 2000 Signal Priority Study approved by Council and was one of the 14 intersections on the Signal Priority Study List; and WHEREAS, in 2001, the City Council authorized the City Manager to execute a professional services agreement with Y & C Transportation Consultants, Inc., to design this project; and WHEREAS, in 2002, the plans and specifications for the traffic signal design and an agreement between the City and Union Pacific Railroad Company (UPRR) were ready for Council's approval; however, funding was not available at that time; and WHEREAS, the agreement between the City and UPRR includes the City installing a railroad preempted signal and UPRR installing preemption circuits for the signal. In 2005, staff requested that UPRR update the agreement and cost estimates for this project, which was received in March 2006; and WHEREAS, staff recommends installing the countdown pedestrian signals at this location and future signals to help alleviate pedestrian concerns on how much time remains to cross the roadway. We have included countdown pedestrian signals in the design of the project. The countdown pedestrian signals display the number of seconds remaining in the pedestrian change interval. NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council does hereby approve the plans and specifications and authorizes advertisement for bids for the Lockeford Street and Sacramento Street Signal and Lighting Project; and BE IT FURTHER RESOLVED that the Lodi City Council hereby authorizes the City Manager to execute all necessary Railroad Agreements relating to this project. Dated: April 5,2006 I hereby certify that Resolution No. 2006-48 was passed and adopted by the City Council of the City of Lodi in a regular meeting held April 5, 2006, by the following vote: AYES: COUNCIL MEMBERS— Hansen, Johnson, Mounce, and Mayor Hitchcock NOES: COUNCIL MEMBERS— None ABSENT: COUNCIL MEMBERS— Beckman ABSTAIN: COUNCIL MEMBERS— None SUSAN J. BLACKSTON City Clerk 2006-48 CITY COUNCIL CITY OF L O D I SUSAN HITCHCOCK. r-ente Mayor BOB JOHNSON, Mayor Pro Tempore JOHNBECKMAN v LARRY 0. HANSEN JOANNE MOUNCE PUBLIC WORKS DEPARTMENT CITY HALL, 221 WEST PINE STREET/ P.O. BOX 3006 LODI, CALIFORNIA 95241-1910 TELEPHONE (209) 333-6706 1 FAX (209) 333-6710 EMAIL pwdept@lodi.gov http:llwww.lodi.gov March 30,2006 Affected Property Owners Mai l o*na List #kb&d BLAIR KING, City Manager SUSAN J. BLACKSTON. City Clerk D. STEPHEN SCHWABAUER, City Attorney RICHARD C. PRIMA, JR., Public Works Director SUBJECT: Adopt Resolution Approving Plans and Specifications, Authorizing Advertisement for Bids for Lockeford Street and Sacramento Street Traffic Signal and Lighting Project, and Authorizing the City Manager to Execute All Necessary Agreements to Implementthe Project Enclosed is a copy of background information on an item on the City Council agenda of Wednesday, April 5, 2006. The meeting will be held at 7 p.m. in the City Council Chamber, Carnegie Forum, 305 West Pine Street. This item is on the consent calendar and is usually not discussed unless a Council Member requests discussion. The public is given an opportunityto address items on the consent calendar at the appropriate time. If you wish to write to the City Council, please address your letter to City Council, City of Lodi, P. O. Box 3006, Lodi. California, 95241-1910. Be sure to allow time for the mail. Or, you may hand -deliver the letter to City Hall, 221 West Pine Street. If you wish to address the Council at the Council Meeting, be sure to fill out a speaker's card (available at the Carnegie Forum immediately prior to the start of the meeting) and give it to the City Clerk. If you have any questions about communicating with the Council, please contact Susan Blackston. City Clerk, at (209) 333-6702. If you have any questions about the item itself, please call Paula Fernandez, Senior Traffic Engineer, at (209) 333-6800, extension 2667. Richard C. Prima, Jr. Public Works Director RCPlpmf Enclosure cc: City Clerk J:IPROJECTSISIGNALS\Lockeford SacramentolNCPS&A.doc property Address 3 W. Lockeford Street STEPHEN &ADRIENNE GIAMMONA 1426 W TOKAY ST LODI CA 95242-3573 TENANT 3 W LOCKEFORD ST LODI CA 95240 302 N. Sacramento Street MAIN STREET PACKING LLC 420 W PINE ST STE 1 LODI CA 95240 10 E. Lockeford Street MICHELINE J NADRA 10210 REFLECTION LN STOCKTON CA 95219-7103 TENANT 10 E LOCKEFORD ST LODI CA 95240 20 N. Sacramento Street RAHID SAFDAR 925 S GARFIELD LODI CA 95240 TENANT 220 N SACRAMENTO ST LODI CA 95240 W. Lockeford Street GENE A WAGNER 1000 SYLVIA DR LODI CA 95240 TENANT 2 W LOCKEFORD ST LODI CA 95240 DLBP CHUCK EASTERLING PRESIDENT PO BOX 1565 LODI CA 95241-1565