HomeMy WebLinkAboutAgenda Report - April 5, 2006 E-05AGENDA ITEM P5
CITY OF LODI
%V COUNCIL COMMUNICATION
TM
AGENDA TITLE: Adopt Resolution Approving Plans and Specifications, Authorizing
Advertisement for Bids for Lockeford Street and Sacramento Street Traffic
Signal and Lighting Project, and Authorizing the City Manager to Execute All
Necessary Agreements to Implementthe Project
MEETING DATE: April 5,2006
PREPARED BY: Public Works Director
RECOMMENDED ACTION: That the City Council adopt a resolution approving the plans and
specifications, authorizing advertisement for bids for the
Lockeford Street and Sacramento Street Traffic Signal and Lighting
project, and authorizing the City Manager to execute all necessary
agreements to implement the project.
BACKGROUND INFORMATION: The project includes installing a traffic signal, street lighting,
wheelchair ramps, and emergency and railroad preemption at the
Lockeford Street and Sacramento Street intersection. Signalization
for this intersectionwas a mitigation measure identified for the Lodi
Station Parking Structure in the February 2001 Environmental Assessment. The intersection was also
included in the 2000 Signal Priority Study approved by Council. This intersection is one of the fourteen
intersections on the Signal Priority Study List.
In 2001, City Council authorized the City Manager to execute a professional services agreement with
Y & C Transportation Consultants, Inc., to design this project. In 2002, the plans and specifications for
the traffic signal design and an agreement between the City and Union Pacific Railroad Company
(UPRR) were ready for Council's approval; however, funding was not available at that time. The
agreement between the City and UPRR includes the City installing a railroad preempted signal and
UPRR installing preemption circuits for the signal. In 2005, when funding became available, we
requested that UPRR update the agreement and cost estimates for this project. In March 2006, we
received the revised UPRR agreement.
City staff recommends installing the countdown pedestrian signals at this location and future signals to
help alleviate pedestrian concerns on how much time remains to cross the roadway. We have included
countdown pedestrian signals in the design of the project. The countdown pedestrian signals display the
number of seconds remaining in the pedestrian change interval. In 2004, Caltrans adopted the Federal
Highway Administration's (FHWA) Manual of Uniform Traffic Control Devices (MUTCD) 2003 Edition
which includes the countdown pedestrian signals. Currently, we use educational pedestrian push button
signs to briefly describe the walk, flashing hand and steady hand modes.
The plans and specifications are on file in the Public Works Department.
APPROVED: _-p
Blair King, Manager
J :PROJECTS �SIGNALS1Lockeford SacramentolCPS&A doc 312112006
Adopt Resolution Approving Plans and Specifications, Authorizing Advertisement for Bids for
Lockeford Street and Sacramento Street Traffic Signal and Lighting Project, and Authorizing the
City Manager to Execute All Necessary Agreements to Implement the Project
April 5, 2006
Page 2
FISCAL IMPACT: Preventative maintenance and repair service costs are estimated to be
approximately $550 per year and will be funded by Transportation
Development Act funds.
FUNDING AVAILABLE: The project estimate is $250,000 and includes project construction,
contingency costs, and railroad signal interconnection. The funding source
is Transportation Development Act funds.
Planned Bid Opening Date: May 3, 2006
Ruby Iste, Interim Finance Director
Richard . rrifinalt,
Public Works Direc
Prepared by Paula J. Fernandez. Senior Traffic Engineer
RCPIPJFIpmf
cc: City Engineer
Street Superintendent
Purchasing Officer
Police Chief
Senior Traffic Engineer
Affected Properly Owners
J PROJECTS1SIGNALS\Lockeforc4 Sacrarnento\CPS&A doc 3/21/2006
RESOLUTION NO. 2006-48
A RESOLUTION OF THE LODI CITY COUNCIL APPROVING PLANSAND
SPECIFICATIONS, AUTHORIZING ADVERTISEMENT FOR BIDS FOR THE LOCKEFORD
STREET AND SACRAMENTO STREET TRAFFIC SIGNAL AND LIGHTING PROJECT,
AND FURTHER AUTHORIZING THE CITY MANAGER TO EXECUTEALL NECESSARY
RAILROAD AGREEMENTS RELATING TO THIS PROJECT
WHEREAS, this project includes installing a traffic signal, street lighting, wheelchair ramps, and
emergency and railroad preemption at the Lockeford Street and Sacramento Street intersection; and
WHEREAS, signalization for this intersection was a mitigation measure identified for the Lodi
Station Parking Structure in the February2001 Environmental Assessment; and
WHEREAS, this intersection was also included in the 2000 Signal Priority Study approved by
Council and was one of the 14 intersections on the Signal Priority Study List; and
WHEREAS, in 2001, the City Council authorized the City Manager to execute a professional
services agreement with Y & C Transportation Consultants, Inc., to design this project; and
WHEREAS, in 2002, the plans and specifications for the traffic signal design and an agreement
between the City and Union Pacific Railroad Company (UPRR) were ready for Council's approval;
however, funding was not available at that time; and
WHEREAS, the agreement between the City and UPRR includes the City installing a railroad
preempted signal and UPRR installing preemption circuits for the signal. In 2005, staff requested that
UPRR update the agreement and cost estimates for this project, which was received in March 2006; and
WHEREAS, staff recommends installing the countdown pedestrian signals at this location and
future signals to help alleviate pedestrian concerns on how much time remains to cross the roadway. We
have included countdown pedestrian signals in the design of the project. The countdown pedestrian
signals display the number of seconds remaining in the pedestrian change interval.
NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council does hereby approve the plans
and specifications and authorizes advertisement for bids for the Lockeford Street and Sacramento Street
Signal and Lighting Project; and
BE IT FURTHER RESOLVED that the Lodi City Council hereby authorizes the City Manager to
execute all necessary Railroad Agreements relating to this project.
Dated: April 5,2006
I hereby certify that Resolution No. 2006-48 was passed and adopted by the City Council of the
City of Lodi in a regular meeting held April 5, 2006, by the following vote:
AYES: COUNCIL MEMBERS— Hansen, Johnson, Mounce, and Mayor Hitchcock
NOES: COUNCIL MEMBERS— None
ABSENT: COUNCIL MEMBERS— Beckman
ABSTAIN: COUNCIL MEMBERS— None
SUSAN J. BLACKSTON
City Clerk
2006-48
CITY COUNCIL
CITY OF L O D I
SUSAN HITCHCOCK.
r-ente
Mayor
BOB JOHNSON,
Mayor Pro Tempore
JOHNBECKMAN
v
LARRY 0. HANSEN
JOANNE MOUNCE PUBLIC WORKS DEPARTMENT
CITY HALL, 221 WEST PINE STREET/ P.O. BOX 3006
LODI, CALIFORNIA 95241-1910
TELEPHONE (209) 333-6706 1 FAX (209) 333-6710
EMAIL pwdept@lodi.gov
http:llwww.lodi.gov
March 30,2006
Affected Property Owners Mai l o*na List #kb&d
BLAIR KING,
City Manager
SUSAN J. BLACKSTON.
City Clerk
D. STEPHEN SCHWABAUER,
City Attorney
RICHARD C. PRIMA, JR.,
Public Works Director
SUBJECT: Adopt Resolution Approving Plans and Specifications, Authorizing
Advertisement for Bids for Lockeford Street and Sacramento Street Traffic
Signal and Lighting Project, and Authorizing the City Manager to Execute All
Necessary Agreements to Implementthe Project
Enclosed is a copy of background information on an item on the City Council agenda of
Wednesday, April 5, 2006. The meeting will be held at 7 p.m. in the
City Council Chamber, Carnegie Forum, 305 West Pine Street.
This item is on the consent calendar and is usually not discussed unless a
Council Member requests discussion. The public is given an opportunityto address
items on the consent calendar at the appropriate time.
If you wish to write to the City Council, please address your letter to City Council,
City of Lodi, P. O. Box 3006, Lodi. California, 95241-1910. Be sure to allow time for the
mail. Or, you may hand -deliver the letter to City Hall, 221 West Pine Street.
If you wish to address the Council at the Council Meeting, be sure to fill out a speaker's
card (available at the Carnegie Forum immediately prior to the start of the meeting) and
give it to the City Clerk. If you have any questions about communicating with the
Council, please contact Susan Blackston. City Clerk, at (209) 333-6702.
If you have any questions about the item itself, please call Paula Fernandez,
Senior Traffic Engineer, at (209) 333-6800, extension 2667.
Richard C. Prima, Jr.
Public Works Director
RCPlpmf
Enclosure
cc: City Clerk
J:IPROJECTSISIGNALS\Lockeford SacramentolNCPS&A.doc
property
Address
3 W. Lockeford Street
STEPHEN &ADRIENNE GIAMMONA
1426 W TOKAY ST
LODI CA 95242-3573
TENANT
3 W LOCKEFORD ST
LODI CA 95240
302 N. Sacramento Street
MAIN STREET PACKING LLC
420 W PINE ST STE 1
LODI CA 95240
10 E. Lockeford Street
MICHELINE J NADRA
10210 REFLECTION LN
STOCKTON CA 95219-7103
TENANT
10 E LOCKEFORD ST
LODI CA 95240
20 N. Sacramento Street
RAHID SAFDAR
925 S GARFIELD
LODI CA 95240
TENANT
220 N SACRAMENTO ST
LODI CA 95240
W. Lockeford Street
GENE A WAGNER
1000 SYLVIA DR
LODI CA 95240
TENANT
2 W LOCKEFORD ST
LODI CA 95240
DLBP
CHUCK EASTERLING PRESIDENT
PO BOX 1565
LODI CA 95241-1565