HomeMy WebLinkAboutAgenda Report - February 15, 2006 E-04AGENDA ITEM 64
AM CITY OF LODI
COUNCIL COMMUNICATION
TM
AGENDA TITLE: Approve Plans and Specifications and Authorize Advertisement for Bids for
White Slough Water Pollution Control Facility Holding Pond No. 1
Rehabilitation, 12751 North Thornton Road
MEETING DATE: February 15,2006
PREPARED BY: Public Works Director
RECOMMENDEDACTION: That the City Council approve the plans and specifications for the
above project and authorize advertising for bids.
BACKGROUND INFORMATION: This project consists of windrowing, aerating, and air drying
approximately 25,000 cubic yards of eroded soil and organic
material, in place, in the bottom of Holding Pond No. 1. The project
also consists of loading, hauling, and placing the suitably dried
material at a designated storage yard at the White Slough Water Pollution Control Facility.
The plans and specifications are on file in the Public Works Department
FISCAL IMPACT: Failure to perform this work will lead to decreased storage capacity in the
pond, as well as permit violations due to over topping of the pond.
FUNDING AVAILABLE: The money for this project will be coming from the Wastewater Capital
Fund. A request for appropriation of funds will be made at contract award.
Project Estimate: $150,000
Budgeted: 05/06 fiscal year
Planned Bid Opening Date: March 7, 2006
Ruby Paste, Interim Finance Director
. aA-A�
Richard C Prima, Jr.
Public Works Director
Prepared by Mark J. Lindseth, Associate Civil Engineer
RCPIMJLIpmf
cc: Joel Harris, Purchasing Officer
Del Kerlin, Assistant Wastewater Treatment Superintendent
APPROVED:
-�--
Blair King, Go Manager
J %PR0JECTSISEWERIWSWPGFIWS Holding Pond I\CPS&A doc 2!3!2006