Loading...
HomeMy WebLinkAboutAgenda Report - March 8, 2007 B-01 SMJoint hag of Library Board of Trustees and Lodi City Council March 8, 2007 1. Introduction --Joan Villarreal 2. Tour of the library—develop personal awareness of the critical needs of the library a. Safety issues i. Carpeting ii. tanking fountains iii. Itestrooms: ADA compliance iv. lWtlqualae retrofitting: Code compliance v. Location of CLC in relation to the Children's Room: problems A. Cabling and Electrical wiring and connections vii. Systems furniture in workroom: ergonomics and work flow viii. Security 3. Conclusion—Juan Villarreal a. Place ofthe Library in the City of Lodi b. Renovation budget 0 IGM 611 k -A 1Wns Checked Out Visitors P1Nic Computer Users Library Cards Issued Queshons Answered Wits to Likorary Website iiogroms Inducing Sto*imes Atendance Lodi Public Library Statistics Annual 11Aorith lly AAAAAv��lerage 300,000 25,000 290,000 24,200 31,000 2,600 350 18,000 1,500 2,750 320 26 10,900 800 Community Room Usage 500 41 Lodi PWMic Library Renovati$n Estimated Proijeet Costs (excluding work fWKIed by CLOG, Public Benefit Program, and Library Fund) Summary ESMURed costs $903,207 Library Support Ospanization and Community funding $w,090 Library Trustees $250,000 Library Foundation $200,000 Library Friends $10,000 Shortfall V. bru J �3 n � is Z0 1. security System A. Interior Doors $12,000 B. E)derior Doors $13,000 Total $26,000 Il. Public Arma A. Carpet and painting $105,000 B. Calling toe painting $12,500 C. Children's Area $11,000 D. Teen Area $12,000 E. Adult Area 1. Living Rooms $18,000 2. Study Rooms $20,000 F. Cafe seating $6,000 G. Activity Room conversion $15,000 H. Service Desks 1. Service Desks $15,000 2. Self -checks $58,000 3. Catalog stations $15,000 I. Display Fumiture 1. Furniture $19,000 2. Slat wall $21,€!00 J. General 1. Energy Upgrade. Lighting $22,860 2. Signs $10,000 3. Shelving $10,000 4. Front doors $26,000 5. Secur$y gates $4,000 8. Earthquake retrofit --Code compliance $108,340 ••��' 7. Donor recognition $2,000 8. Restrooms (Children's and Staff)—ADA compliance $50,000 Total $510,700 III. WYOWQam A. Fkwft and psiOng $35,000 B. Systems furniture $90,000 C. Book carts $3,000 D. Book drop --new $4,000 E. Belt drop--repl. cart $1,000 Tam $133,009 1V. Genwal A. ElectricaliCabling $32,491 B. Qemolftion $5,000 C. Moving out -in $150,000 TOW $97,491 V. Ove*ead A. Contractor profit $70,850 B. Contractor bond $7,085 C. Contingency $59,081 Til $137,014 Grand Total $003,207