AGENDA TITLE: Set P lic Heafng for March 21, 2007, to Consider Resoiudon Establishing
Area of Benefit and Reimbursable Costs for Lower Sacramento Road
(KettleMan Lane to Harney Lane) Improvements
MEETING DATE: February 21, 2007
PREPAIED BY: Public Works Director
,. IIIIAylllll ISI I�I�PIIIIII��I�IIIII��iliPl
RECOMMENDED ACTION: Set a public hearing for March 21, 2007, to consider a resolution
establishing an Area of Benefit and Reimbursable Costs for
Lower Sacramento Road (Kettleman Lane to Harney Lane)
Improvements benefiting the parcels shown on Exhibit A.
BACKGROUND INFORMATiDN: As part of the City's Lower Sacramento Road (Kettleman Lane to
Harney Lane) project and the County's Harney Curve project, more
than $905,000 in public improvements were constructed that benefit
the adjacent parcels and would be required to be installed at the
time of development of those parcels. To recover those costs, staff recommends formation of an Area of
Benefit pursuant to Lodi Municipal Code 16.40.030.
The boundary of the Area of Benefit is presented in Exhibit A. The improvements installed at City
expense for the benefit of future development are described by parcel in Exhibit B. Generally, the
improvements include water, newer, storm drain, traffic signal, and dry utility conduits that are not
required for the roadway project but were installed to avoid trenching in the new roadway in the future.
Calculation of the reimbursable costs is presented in Exhibit C. The calculation is based upon the
contract quantities and unit prices from the two separate projects. Staff recommends the reimbursable
costs be combined into the groupings shown in Exhibit A to reflect the expected flow of development
applications. The total reimbursement to the City is calculated to be $905,599.84.
Payment of reimbursement costs will be a condition of approval for any future applications for
entitlements, including development plans, development agreements, tentative subdivision maps, lot line
adjustments, and final maps for the benefiting parcel groups. The payment would be collected at the
time of City Council approval of a subdivision map within each group and the amount collected would be
prorated based upon the area of the map. The groups and the total reimbursement (rounded) for each
group is listed below (note the parcels on Harney Lane east of Lower Sacramento Road are not grouped,
hence the sum of the figures below do not equal the above total).
1. Lodi Shopping Center $81,748
2_ Olive Drive Group $44,480
3. Paterson Group $108,397
4. Southwest Gateway Group $596,004
APPROVED:
Blair Kind,,-^ Manager
K:1VVPIDEV_S RV1CCSetPHAreaofBenefitLwr$ac2,doe 2115/2007
Set Public Hearing for March 21, 2007, to Consider Resolution Establishing Area of Benefit and
Reimbursable Costs for Lower Sacramento Road (Kettleman Lane to Harney Lane) Improvements
February 21, 2007
Page 2
For the parcels on Harney Lane east of Lower Sacramento Road, the reimbursement would be collected
as a condition of delivering City services for water, sewer or storm drainage or, following annexation into
the City, as a condition of entlitlement.
Pursuant to LMC Section 15.64.080, the reimbursable amount will be adjusted annually to include an
amount attributable to interest, which will be based on the change in the Engineering News Record
(ENR) 20 Cities Construction Cost Index from January 1, 2006 to January 1' of the year of
reimbursement. The beginning ENR index is 7660.
In conformance with LMC 16.40, staff recommends that Council set a public hearing to establish an Area
of Benet and Reimbursable frosts to recover the cost of improvements constructed with the
Lower Sacramento Road (Keftleman Lane to Harney Lane) project that benefit adjacent properties.
FISCAL IMPACT: Not applicable.
FUMMNG AVAILABLE: Not applicable.
Richard C. Prima, Jr.
Public Works Director
Prepared by F. Wally Sandelin, City EngWieer/Deputy Public Works Director
RCPIFWSItmf
Attachments
cc: Senior Civil Engineer Welch
Awociatre Civi Engineer Lindseth
Associate CiA Engineer Chang
Prperty Owners
K1WPIDEV SERV\CCSetPHAreaot3enefitLwrSac2.doc 2A 512007
U _:r:•► ;
�FOK PUBLICCITY OF LODI
.
Exhibit A
AREA OF BENEFIT
LOWER SACRAMENTO RD
KETTLEMAN TO HARNEY
�L
22 2,0
r----------- !�!Meman Ln. Kedeman Ln.
1
2
4
6
7
8
5
9
13A78
upine
20 end Creek
15 16
22
ze
8
21 l f
23
DeBenedettl Park
ul
■� Iii
ommumm
im®immom
Blvd.
06X035
AREA OF
IMPROVEMENTS
SITE NO.
APN
ACREAGE
1
058-030-13
9.26 AC.
2
058-030-03
87.72 AC.
3
058-030-04
1.03 AC.
4
058-030-05
8.17 AC.
5
058-030-06
1.53 AC.
6058-040-01
39.09 AC.
7
05&040-02
39.07 AC.
8
058-040-04
14.28 AC.
9
058-040-05
5.41 AC.
10
058-070-07
1.13 AC.
11
058-070-08
1.14 AC.
12
058-070-09
1.21 AC.
13
058-140-04
1.03 AC.
14
058-140-05
1.47 AC.
15
058-140-06
0.90
16
058-140-07
0.72 AC.
17
058-140-08
0.70 AC.
18
058-140-09
0.36 AC.
19
058-140-10
0.36 AC.
20
058-140-11
0.59 AC.
21
0513-140-12
19.50 AC.
4
2.30 AC.
23
058-14052
19.40 AC.
24
058-230-06
0.46 AC.
25
058-230-07
0.46 AC.
26
058-230-08
0.46 AC.
27
058-230-09
0.46 AC.
28
058-230-10
2.49 AC.
1"=800'
0
LODI
NG
CE
TER
OLIV
IDIVE
G
OU
PETE
'R
IIP
SOU
HWEST GATEWAY GR
Exhibit A
AREA OF BENEFIT
LOWER SACRAMENTO RD
KETTLEMAN TO HARNEY
�L
22 2,0
r----------- !�!Meman Ln. Kedeman Ln.
1
2
4
6
7
8
5
9
13A78
upine
20 end Creek
15 16
22
ze
8
21 l f
23
DeBenedettl Park
ul
■� Iii
ommumm
im®immom
Blvd.
06X035
Exhibit B
Summary of Lower Sacramento Road Reimbursements by Parcel
The Lower Sacramento Road Widening Project consisted of reconstructing approximately 6,500 feet of
roadway generally between Kettleman Lane and Harney Lane and Century Boulevard between
Sylvan Lane and Lower Sacramento Road. Three contracts were awarded, two by the City of Lodi and one
by San Joaquin County. They consisted of the Lower Sacramento Road Widening Project (City),
Century Boulevard Construct Project (City) and the Harney Curve Project (County).
The Harney Lane work consisted of removing the old County roadway and reconstructing a new wider
roadway in the approximate same horizontal and vertical location. Right of way was obtained from the
adjacent landowners that would accommodate the full future widening of the roadway. Dedication of the
rights of way was generally traded for the roadway improvements. Storm drainage facilities were installed
to convey runoff from the new roadway to the adjacent storm drainage basin. Existing overhead PG&E
distribution lines, ATT phone lines, and Comcast cable lines were relocated to the ultimate future location
as allowed by the right of way dedications.
At the time the planning and design studies took place, there was no evidence that development of the
adjacent vacant parcels would occur any time in the near future. At the time of construction, the City was
processing applications for development. Recognizing the City's preference not to open trench across new
streets and the cost savings of constructing utilities crossing the roadway during a full closure condition, it
was determined that many of the future utilities required to serve the new development could and should be
installed concurrently with the construction of the roadway improvements.
The following provides a property specific description of the facilities constructed and the cost share
methodology for determining the fair share costs assignment to the property.
Lodi Shopping Center
Site 1: BDC Lodi III 058-030-13
8 -inch Sanitary Sewer Service: 54 feet of pipe was constructed at an existing manhole providing for a
future sanitary sewer service to the site. Another 38 feet of pipe was constructed and a manhole installed
for the connection to provide for a future sanitary sewer connection to the site. Costs for the pipe and one-
half of the manhole is allocated to the site at a price of $18,570.
10 -inch Water Main: 496 feet of pipe was constructed along the frontage of the site. Half of the cost or
248 feet is allocated to this site for a cost of $12,152.
10 -inch Water Valve and Service Stub: Two 10 -inch service stubs with a valve at the main were installed
along with 86 feet and 105 feet of 10 -inch water pipe extended to the site. The total cost was $13,789.
Lodi Electric Utility Conduit Crossing: A gang of (1) 2 -inch conduit, (1) 4 -inch conduit, and (3) 6 -inch
conduits was installed across the street (101.5 feet) at the southerly driveway for future underground phone,
television and electrical power to the site. One half of the cost is allocated to the site at a price of $4,573.
Future Traffic Signal Conduit: One conduit each of size 2 -inch and 4 -inch were installed the 100 feet
across the street. The full cost is allocated to the site of $2,390.
Design Changes to accommodate the future Lodi Shopping Center Driveway with turn pockets and the
traffic signal were completed by Mark Thomas and Company. One-third of the cost is allocated to the site
at a price of $18,150.
Interim Safety and Traffic Control: In order to prohibit traffic from using the left -turn pockets at the future
driveway location, K -rail and delineators were installed at a cost of $4,692.
With ten percent added for Engineering and Administration, the total reimbursable cost is $81,748.
K:\WP\DEV SERV\CCSetPHAreaofBenefitLwrSac ExB.doc 1
Southwest Gateway Group
Site 2: Van Ruiten 058-030-03
Industrial Waste (30 -inch) Realignment: The manhole and stub (27 feet) required for the realignment of
the Industrial Waste Trunkline at the north side of the site is required for the new development. The cost of
these facilities is $7,810.
Domestic Waste (21 -inch) Realignment: The manhole and stub (38 feet) required for the realignment of
the Domestic Waste Trunkline at the north side of the site is required for the new development. The cost of
these facilities is $12,030.
Domestic Waste (42 -inch) Realignment: The pipe segment at Century Boulevard across
Lower Sacramento Road is required for the realignment that is driven by the new development. The cost of
the 218 feet of pipe is $85,020.
Storm Drainage Outfall (I -Basin to G-Basin/Outfall): The 48 -inch pipe segment at Century Boulevard
across Lower Sacramento Road is the outfall line from I -Basin to the WID Terminal Drainage. The cost of
the 242 feet of pipe is $49,610.
10 -inch Water Main: The combined frontage width is 492 feet, and 492 feet of water pipe was constructed
along the frontage of the site. Half of the cost or 246 feet is allocated to this site for a cost of $12,054.
10 -inch Water Valve and Service Stub: Two 10 -inch service stubs with a valve at the main were installed
along with 74 feet and 131 feet of 10 -in water pipe extended to the site. The total cost was $14,475.
Lodi Electric Utility Conduit Crossing: At the south side of Century Boulevard, a 132 -foot conduit
crossing of Lower Sacramento Road was constructed with (2) 2 -inch conduits, (2) 4 -inch conduits, and (2)
6 -inch conduits. Half of the cost of this crossing was assigned to Site 2. In addition, an 86 -foot conduit
crossing of Century Boulevard on the west side of Lower Sacramento Road was constructed with (1) 2 -inch
conduit, (2) 4 -inch conduits, and (2) 6 -inch conduits. The cost of this crossing was assigned to Site 2. The
total cost for the two conduit crossings is $13,730.20.
48 -inch Storm Drain (Century Boulevard): The storm drain outlet piping for I -Basin was constructed in the
correct location with the Lower Sacramento Road and Century Boulevard projects. The total length of pipe
was 447 feet and Site 2 was assigned half of the cost. The cost of this piping was $86,817.50.
Traffic Signal at Century Boulevard: The traffic signal at this location was assigned one-quarter to each of
the adjoining large parcel sites. The cost of the traffic signal attributed to Site 2 is $38,325.00.
With ten percent added for Engineering and Administration, the total reimbursable cost is $351,281.
Site 3: Van Ruiten 058-030-04
10 -inch Water Main: The combined frontage width is 90 feet, and 90 feet of water pipe was constructed
along the frontage of the site. Half of the cost or 45 feet is allocated to this site for a cost of $4,410.
Lodi Electric Utility Conduit Crossing: A 97 -foot conduit crossing of Lower Sacramento Road was
constructed with (3) 2 -inch conduits and (2) 4 -inch conduits for future underground phone, television and
electrical power to the site. One half of the cost is allocated to Site 3 and one half to Site 21 at a price of
$4,910 each.
With ten percent added for Engineering and Administration, the total reimbursable cost is $10,252.
K:\WP\DEV SERV\CCSetPHAreaofBenefitLwrSac ExB.doc 2
Site 4: Van Ruiten 058-030-05
10 -inch Water Main: The frontage width is 660 feet, and 660 feet of water pipe was constructed along the
frontage of the site. Half of the cost or 330 feet is allocated to this site for a cost of $16,170.
Water Valves and Service Stubs: One 6 -inch service stub with a 6 -inch valve at the main was installed
along with 70 feet of 6 -inch water pipe extended to the site. One 10 -inch service stub with a 10 -inch valve
at the main and 74 feet of 10 -inch pipe was installed. The total cost was $9,993.50.
With ten percent added for Engineering and Administration, the total reimbursable cost is $27,562.
Site 6: Schumacher 058-040-01
10 -inch Water Valve and Service Stub: One 10 -inch service stub with a valve at the main was installed
along with 68 feet of 10 -inch water pipe extended to the site. The total cost was $5,547.
Lodi Electric Utility Conduit Crossing: A 107 -foot conduit crossing of Lower Sacramento Road was
constructed with (2) 2 -inch conduits and (1) 4 -inch conduit for future underground phone, television and
electrical power to the site. One half of the cost is allocated to Site 6 and one half to the park site at a price
of $3,309 each.
Traffic Signal at Century Boulevard: The traffic signal at this location was assigned one-quarter to each of
the adjoining large parcel sites. The cost of the traffic signal attributed to Site 2 is $38,325.00.
With ten percent added for Engineering and Administration, the total reimbursable cost is $147,398.
Site 7: Schumacher 058-040-02
10 -inch Water Valve and Service Stub: One 10 -inch service stub with a valve at the main was installed
along with 72 feet of 10 -inch water pipe extended to the site. The total cost was $5,743.
Lodi Electric Utility Conduit Crossing: A 124 -foot conduit crossing of Lower Sacramento Road was
constructed with (2) 2 -inch conduits and (1) 4 -inch conduit for future underground phone, television and
electrical power to the site. One half of the cost is allocated to Site 7 and one half to the Vintage Oaks
subdivision at a price of $3,844 each.
With ten percent added for Engineering and Administration, the total reimbursable cost is $10,546.
Site 8: Schumacher 058-040-04
10 -inch Water Main: The frontage width is 317 feet, and 317 feet of 10 -inch water pipe was constructed
along the frontage of the site. Half of the cost or 158 feet and half of the cost of the inline 10 -inch valve is
allocated to this site for a cost of $8,849.50.
8 -inch Water Valve and Service Stub: One 8 -inch service stub with a valve at the main was installed along
with 62 feet of 8 -inch water pipe extended to the site. The total cost was $4,095.
Lodi Electric Utility Conduit Crossing: A 119 -foot conduit crossing of Lower Sacramento Road was
constructed with (2) 2 -inch conduits and (1) 4 -inch conduit for future underground phone, television and
electrical power to the site. One half of the cost is allocated to Site 8 and one half to the City at a price of
$3,697 each.
With ten percent added for Engineering and Administration, the total reimbursable cost is $18,306.
K:\WP\DEV SERV\CCSetPHAreaofBenefitLwrSac ExB.doc 3
Site 9: Schumacher 058-040-05
10 -inch Water Main (City Project): The frontage width is 167 feet, and 167 feet of 10 -inch water pipe was
constructed along the frontage of the site. Half of the cost or 84 feet and half of the cost of the inline
10 -inch valve is allocated to this site for a cost of $5,223.50.
10 -inch Water Main (County Project): Water main was installed on Lower Sacramento Road and
Harney Lane in lengths of 326 feet and 66 feet, respectively. Half of the cost or 163 feet and 33 feet and
half of the cost of the inline 10 -inch valve is allocated to this site for a cost of $15,337.
Lodi Electric Utility Conduit Crossing: One crossing of Lower Sacramento Road [2 -inch (2), 4 -inch (1),
6 -inch (2)] and one crossing of Harney Lane [2 -inch (2), 4 -inch (1), 6 -inch (1)] were installed. Half of the
cost of each is allocated to this site for a cost of $7,312.
With ten percent added for Engineering and Administration, the total reimbursable cost is $30,660.
Site 23: Peterson 058-140-52
10 -inch Water Main: The frontage width is 666 feet, and 666 feet of water pipe was constructed along the
frontage of the site. Half of the cost or 333 feet is allocated to this site for a cost of $16,317.
Traffic Signal at Century Boulevard: The traffic signal at this location was assigned one-quarter to each of
the adjoining large parcel sites. The cost of the traffic signal attributed to Site 2 is $38,325.
Lodi Electric Utility Conduit Crossing: A 150 -foot conduit crossing of Century Boulevard was constructed
with (1) 2 -inch conduit, (1) 4 -inch conduit and (3) 6 -inch conduits for future underground phone, television
and electrical power to the site. The whole cost is allocated to Site 23at a price of $11,550.
With ten percent added for Engineering and Administration, the total reimbursable cost is $72,811.
Site 22: Peterson 058-140-14
10 -inch Water Main: The frontage width is 84 feet, and 84 feet of water pipe was constructed along the
frontage of the site. Half of the cost or 42 feet is allocated to this site for a cost of $2,058.
Lodi Electric Utility Conduit Crossing: A 101.5 -foot conduit crossing of Lower Sacramento Road was
constructed with (1) 2 -inch conduit, (1) 4 -inch conduit and (3) 6 -inch conduits for future underground
phone, television and electrical power to the site. One half of the cost is allocated to Site 1 and one half to
Site 22 at a price of $4,573 each.
With ten percent added for Engineering and Administration, the total reimbursable cost is 7,294.
Site 21: Peterson 058-140-12
10 -inch Water Main: The frontage width is 662 feet, and 662 feet of water pipe was constructed along the
frontage of the site. Half of the cost or 331 feet is allocated to this site for a cost of $16,219.
Water Valves and Service Stubs: One 6 -inch service stub with a 6 -inch valve at the main was installed
along with 16 feet of water pipe extended to the site. One 10 -inch service stub consisting of 15 feet of
10 -inch pipe was installed. The total cost was $6,257.
Lodi Electric Utility Conduit Crossing: A 97 -foot conduit crossing of Lower Sacramento Road was
constructed with (3) 2 -inch conduits and (2) 4 -inch conduits for future underground phone, television and
electrical power to the site. One half of the cost is allocated to Site 3 and one half to Site 21 at a price of
$4,910 each.
K:\WP\DEV SERV\CCSetPHAreaofBenefitLwrSac ExB.doc 4
With ten percent added for Engineering and Administration, the total reimbursable cost is 28,292.
Olive Drive Group
Sites 13 through 20
The group of parcels is combined and the fair share cost assigned to each individual parcel is based upon
acreage. The total acreage of the area is 6.13 acres.
10 -inch Water Main: The frontage width is 778 feet, and 778 feet of water pipe was constructed along the
frontage of the site. Half of the cost or 389 feet is allocated to this site for a cost of $19,061.
8 -inch Water Valve and Service: 11 feet of pipe was constructed and a new valve installed to provide
service to the site. The total cost was $2,310.
8 -inch Sanitary Sewer Service: 54 feet of pipe was constructed at a new manhole providing for a future
sanitary sewer service to the site. A manhole was installed and half the cost was assigned to this site for a
total of $11,540.
18 -inch Storm Drain Service: 31 feet of pipe was constructed at a new manhole providing for a future
storm drain service to the site. A manhole was installed and the whole cost was assigned to this site
because it was the only connection to the manhole. The total cost was $7,525.
With ten percent added for Engineering and Administration, the total reimbursable cost is $44,480.
Harney Lane (East of Lower Sacramento Road)
Site 10: HMm 058-070-07
10 -inch Water Main: The frontage width is 206 feet, and 206 feet of water pipe was constructed along the
frontage of the site. Half of the cost or 103 feet is allocated to this site for a cost of $7,416.
With ten percent added for Engineering and Administration, the total reimbursable cost is $8,158.
Site 11: Bell 058-070-08
10 -inch Water Main: The frontage width is 206 feet, and 206 feet of water pipe was constructed along the
frontage of the site. Half of the cost or 103 feet is allocated to this site for a cost of $7,416.
With ten percent added for Engineering and Administration, the total reimbursable cost is $8,158.
Site 12: Woods 058-070-09
10 -inch Water Main: The frontage width is 206 feet, and 206 feet of water pipe was constructed along the
frontage of the site. Half of the cost or 103 feet is allocated to this site for a cost of $7,416.
With ten percent added for Engineering and Administration, the total reimbursable cost is $8,158.
Site 24: Galindo 058-230-06
10 -inch Water Main: The frontage width is 66 feet, and 66 feet of water pipe was constructed along the
frontage of the site. Half of the cost or 33 feet is allocated to this site for a cost of $2,376.
With ten percent added for Engineering and Administration, the total reimbursable cost is $2,614.
K:\WP\DEV SERV\CCSetPHAreaofBenefitLwrSac ExB.doc 5
Site 25: Stice 058-230-07
10-inch Water Main: The frontage width is 66 feet, and 66 feet of water pipe was constructed along the
frontage of the site. Half of the cost or 33 feet is allocated to this site for a cost of $2,376.
With ten percent added for Engineering and Administration, the total reimbursable cost is $2,614.
Site 26: Sanchez 058-230-08
10-inch Water Main: The frontage width is 66 feet, and 66 feet of water pipe was constructed along the
frontage of the site. Half of the cost or 33 feet is allocated to this site for a cost of $2,376.
With ten percent added for Engineering and Administration, the total reimbursable cost is $2,614.
Site 27: Sandoval 058-230-09
10-inch Water Main: The frontage width is 66 feet, and 66 feet of water pipe was constructed along the
frontage of the site. Half of the cost or 33 feet is allocated to this site for a cost of $2,376.
With ten percent added for Engineering and Administration, the total reimbursable cost is $2,614.
Site 28: Schumacher 058-230-10
10-inch Water Main (County Project): Water main was installed on Lower Sacramento Road and
Harney Lane in lengths of 326 feet and 380 feet, respectively. Half of the cost or 163 feet and 190 feet and
half of the cost of the inline 10-inch valve is allocated to this site for a cost of $26,641.
Lodi Electric Utility Conduit Crossing: One crossing of Lower Sacramento Road [2-inch (2), 4-inch (1),
6-inch (2)] and one crossing of Harney Lane [2-inch (2), 4-inch (1), 6-inch (1)] were installed. Half of the
cost of each is allocated to this site for a cost of $7,312.
With ten percent added for Engineering and Administration, the total reimbursable cost is $37,348.
K:\WP\DEV SERV\CCSetPHAreaofBenefitLwrSac ExB.doc 6
City of Lodi Lower Sacramento Road (Kettleman Lane to Harney Lane) EXHIBIT C
Public Works Dept
Reimbursable Costs
ITEM
No.
DESCRIPTION
UNIT QUANTITY
BDC Lodi III
Site No. 1 058-030-13
Van Ruiten
Site No. 3 058-030-04
Van Ruiten
Site No. 2 058-030-03
Van Ruiten
Site No. 4 058-030-05
Howard Investments
Site No. 5 058-030-06
Schumacher
Site No. 6 058-040-01
Unit Price Quantity Total Quantity Total Quantity
Total Quantity Total Quantity Total Quantity Total
LOWER SAC ROAD CONSTRUCTION PROJECT
1
8 -INCH SANITARY SEWER PIPE
LF
146
$ 185.00
92
17,020.00
0.00
0.00
0.00
0.00
0.00
2
21 -INCH SANITARY SEWER PIPE
LF
38
$ 235.00
0.00
0.00
38
8,930.00
0.00
0.00
0.00
3
42 -INCH SANITARY SEWER PIPE
LF
218
$ 390.001
0.001
0.00
218
85,020.00
0.00
0.001
0.00
4
18 -INCH STORM DRAIN PIPE
LF
51
$ 125.001
0.00
0.00
0.00
0.00
0.00
0.00
5
48 -INCH STORM DRAIN PIPE
LF
242
$ 205.00
0.00
0.00
242
49,610.00
0.00
0.00
0.00
6
30 -INCH INDUSTRIAL WASTE PIPE
LF
27
$ 155.00
0.00
0.00
27
4,185.00
0.00
0.00
0.00
7
PIPE MARKERS
EA
23
$ 200.00
0.00
0.00
1 0.00
1 0.00
0.00
0.00
8
SIDE INLET CATCH BASIN
EA
17
$ 950.00
0.00
0.00
0.00
0.00
0.00
0.00
9
STORM DRAIN MANHOLE
EA
14
$ 3,650.00
0.00
0.00
0.00
0.00
0.00
0.00
10
SANITARY SEWER MANHOLE
EA
3
$ 3,100.00
0.5
1,550.00
0.00
2
6,200.00
0.00
0.00
0.00
11
INDUSTRIAL WASTE MANHOLE
EA
1
$ 3,625.00
0.00
0.00
0.00
0.00
0.00
0.00
12
10 -INCH WATER PIPE
LF
2,910
$ 49.00
439
21,511.00
90
4,410.00
451
22,099.00
404 19,796.00
0.001
68
3,332.00
13
8 -INCH WATER PIPE
LF 1
110
$ 35.00
0.00
0.00
0.00
0.00
0.00
0.00
14
6 -INCH WATER PIPE
LF
190
$ 26.00
0.00
0.00
0.00
70 1,820.00
0.00
0.00
15
2 -INCH WATER PIPE
EA
3
$ 2,625.00
0.00
0.00
0.00
0.00
0.00
0.00
16
TEMPORARY BLOW -OFF
EA
14
$ 1,150.00
0.00
0.00
0.00
0.00
0.00
0.00
17
WATER VALVE 10 -INCH
EA
16
$ 2,215.00
2
4,430.00
0.00
21
4,430.00
11 2,215.00
0.00
1
2,215.00
18
WATER VALVE 8 -INCH
EA
5
$ 1,925.00
0.00
0.00
0.00
0.00
0.00
0.00
19
WATER VALVE 6 -INCH
EA
2
$ 1,225.00
0.00
0.00
0.00
1 1,225.00
0.00
0.00
20
FIRE HYDRANT ASSEMBLY
EA
2
$ 3,050.00
0.00
0.00
0.00
0.00
0.00
0.00
21
CONDUIT 2 -INCH CROSSINGS
LF
1,610
$ 23.00
51
1,173.00
146
3,358.00
132
3,036.00
0.00
0.00
107
2,461.00
22
CONDUIT 4 -INCH CROSSINGS
LF
912
$ 16.001
51
816.001
97
1,552.00
132
2,112.00
0.00
0.00
531
848.00
23
ICONDUIT 6 -INCH CROSSINGS
LF
572
$ 17.001
152
2,584.00
0.00
132
2,244.00
0.00
0.00
0.00
24
TRAFFIC SIGNAL SYSTEM -CENTURY BLVD
LS
1
$ 153,300.00
0.00
0.00
0.25
38,325.00
0.00
0.00
0.25
38,325.00
25
SIGNAL MODIFICATIONS AT KETTLEMAN/LOWER SAC
LS
1
$ 12,000.00
0.00
0.00
0.00
0.00
0.00
0.00
26
ADD CONDUIT CROSSINGS PER EUD REQUEST
LS
1
$ 20,278.20
0.00
0.00
0.00
0.00
0.00
0.00
CONDUIT 2" CROSSING
LF
336
$ 9.50
100
950.00
0.00
86
817.001
0.00
0.00
0.00
CONDUIT 4" CROSSING
LF
442
$ 14.40
100
1,440.00
0.00
172
2,476.80
0.00
0.00
0.00
CONDUIT 6" CROSSING
LF
622
$ 17.70
0.00
0.00
172
3,044.40
0.00
0.00
0.00
27
DESIGN CHANGES FUTURE TS S/KETTLEMAN
LS
1
$ 55,000.00
0.33
18,150.00
0.00
0.00
0.00
0.00
0.00
MTCO AMENDMENT#3 1/3 COST X55,000
0.00
0.00
0.00
0.00
0.00
0.00
AM STEPHENS K -RAIL RENTAL
LS
$1,500.00
1
1,500.001
0.00
0.00
0.00
0.001
0.00
GEORGE REED INSTALL DELINEATORS
LS
$ 3,192.38
1
3,192.38
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
HARNEY CURVE PROJECT
0.00
0.00
0.00
0.00
0.00
0.00
1
10" WATER PIPE
LF
1,160
$ 72.00
0.00
0.00
0.00
0.00
0.00
0.00
2
10" WATER VALVE
EA
5
$ 2,450.00
0.00
0.00
0.00
0.00
0.00
0.00
3
4" BLOW OFF
EA
2
$ 2,100.00
0.00
0.00
0.00
0.00
0.00
0.00
4
EUD CONDUIT CROSSINGS LSR HARNEY
0.00
0.00
0.00
0.00
0.00
0.00
WEST CROSSING HARNEY 70 LF 1/4 COST
LS
1
$ 4,875.00
0.00
0.00
0.00
0.00
0.00
0.00
EAST CROSSING HARNEY 70 LF 1/4 COST
LS
1
$ 4,875.00
0.00
0.00
0.00
0.00
0.00
0.00
NORTH CROSSING LSR 120 LF 1/2 COST
LS
1
$ 9,749.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
CENTURY BLVD CONSTRUCTION PROJECT
0.00
0.00
0.00
0.00
0.00
0.00
1
48" STORM DRAIN PIPE
LF
847
$ 205.00
0.00
0.001
423.5
86,817.50
0.001
0.00
423.5
86,817.50
TOTAL CONSTRUCTION COSTS
$
74,316.38
$
9,320.00
$ 319,346.70
$ 25,056.00
$
$
133,998.50
10% ENGINEERING & ADMINISTRATION!$
7,431.64
$
932.001
$ 31,934.67 1
1 $ 2,505.601
1 $
$
13,399.85
TOTAL REIMBURSABLE COSTS 1
1
$
81,748.02
$
10,252.001
$ 351,281.37 1
1 $ 27,561.601
1 $
$
147,398.35
K:\WP\DEV_SERV\ccSetPHAreaofBenefitLwrSac_ReimbursableCosts.zlsTotal Project 1 2/15/2007
City of Lodi Lower Sacramento Road (Kettleman Lane to Harney Lane) EXHIBIT C
Public Works Dept
Reimbursable Costs
ITEM
No.
DESCRIPTION
UNIT QUANTITY
Schumacher
Site No. 7 058-040-02
Schumacher
Site No. 8 058-040-04
Schumacher
Site No. 9 058-040-05
Schumacher
Site No. 28 058-230-10
Kubota
058-230-04
Peterson
Site No. 23 058-140-52
Unit Price Quantity Total Quantity Total Quantity
Total Quantity Total
Quantity Total
Quantity Total
LOWER SAC ROAD CONSTRUCTION PROJECT
PAID
1
8 -INCH SANITARY SEWER PIPE
LF
146
$ 185.00
0.00
0.00
0.00
0.00
$
0.00
2
21 -INCH SANITARY SEWER PIPE
LF
38
$ 235.00
0.00
0.00
0.00
0.00
$
0.00
3
42 -INCH SANITARY SEWER PIPE
LF
218
$ 390.001
0.001
0.00
0.00
0.00
$
0.00
4
18 -INCH STORM DRAIN PIPE
LF
51
$ 125.001
0.00
0.00
0.00
0.00
$
0.00
5
48 -INCH STORM DRAIN PIPE
LF
242
$ 205.00
0.00
0.00
0.00
0.00
$
0.00
6
30 -INCH INDUSTRIAL WASTE PIPE
LF
27
$ 155.00
0.00
0.00
0.00
0.00
$
0.00
7
PIPE MARKERS
EA
23
$ 200.00
0.00
0.001
0.00
1
0.00
1 $
0.00
8
SIDE INLET CATCH BASIN
EA
17
$ 950.00
0.00
0.00
0.00
0.00
$
0.00
9
STORM DRAIN MANHOLE
EA
14
$ 3,650.00
0.00
0.00
0.00
0.00
$
0.00
10
SANITARY SEWER MANHOLE
EA
3
$ 3,100.00
0.00
0.00
0.00
0.00
$
0.00
11
INDUSTRIAL WASTE MANHOLE
EA
1
$ 3,625.00
0.00
0.00
0.00
0.00
$
0.00
12
10 -INCH WATER PIPE
LF
2,910
$ 49.00
72
3,528.00
158
7,742.00
84
4,116.00
0.00
$
333
16,317.00
13
8 -INCH WATER PIPE
LF
110
$ 35.00
0.001
62
2,170.00
0.00
0.00
$
0.00
14
6 -INCH WATER PIPE
LF
190
$ 26.00
0.00
0.00
0.00
0.00
$
0.00
15
2 -INCH WATER PIPE
EA 1
3
$ 2,625.00
0.00
0.00
0.00
0.00
$
0.00
16
TEMPORARY BLOW -OFF
EA
14
$ 1,150.00
0.00
0.00
0.00
0.00
$
0.00
17
WATER VALVE 10 -INCH
EA
16
$ 2,215.00
1
2,215.00
0.5
1,107.50
0.5
1,107.50
0.00
1 $
0.00
18
WATER VALVE 8 -INCH
EA
5
$ 1,925.00
0.00
1
1,925.00
0.00
0.00
$
0.00
19
WATER VALVE 6 -INCH
EA
2
$ 1,225.00
0.00
0.00
0.00
0.00
$
0.00
20
FIRE HYDRANT ASSEMBLY
EA
2
$ 3,050.00
0.00
0.00
0.00
0.00
$
0.00
21
CONDUIT 2 -INCH CROSSINGS
LF
1,610
$ 23.00
124
2,852.00
119
2,737.00
0.00
0.00
$
0.00
22
CONDUIT 4 -INCH CROSSINGS
LF
912
$ 16.00
62
992.00
60
960.00
0.00
0.00
$
0.00
23
CONDUIT 6 -INCH CROSSINGS
LF
572
$ 17.00
0.001
0.00
0.00
0.00
$
0.00
24
TRAFFIC SIGNAL SYSTEM -CENTURY BLVD
LS
1
$ 153,300.00
0.00
0.00
0.00
0.00
$
0.25
38,325.00
25
ISIGNAL MODIFICATIONS AT KETTLEMAN/LOWER SAC
LS
1
$ 12,000.00
0.00
1
0.00
1 0.00
1
0.00
$
0.00
26
ADD CONDUIT CROSSINGS PER EUD REQUEST
LS
1
$ 20,278.20
0.00
0.00
0.00
0.00
$
0.00
CONDUIT 2" CROSSING
LF
336
$ 9.50
0.00
0.00
0.00
0.00
1 $
150
1,425.00
CONDUIT 4" CROSSING
LF
442
$ 14.40
0.00
0.00
0.00
0.00
$
150
2,160.00
CONDUIT 6" CROSSING
LF
622
$ 17.70
0.00
0.00
0.00
0.00
$
450
7,965.00
27
DESIGN CHANGES FUTURE TS S/KETTLEMAN
LS
1
$ 55,000.00
0.00
0.00
0.00
0.00
$
0.00
MTCO AMENDMENT#3 1/3 COST X55,000
0.00
0.00
0.00
0.00
$
0.00
AM STEPHENS K -RAIL RENTAL
LS
$1,500.00
0.00
0.00
0.00
0.00
0.00
GEORGE REED INSTALL DELINEATORS
LS
$ 3,192.381
0.00
0.001
0.00
0.00
0.00
0.00
0.00
0.00
0.00
$
0.00
HARNEY CURVE PROJECT
0.00
0.00
0.00
1
0.00
$
0.00
1
10" WATER PIPE
LF
1,160
$ 72.00
0.00
0.00
196
14,112.00
353
25,416.00
$
0.00
2
10" WATER VALVE
EA
5
$ 2,450.00
0.00
0.00
0.5
1,225.00
0.5
1,225.00
1 $
0.00
3
4" BLOW OFF
EA
2
$ 2,100.00
0.00
0.00
0.00
0.00
$
0.00
4
EUD CONDUIT CROSSINGS LSR HARNEY
0.00
0.00
0.00
0.00
$
0.00
WEST CROSSING HARNEY 70 LF 1/4 COST
LS
1
$ 4,875.00
0.00
0.00
0.5
2,437.50
0.5
2,437.50
$
0.00
EAST CROSSING HARNEY 70 LF 1/4 COST
LS
1
$ 4,875.00
0.00
0.00
0.00
0.00
$
0.00
NORTH CROSSING (LSR) 120 LF 1/2 COST
LS
1
$ 9,749.00
0.00
0.00
0.5
4,874.50
0.5
4,874.50
$
0.00
0.00
1
0.001
0.00
0.00
$
0.00
CENTURY BLVD CONSTRUCTION PROJECT
0.00
0.00
0.001
1
0.00
$
0.00
1
48" STORM DRAIN PIPE
LF
847
$ 205.00
0.00
0.00
0.00
0.00
$
0.00
TOTAL CONSTRUCTION COSTS
$
9,587.00
$
16,641.50
$ 27,872.50
$
33,953.00
$
$
66,192.00
10%ENGINEERING&ADMINISTRATION
$
958.70
$
1,664.15
$ 2,787.25
$
3,395.30
$
6,619.20
TOTAL REIMBURSABLE COSTS I
$
10,545.70
$
18,305.65 1
$ 30,659.75 1
$
72,811.20
K:\WP\DEV_SERV\ccSetPHAreaofBenefitLwrSac_ReimbursableCosts.zlsTotal Project 2 2/15/2007
City of Lodi Lower Sacramento Road (Kettleman Lane to Harney Lane) EXHIBIT C
Public Works Dept
Reimbursable Costs
ITEM
No.
DESCRIPTION
UNIT QUANTITY
Peterson
Site No. 21 058-140-12
Peterson
Site No. 22 058-140-14
Herman
Site No. 15 058-140-06
Amigable
Site No. 19 058-140-10
Frame
Site No. 13 058-140-04
Ramazan
Site No. 14 058-140-05
Unit Price Quantity Total Quantity Total Quantity Total Quantity Total Quantity Total
Quantity Total
LOWER SAC ROAD CONSTRUCTION PROJECT
14.68%
5.87%
16.80%
23.98%
1
8 -INCH SANITARY SEWER PIPE
LF
146
$ 185.00
0.00
0.00
0.00
0.00
0.00
0.00
2
21 -INCH SANITARY SEWER PIPE
LF
38
$ 235.00
0.00
0.00
0.00
0.00
0.00
0.00
3
42 -INCH SANITARY SEWER PIPE
LF
218
$ 390.001
0.001
0.001
0.00
0.00
0.00
0.00
4
18 -INCH STORM DRAIN PIPE
LF
51
$ 125.001
0.00
0.00
0.00
0.00
0.00
0.00
5
48 -INCH STORM DRAIN PIPE
LF
242
$ 205.00
0.00
0.00
0.00
0.00
0.00
0.00
6
30 -INCH INDUSTRIAL WASTE PIPE
LF
27
$ 155.00
0.00
0.00
0.00
0.00
0.00
0.00
7
PIPE MARKERS
EA
23
$ 200.00
0.00
0.00
0.00
1 0.00
0.00
0.00
8
SIDE INLET CATCH BASIN
EA
17
$ 950.00
0.00
0.00
0.00
0.00
0.00
0.00
9
STORM DRAIN MANHOLE
EA
14
$ 3,650.00
0.00
0.00
0.00
0.00
0.00
0.00
10
SANITARY SEWER MANHOLE
EA
3
$ 3,100.00
0.00
0.00
0.00
0.00
0.00
0.00
11
INDUSTRIAL WASTE MANHOLE
EA
1
$ 3,625.00
0.00
0.00
0.00
0.00
0.00
0.00
12
10 -INCH WATER PIPE
LF
2,910
$ 49.00
346
16,954.00
42
2,058.00
0.00
0.00
0.00
0.00
13
8 -INCH WATER PIPE
LF
110
$ 35.00 1
0.001
0.001
0.00
0.00
0.00
0.00
14
6 -INCH WATER PIPE
LF
190
$ 26.00
16
416.00
0.00
0.00
0.00
0.00
0.00
15
2 -INCH WATER PIPE
EA 1
3
$ 2,625.00
0.00
0.00
0.00
0.00
0.00
0.00
16
TEMPORARY BLOW -OFF
EA
14
$ 1,150.00
0.00
0.00
0.00
0.00
0.00
0.00
17
WATER VALVE 10 -INCH
EA
16
$ 2,215.00
1
2,215.00
0.00
0.00
0.00
0.00
0.00
18
WATER VALVE 8 -INCH
EA
5
$ 1,925.00
0.00
0.00
0.00
0.00
1 0.00
0.00
19
WATER VALVE 6 -INCH
EA
2
$ 1,225.00
1
1,225.00
0.00
0.00
0.00
0.00
1 0.00
20
FIRE HYDRANT ASSEMBLY
EA
2
$ 3,050.00
0.00
0.00
0.00
0.00
0.00
0.00
21
CONDUIT 2 -INCH CROSSINGS
LF
1,610
$ 23.00
146
3,358.00
51
1,173.00
0.00
0.00
0.00
0.00
22
CONDUIT 4 -INCH CROSSINGS
LF
912
$ 16.00
97
1,552.00
51
816.00
0.00
0.00
0.00
0.00
23
CONDUIT 6 -INCH CROSSINGS
LF
572
$ 17.001
0.001
152
2,584.00
0.00
0.00
0.00
0.00
24
TRAFFIC SIGNAL SYSTEM -CENTURY BLVD
LS
1
$ 153,300.00
0.00
0.00
0.00
0.00
0.00
0.00
25
ISIGNAL MODIFICATIONS AT KETTLEMAN/LOWER SAC
LS
1
$ 12,000.00
0.00
0.00
0.00
0.00
0.00
0.00
26
ADD CONDUIT CROSSINGS PER EUD REQUEST
LS
1
$ 20,278.20
0.00
0.00
0.00
0.00
0.00
0.00
CONDUIT 2" CROSSING
LF
336
$ 9.50
0.00
0.00
0.00
0.00
0.00
0.00
CONDUIT 4" CROSSING
LF
442
$ 14.40
0.00
0.00
0.00
0.00
1 0.00
0.00
CONDUIT 6" CROSSING
LF
622
$ 17.70
0.00
0.00
0.00
1 0.00
0.00
0.00
27
DESIGN CHANGES FUTURE TS S/KETTLEMAN
LS
1
$ 55,000.00
0.00
0.00
0.00
0.00
0.00
0.00
MTCO AMENDMENT#3 1/3 COST X55,000
0.00
0.00
0.00
0.00
0.00
0.00
AM STEPHENS K -RAIL RENTAL
LS
$1,500.00
0.00
0.00
0.00
0.00
0.00
0.00
GEORGE REED INSTALL DELINEATORS
LS
$ 3,192.381
0.001
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
HARNEY CURVE PROJECT
0.00
0.00
0.00
0.00
0.00
0.00
1
10" WATER PIPE
LF
1,160
$ 72.00
0.00
0.00
0.00
0.00
0.00
0.00
2
10" WATER VALVE
EA
5
$ 2,450.00
0.00
0.00
0.00
0.00
0.00
0.00
3
4" BLOW OFF
EA
2
$ 2,100.00
0.00
0.00
0.00
0.00
1 0.00
0.00
4
EUD CONDUIT CROSSINGS LSR HARNEY
0.00
0.00
0.00
1 0.00
0.00
0.00
WEST CROSSING HARNEY 70 LF 1/4 COST
LS
1
$ 4,875.00
0.00
0.00
0.00
0.00
0.00
0.00
EAST CROSSING HARNEY 70 LF 1/4 COST
LS
1
$ 4,875.00
0.00
0.00
0.00
0.00
0.00
0.00
NORTH CROSSING (LSR) 120 LF 1/2 COST
LS
1
$ 9,749.00
0.00
0.00
0.00
0.00
0.00
0.00
0.001
0.00
0.00
0.00
0.00
0.00
CENTURY BLVD CONSTRUCTION PROJECT
I I
1
0.001
0.00
0.00
0.00
0.00
0.00
1
48" STORM IN PIPE
LF
847
$ 205.001
1
0.001
0.00
0.00
0.00
0.00
0.00
TOTAL CONSTRUCTION COSTS
$
25 101
6,631.00
$ 5,936.77
$ 2,374.71
$ 6,794.30
$ 9,696.72
10%ENGINEERING&ADMINISTRATION
$
2,572.00
$
663.70
$ 593.68
$ 237.47
$ 679.43
$ 969.67
TOTAL REIMBURSABLE COSTS
$
28,292.00
$
7,294.10
$ 6,530.45
$ 2,612.18
$ 7,473.73
$ 10,666.40
K:\WP\DEV_SERV\ccSetPHAreaofBenefitLwrSac_ReimbursableCosts.zlsTotal Project 3 2/15/2007
City of Lodi Lower Sacramento Road (Kettleman Lane to Harney Lane) EXHIBIT C
Public Works Dept
Reimbursable Costs
ITEM
No.
DESCRIPTION
UNIT QUANTITY
Del Rio
Site No. 16 058-140-07
Hall
Site No. 17 058-140-08
Del Rio
Site No. 18 058-140-09
Zane
Site No. 20 058-140-11
Galindo
Site No. 24 058-230-06
Stice
Site No. 25 058-230-07
Unit Price Quantity Total Quantity Total Quantity Total Quantity Total Quantity Total
Quantity Total
LOWER SAC ROAD CONSTRUCTION PROJECT
11.75%
11.42%
5.87%
9.62%
1
8 -INCH SANITARY SEWER PIPE
LF
146
$ 185.00
0.00
0.00
0.00
0.00
0.00
0.00
2
21 -INCH SANITARY SEWER PIPE
LF
38
$ 235.00
0.00
0.00
0.00
0.00
0.00
0.00
3
42 -INCH SANITARY SEWER PIPE
LF
218
$ 390.001
0.001
0.00
0.00
0.00
0.00
0.00
4
18 -INCH STORM DRAIN PIPE
LF
51
$ 125.001
0.00
0.00
0.00
0.00
0.00
0.00
5
48 -INCH STORM DRAIN PIPE
LF
242
$ 205.00
0.00
0.00
0.00
0.00
0.00
0.00
6
30 -INCH INDUSTRIAL WASTE PIPE
LF
27
$ 155.00
0.00
0.00
0.00
0.00
0.00
0.00
7
PIPE MARKERS
EA
23
$ 200.00
0.00
0.001
0.00
1 0.00
1 0.00
1 0.00
8
SIDE INLET CATCH BASIN
EA
17
$ 950.00
0.00
0.00
0.00
0.00
0.00
0.00
9
STORM DRAIN MANHOLE
EA
14
$ 3,650.00
0.00
0.00
0.00
0.00
0.00
0.00
10
SANITARY SEWER MANHOLE
EA
3
$ 3,100.00
0.00
0.00
0.00
0.00
0.00
0.00
11
INDUSTRIAL WASTE MANHOLE
EA
1
$ 3,625.00
0.00
0.00
0.00
0.00
0.00
0.00
12
10 -INCH WATER PIPE
LF
2,910
$ 49.00
0.00
0.00
0.00
0.00
0.00
0.00
13
8 -INCH WATER PIPE
LF
110
$ 35.00
0.001
0.00
0.00
0.00
0.00
0.00
14
6 -INCH WATER PIPE
LF
190
$ 26.00
0.00
0.00
0.00
0.00
0.00
0.00
15
2 -INCH WATER PIPE
EA 1
3
$ 2,625.00
0.00
0.00
0.00
0.00
0.00
0.00
16
TEMPORARY BLOW -OFF
EA
14
$ 1,150.00
0.00
0.00
0.00
0.00
0.00
0.00
17
WATER VALVE 10 -INCH
EA
16
$ 2,215.00
0.00
0.00
0.00
0.00
1 0.00
1 0.00
18
WATER VALVE 8 -INCH
EA
5
$ 1,925.00
0.00
0.00
0.00
0.00
0.00
0.00
19
WATER VALVE 6 -INCH
EA
2
$ 1,225.00
0.00
0.00
0.00
0.00
0.00
0.00
20
FIRE HYDRANT ASSEMBLY
EA
2
$ 3,050.00
0.00
0.00
0.00
0.00
0.00
0.00
21
CONDUIT 2 -INCH CROSSINGS
LF
1,610
$ 23.00
0.00
0.00
0.00
0.00
0.00
0.00
22
CONDUIT 4 -INCH CROSSINGS
LF
912
$ 16.00
0.00
0.00
0.00
0.00
0.00
0.00
23
CONDUIT 6 -INCH CROSSINGS
LF
572
$ 17.00
0.001
0.00
0.00
0.00
0.00
0.00
24
TRAFFIC SIGNAL SYSTEM -CENTURY BLVD
LS
1
$ 153,300.00 1
0.00
0.00
0.00
0.00
0.00
0.00
25
ISIGNAL MODIFICATIONS AT KETTLEMAN/LOWER SAC
LS
1
$ 12,000.00
0.00
0.00
0.001
0.00
0.00
0.00
26
ADD CONDUIT CROSSINGS PER EUD REQUEST
LS
1
$ 20,278.20
0.00
0.00
0.00
0.00
0.00
0.00
CONDUIT 2" CROSSING
LF
336
$ 9.50
0.00
0.00
0.00
0.001
0.00
1 0.00
CONDUIT 4" CROSSING
LF
442
$ 14.40
0.00
0.00
0.00
0.00
0.00
0.00
CONDUIT 6" CROSSING
LF
622
$ 17.70
0.00
0.00
0.00
0.00
0.00
0.00
27
DESIGN CHANGES FUTURE TS S/KETTLEMAN
LS
1
$ 55,000.00
0.00
0.00
0.00
0.00
0.00
0.00
MTCO AMENDMENT#3 1/3 COST X55,000
0.00
0.00
0.00
0.00
0.00
0.00
AM STEPHENS K -RAIL RENTAL
LS
$1,500.00
0.00
0.00
0.00
0.00
0.00
0.00
GEORGE REED INSTALL DELINEATORS
LS
$ 3,192.381
0.001
0.00
1 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
HARNEY CURVE PROJECT
0.00
0.00
0.00
0.00
0.00
0.00
1
10" WATER PIPE
LF
1,160
$ 72.00
0.00
0.00
0.00
1 0.00
33 2,376.00
33 2,376.00
2
10" WATER VALVE
EA
5
$ 2,450.00
0.00
0.00
0.00
0.001
0.00
1 0.00
3
4" BLOW OFF
EA
2
$ 2,100.00
0.00
0.00
0.00
0.00
0.00
0.00
4
EUD CONDUIT CROSSINGS LSR HARNEY
0.00
0.00
0.00
0.00
0.00
0.00
WEST CROSSING HARNEY 70 LF 1/4 COST
LS
1
$ 4,875.00
0.00
0.00
0.00
0.00
0.00
0.00
EAST CROSSING HARNEY 70 LF 1/4 COST
LS
1
$ 4,875.00
0.00
0.00
0.00
0.00
0.00
0.00
NORTH CROSSING (LSR) 120 LF 1/2 COST
LS
1
$ 9,749.00
0.00
0.00
0.00
0.00
0.00
0.00
0.001
1 0.00
0.00
0.000.00
0.00
CENTURY BLVD CONSTRUCTION PROJECT
I I
1 0.001
1 0.001
1 0.00
0.00
0.00
0.00
1
48" STORM IN PIPE
LF
847
$ 205.001
1 0.001
1 0.001
1 0.001
0.00
0.00
0.00
TOTAL CONSTRUCTION COSTS
$ 4,749.42
$ 4,617.49
$ 2,374.71 1
$ 3,891.881
$ 2,376.00
$ 2,376.00
10% ENGINEERING & ADMINISTRATION1$
474.941
1 $ 461.751
1 $ 237.471
1 $ 389.19
$ 237.60
$ 237.60
TOTAL REIMBURSABLE COSTS
$ 5,224.36
$ 5,079.24
$ 2,612.18
$ 4,281.07
$ 2,613.60
$ 2,613.60
K:\WP\DEV_SERV\ccSetPHAreaofBenefitLwrSac_ReimbursableCosts.zlsTotal Project 4 2/15/2007
City of Lodi Lower Sacramento Road (Kettleman Lane to Harney Lane) EXHIBIT C
Public Works Dept
Reimbursable Costs
ITEM
No.
DESCRIPTION
UNIT QUANTITY
Southwest Gateway Group
Sanchez
Site No. 26 058-230-08
Sandoval
Site No. 27 058-230-09
Woods
Site No. 12 058-070-09
Bell
Site No. 11 058-070-08
Hayn
Site No. 10 058-070-07
Unit Price Quantity Total Quantity Total Quantity Total Quantity Total
Quantity Total
Peterson Group
LOWER SAC ROAD CONSTRUCTION PROJECT
0.72
11.75%
Olive Drive Group
Site 17
0.7
11.42%
Harney Group
Site 18
1
8 -INCH SANITARY SEWER PIPE
LF
146
$ 185.00
0.00
0.00
0.00
0.00
0.00
2
21 -INCH SANITARY SEWER PIPE
LF
38
$ 235.00
0.00
0.00
0.00
0.00
0.00
3
42 -INCH SANITARY SEWER PIPE
LF
218
$ 390.001
0.001
0.001
0.00
0.00
0.00
4
18 -INCH STORM DRAIN PIPE
LF
51
$ 125.00
0.00
0.00
0.00
0.00
0.00
5
48 -INCH STORM DRAIN PIPE
LF
242
$ 205.00
0.00
0.00
0.00
0.00
0.00
6
30 -INCH INDUSTRIAL WASTE PIPE
LF
27
$ 155.00
0.00
0.00
0.00
0.00
0.00
7
PIPE MARKERS
EA
23
$ 200.00
0.00
0.00
0.00
0.00
1 0.00
8
SIDE INLET CATCH BASIN
EA
17
$ 950.00
0.00
0.00
0.001
0.00
0.00
9
STORM DRAIN MANHOLE
EA
14
$ 3,650.00
0.00
0.00
0.00
0.00
0.00
10
SANITARY SEWER MANHOLE
EA
3
$ 3,100.00
0.00
0.00
0.00
0.00
0.00
11
INDUSTRIAL WASTE MANHOLE
EA
1
$ 3,625.00
0.00
0.00
0.00
0.00
0.00
12
10 -INCH WATER PIPE
LF
2,910
$ 49.00
0.00
0.00
0.00
0.00
0.00
13
8 -INCH WATER PIPE
LF
110
$ 35.00
0.00
0.001
0.00
0.00
0.00
14
6 -INCH WATER PIPE
LF
190
$ 26.00
0.00
0.00
0.00
0.00
0.00
15
2 -INCH WATER PIPE
EA
3
$ 2,625.00
0.00
0.00
0.00
0.00
0.00
16
TEMPORARY BLOW -OFF
EA
14
$ 1,150.00
0.00
0.00
0.00
0.00
0.00
17
WATER VALVE 10 -INCH
EA
16
$ 2,215.00
0.00
0.00
0.00
1 0.00
0.00
18
WATER VALVE 8 -INCH
EA
5
$ 1,925.00
0.00
0.00
0.00
0.00
0.00
19
WATER VALVE 6 -INCH
EA
2
$ 1,225.00
0.00
0.00
0.00
0.00
0.00
20
FIRE HYDRANT ASSEMBLY
EA
2
$ 3,050.00
0.00
0.00
0.00
0.00
0.00
21
CONDUIT 2 -INCH CROSSINGS
LF
1,610
$ 23.00
0.00
0.00
0.00
0.00
0.00
22
ICONDUIT 4 -INCH CROSSINGS
LF
912
$ 16.00
0.00
0.00
0.00
0.00
0.00
23
CONDUIT 6 -INCH CROSSINGS
LF
572
$ 17.00
0.00
0.00
0.00
0.00
0.00
24
TRAFFIC SIGNAL SYSTEM -CENTURY BLVD
LS
1
$ 153,300.00
0.00
0.00
0.00
0.00
0.00
25
SIGNAL MODIFICATIONS AT KETTLEMAN/LOWER SAC
LS
1
$ 12,000.00
0.00
0.00
0.00
0.00
0.00
26
ADD CONDUIT CROSSINGS PER EUD REQUEST
LS
1
$ 20,278.20
0.00
0.00
0.00
0.00
0.00
CONDUIT 2" CROSSING
LF
336
$ 9.50
0.00
0.00
0.001
0.00
0.00
CONDUIT 4" CROSSING
LF
442
$ 14.40
0.00
0.00
0.00
0.00
0.00
CONDUIT 6" CROSSING
LF
622
$ 17.70
0.00
0.00
0.00
0.00
0.00
27
DESIGN CHANGES FUTURE TS S/KETTLEMAN
LS
1
$ 55,000.001
0.00
0.00
0.00
0.00
0.00
MTCO AMENDMENT#3 1/3 COST X55,000
0.001
0.001
0.00
0.00
1 0.00
AM STEPHENS K -RAIL RENTAL
LS
$1,500.00
0.00
0.00
0.00
0.00
0.00
GEORGE REED INSTALL DELINEATORS
LS
$ 3,192.38
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
HARNEY CURVE PROJECT
0.00
0.00
0.00
0.00
0.00
1
10" WATER PIPE
LF
1,160
$ 72.00
33 2,376.00
33 2,376.00
103 7,416.00
103 7,416.00
103 7,416.00
2
10" WATER VALVE
EA
5
$ 2,450.00
0.00
0.00
0.001
0.00
0.00
3
4" BLOW OFF
EA
2
$ 2,100.00
0.00
0.00
0.00
0.00
0.00
4
EUD CONDUIT CROSSINGS LSR HARNEY
0.00
0.00
0.00
0.00
0.00
WEST CROSSING HARNEY 70 LF 1/4 COST
LS
1
$ 4,875.001
0.001
0.00
0.00
0.00
0.00
EAST CROSSING HARNEY 70 LF 1/4 COST
LS
1
$ 4,875.00
0.00
0.001
0.00
0.00
0.00
NORTH CROSSING (LSR) 120 LF 1/2 COST
LS
1
$ 9,749.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.001
1 0.00
CENTURY BLVD CONSTRUCTION PROJECT
0.00
0.00
0.00
0.001
0.00
1
48" STORM DRAIN PIPE
LF
847
$ 205.00
0.00
0.00
0.00
1 0.00
0.00
TOTAL CONSTRUCTION COSTS
$ 2,376.00
$ 2,376.00
$ 7,416.00
$ 7,416.00
$ 7,416.00
10% ENGINEERING & ADMINISTRATION1$
237.60
$ 237.60$
741.60
$ 741.60
$ 741.60
TOTAL REIMBURSABLE COSTS
$ 2,613.60
$ 2,613.60
$ 8,157.60
$ 8,157.60
$ 8,157.60
Site 13
1.03
16.80%
Southwest Gateway Group
Site 14
1.47
23.98%
Lodi Shopping Center
Site 15
0.9
14.68%
Peterson Group
Site 16
0.72
11.75%
Olive Drive Group
Site 17
0.7
11.42%
Harney Group
Site 18
0.36
5.87%
0.00
Site 19
0.36
5.87%
0
Site 20
0.59
9.62%
0.5
Olive Drive Group
Sites 13 thru 20
Quantity Check Quantity Total
1
92
54
9,990.00
38
0.00
218
0.00
0
31
3,875.00
242
0.00
27
0.00
0
0.00
0
0.00
0
1
3,650.00
2.5
0.5
1,550.00
0
0.00
2487
389
19,061.00
62
11
385.00
86
0.00
0
0.00
0
0.00
9
0.00
1
1
1,925.00
2
0.00
0
0.00
876
0.00
603
0.00
436
0.00
0.75
0.00
0
0.00
0
0.00
336
0.00
422
0.00
622
0.00
0.33
0.00
0
0.00
1
0.00
1
0.00
0
0.00
0
0.00
990
0.00
1
0.00
0
0.00
0
0.00
1
0.00
0
0.00
1
0.00
0
0.00
0
0.00
847
0.00
$902,904.84
$ 596,004.42
$ 81,748.02
$ 108,397.30
$ 44,479.60
$ 72,275.50
$ 902,904.84
$ 40,436.00 $ 40,436.00
K:\WP\DEV_SERV\ccSetPHAreaofBenefitLwrSac_ReimbursableCosts.zlsTotal Project 5 2/15/2007
CITY COUNCIL
BOB JOHNSON, Mayor
JOANNE L. MOUkCE
Mayor Pro Tompore
LARRY D. HANSEN
SUSAN HITCHCOCK
PHIL KATZAKIAN
Property Owners
CITY OF LODI
PUBLIC WORKS DEPARTMENT
CITY HALL, 221 WEST PINE STREET
P.O. BOX 3006
LODI, CALIFORNIA 95241-1910
(209)333-6706
FAX (209) 333-6710
EMAIL pwdeptClodi.gov
http-X\www.lodi.gov
February 16, 2007
Madi-mg bis ba a+
BLAIR KING
City Manager
RANDIJOHL
City Clerk
D. STEVEN SCHWABAUER
City Attorney
RICHARD C. PRIMA, JR.
Public Works Director
SUBJECT: Set Public Hearing for April 4, 2007, to Consider Resolution Establishing
Area of Benefit and Reimbursable Costs for Lower Sacramento Road
(Kettleman Lane to Harney Lane) Improvements
Enclosed is a copy of background information on an item on the City Council agenda of
W,*dnesday, February 21, 2007. The meeting will be held at 7 p.m. in the
City Council Chamber, Carnegie Forum, 305 West Pine Street.
This item is on the convent calendar and is usually not discussed unless a
Council Member reque$ts discussion. The public is given an opportunity to address
items on the consent calendar at the appropriate time.
If you wish to write to the City Council, please address your letter to City Council,
City of Lodi, P. 0. Box 3006, Lodi, California, 95241-1910. Be sure to allow time for the
mail. Or, you may hand -deliver the letter to City Hall, 221 West Pine Street.
If you wish to address the Council at the Council Meeting, be sure to fill out a speaker's
card (available at the Carnegie Forum immediately prior to the start of the meeting) and
give it to the City Clerk. If you have any questions about communicating with the
Council, please contact Randi Johl, City Clerk, at (209) 333-6702.
If you have any questions about the item itself, please call Wally Sandelin,
City Engineer/Deputy Public Works Director, at (209) 333-6709.
Richard C. Prima, Jr.
4r . Pylic Works Director
R€Plpmf
Enclosure
cc City Clerk
NCCSETPHAREAOFBENEFITLWRSAC2.QOC
APN
OWNER
ADDRESS
CITYISTATEIZIP
SITUSNUM
05803013
BDC LODI III
100 SWAN WAY
OAKLAND CA 94621
1551 N
LLC
SUITE 206
LOWER
SACRAMENTO
RD
05803003
VAN RUITEN
463 W TURNER RD
LODI CA 95242
14509, 14499,
05803004
RANCH LTD
14433 N
05803005
LOWER
SACRAMENTO
RD
05803006
HOWARD
2026 ANGELICO CIR
STOCKTON CA 95207
14195 N
INVESTMENTS
LOWER
LLC ETAL
SACRAMENTO
RD
05804001
SCHUMACHER
1303 RIVERGATE
LODI CA 95240
14101, 13837,
05804002
WELDON &
DR
13537, 13589
05804004
BONNIE TR
N LOWER
05804005
SACRAMENTO
RD
05807007
HAYN, BRIAN S
810 E HARNEY LN
LODI CA 95242
810 E HARNEY
LN
05807008
BELL LYNDLE
814 E HARNEY LN
LODI CA 95242
814 E HARNEY
ATR
LN
05807009
WOODS MARY
880 E HARNEY LN
LODI CA 95242
880 E HARNEY
ETR
LN
05814004
FRAME DEAN
212 RUTLEDGE DR
LODI CA 95242
14752 N
K & SHARON L
LOWER
TR
SACRAMENTO
RD
05814005
ALI RAMZAN
1112 RIVERGATE
LODI CA 95240
865 E OLIVE
DR
ST
05814006
HERRMANN
1200 GLEN HURST;i
LODI CA 95240
800 E OLIVE
VERNET & C
AVE
TRS
05814007
DEL RIO
15315 N HOERL RD
LODI CA 95240
844 E OLIVE
SANTIAGO M &
AVE
RAMONA T
05814008
HALL FRANK
PO BOX 90
FRENCH CAMP CA
890 E OLIVE
95231
AVE
05814009
DEL RIO
865 E OLIVE AVE
LODI CA 95242
908 E OLIVE
SANTIAGO M &
AVE
RAMONA T
05814010
AMIGABLE
930 E OLIVE AVE
LODI CA 95240
930 E OLIVE
LETICIA F
AVE
ETAL
05814011
GREVER
1432 PARK ST
LODI CA 95242
777 E OLIVE
ZANEM&P
AVE
TRS
05814012
PETERSON M
P O BOX 473
LOCKEFORD CA 95237
14500, 14320
05814052
BILL
N LOWER
SACRAMENTO
RD
05814014
PETERSON
PO BOX 331
SUTTER CREEK CA
14620 N
RUTH SUSAN
95685
LOWER
SACRAMENTO
RD
05823006
GALINDO
871 E HARNEY LN
LODI CA 95242
871 E HARNEY
MARK L &
LN
ELEANOR R
05823007
STICE LARRY
893 E HARNEY LN
LODI CA 95242
893 E HARNEY
& GORETI
LN
05823008
SANCHEZ JOB
909 E HARNEY LN
LODI CA 95242
909 E HARNEY
& ELENA
LN
05823009
SANDOVAL
931 E HARNEY LN
LODI CA 95242
931 E HARNEY
LORENZO V &
LN
MARGARIT
05823010
SCHUMACHER
1303 RIVERGATE
LODI CA 95240
13520 N
WELDON &
DR
LOWER
BONNIE TR
SACRAMENTO
RD
WAL MART
MAIL STOP 0555
BENTONVILLE AR
REAL ESTATE
72716-0555
BUSINESS TR
TAMURA JOEY
788 W ARMSTRONG
LODI CA 95240
TR
RD
Please immediately confirm receipt
Of this fax by calling 333-6702
CITY OF LODI
P. O. BOX 3006
LODI, CALIFORNIA 95241-1910
ADVERTISING INSTRUCTIONS
SUBJECT: PUBLIC HEARING TO CONSIDER RESOLUTION ESTABLISHING
AREA OF BENEFIT AND REIMBURSABLE COSTS FOR LOWER
SACRAMENTO ROAD (KETTLEMAN LANE TO HARNEY LANE)
IMPROVEMENTS
PUBLISH DATE: SATURDAY, FEBRUARY 24, 2007
TEAR SHEETS WANTED: One (1) please
SEND AFFIDAVIT AND BILL TO: RANDI JOHL, CITY CLERK
City of Lodi
P.O. Box 3006
Lodi, CA 95241-1910
DATED: THURSDAY, FEBRUARY 22, 2007
ORDERED BY: RANDI JOHL
CITY CLERK
:-".A__
J N#FER PERRIN, CMC
D PUTY CITY CLERK
LNS
formsladvins.doc
DANA CHAPMAN
ADMINISTRATIVE CLERK
PUBLIC HEARiT TO CONSIDER RESOLUTION ESTABLISHING AREA OF
9�-AAZWIT AND RIPMOURSABLE COSTS FOR LOWER SACRAMENTO ROAD
(KIETTLIIMAN LANE TO HARNEY LANE) IMPROVEMENTS
On Friday, February 23, 2007, in the City of Lodi, San Joaquin County, California, a
copy of a Notice of Public Hearing to consider resolution establishing Area of Benefit
and Reimbursable Costs for Lower Sacramento Road (Kettleman Lane to Harney Lane)
improvements (attached hereto, marked Exhibit "A") was posted at the following four
locations:
Lodi Public Library
Lodi City Clerk's Office
Lodi City Hall Lobby
Lodi Camegle Forum
I declare under penalty of perjury that the foregoing is true and correct.
Executed on F=ebruary 23, 2007, at Lodi, California.
JIMAWER 4 PERRIN, CMC
LITY CITY CLERK
N:\Adniinistration\CLERK\Forms\DECPOST2.DOC
ORDERED BY:
RANDI JOHL
CITY CLERK
DANA CHAPMAN
ADMINISTRATIVE CLERK
i
PUBLIC ARING TO CONSIDER RESOLUTION ESTABLISHING
AREA OF BENEFITAND ROMOURSABLE COSTS FOR LOWER SACRAMENTO ROAD
(KETTLEIi11AN LANE TO HARNEY LANE) IMPROVEMENTS
On Thursday, February 22, 2007, in the City of Lodi, San Joaquin County, California, I
deposited in the United States mail, envelopes with first-class postage prepaid thereon,
containing Notice of Public Hearing to consider resolution establishing Area of Benefit and
Reimbursable Costs for Lower Sacramento Road (Kettleman Lane to Harney Lane)
improvements, attached hereto Marked Exhibit A. The mailing list for said matter is attached
hereto, marked Exhibit B.
There is a regular daily communication by mail between the City of Lodi, California, and the
places to which said envelopes were addressed.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on February 22, 2007, at Lodi, California.
auTY
PERRIN, CMC
CITY CLERK
PornWidecmail.doc
ORDERED BY:
RM011 JOHL
CITY CLERK, CITY OF LODI
DANA R. CHAPMAN
ADMINISTRATIVE CLERK
CITY OF LODI
Carnegie Forum
303 WeA F%e Shve4 Lodi
NOTICE OF PUBLIC HEAfMQ
Date: March 21,2007
Time: 7:00 p.m.
For information regarding this notice please contact:
Randa Johl,
City Clerk
Telephone: (200) 333-6702
NOTICE OF PUBLIC HOMAING
EXHIBIT Al
NOTICE IS HEREOY GIVEN that on wedrse"ay, Marc, 21, 2007, at the hour
of 7:00 p.m., or as soon thereafter as the matter may be heard, the Cky Council
will conduct a pubic hearing at the Carnegie Forum, 305 West Pine Street, Lodi,
to consider the foltwing matter:
a) Resolution estabfishing Area of Benefit and Reimbursable Costs for
Lower Sacramento Road (Kettleman Lane to Harney Lane)
improvements
Information regaling this item may be obtained in the Public Works
Department, 221 West Pine Street, Lodi, (209) 333-6706. All Interested persons
are invited to present their views and comments on this matter. Written
statements may be filed with the City Clerk, City Hall, 221 W. Pine "Street, 2"d
Floor, Lodi, 9W4O, at any time prior to the hearing -scheduled herein, and oral
statements may be made at said hearing.
If you change the subject matter in court, you may be limited to raising only
those issues you or someone else raised at the public hearing descried in this
notice or in written correspondence delivered to the City Cleric, 221 West Pine
StreK at or prior ID the close of the public hearing.
By Order of the Lodi City Council:
Johl
City Olerk
DOW: FebWery 21, 2007
.1..
F;
�ow,
I
D. Stephen Schwllbauer
city Attorney
<WRKYNAHEARWOURSOOPWAW
JEXHIE!T B d^°s^6 �P�
APN
OWNER
ADDRESS
CITY/STATE/ZIP
SITUSNUM
05803013
BOC LODI III
100 SWAN WAY
OAKLAND CA 94621
1551 N
LLC
SUITE 206
LOWER
SACRAMENTO
RD
05803043
VAN RUITEN
PO BOX 520
WOODBRIDGE CA
14509, 14499,
05803044
RANCH LTD
95250-0520
14433 N
05803095
LOWER
SACRAMENTO
RD
05803006
HOWARD
2026 ANGELICO CIR
STOCKTON CA 95207
14195 N
INVESTMENTS
LOWER
LLC ETAL
SACRAMENTO
RD
05804041
SCIUMACHER
1303 RIVERGATE
LODI CA 95240
14101, 13837,
05804002
WELDON &
OR
13537, 13589
05804094
BONNIE TR
N LOWER
05804045
SACRAMENTO
RD
058070137
HAYN, BRIAN S
810 E HARNEY LN
LODI CA 95242
810 E HARNEY
LN
05807000
BELL LYNDLE
814 E HARNEY LN
LORI CA 95242
814 E HARNEY
A TR
LN
05807009
WOODS MARY
880 E HARNEY LN
LODI CA 95242
880 E HARNEY
E TR
LN
05814004
FRAME DEAN
212 RUTLEDGE DR
LODI CA 95242
14752 N
K & SHARON L
LOWER
TR
SACRAMENTO
RD
05814005
ALI RAMZAN
1112 RIVERGATE
LODI CA 95240
865 E OLIVE
DR
ST
05814006
HERRMANN
1200 GLEN HURST
LODI CA 95240
800'E OLIVE
VERNET & C
AVE
TRS
058140137
DEL RIO
15315 N HOERL RD
LODI CA 95240
844 E OLIVE
SANTIAGO M &
AVE
RAMONA T
05814048
HALL FRANK
PO BOX 90
FRENCH CAMP CA
690 EOLiVE
95231
AVE
05814009
DEL RIO
865 E OLIVE AVE
LODI CA 95242
908 E OLIVE
SANTIAGO M &
AVE
RAMONA T
05814010
AMIGABLE
1923 MORRIS AVE
CLOVIS CA 93611-1492
930 E OLIVE
LETICIA F
AVE
ETAL
05814011
GREVER
1432 PARK ST
LODI CA 95242
777 E OLIVE
ZANE M & P
AVE
TRS
05814012
PETERSON M
P O BOX 473
LOCKEFORD CA 95237
14500, 14320
05814052
BILL
N LOWER
SACRAMENTO
RD
05814014
PETERSON
PO BOX 331
SUTTER CREEK CA
14620 N
RUTH SUSAN
95685
LOWER
SACRAMENTO
RD
05823006
GALINDO
871 E HARNEY LN
LODI CA 95242
871 E HARNEY
MARK L &
LN
ELEANOR R
05823007
STICE LARRY
893 E HARNEY LN
LODI CA 95242
893 E HARNEY
& GORETI
LN.
05823008
SANCHEZ JOB
909 E HARNEY LN
LODI CA 95242
909 E HARNEY
& ELENA
LN
05823009
SANDOVAL
931 E HARNEY LN
LODI CA 95242
931 E HARNEY
LORENZO V &
LN
MARGARIT
05823010
SCHUMACHER
1303 RIVERGATE
LODI CA 95240
13520 N
WELDON &
DR
LOWER
BONNIE TR
SACRAMENTO
RD
WAL MART
MAIL STOP 0555
BENTONVILLE AR .
REAL ESTATE
72716-0555
BUSINESS TR
TAMURA JOEY
788 W ARMSTRONG
LODI CA 55240
TR
RD