Loading...
HomeMy WebLinkAboutAgenda Report - February 7, 2007 E-13A66NDA ITIII:IYI FO fVCITY OF Low . COUNCIL COMMUNICATION lM AGENDA TITLE: Adopt Resolution to Revise the Current Abatement Fee Schedule MEETIAII10 DATE: February 7, 2007 PREPANED BY: Community Improvement Manager RECOMMEMKWD ACTION: That the City Council adopt by Resolution the attached Abatement Fee Schedule. SACKG&OUKD INFORMATION: On December 20, 2000, the City Council adopted a Resolution establishing an Abatement Fee Schedule and Policies and Procedures for Rotating Abatement Contractor Listing. On April 7, 2004, that Abatement Fee Schedule was revised to account for an increase in material costs, namely the cost of plywood board -up material, which had changed significantly since the date that the fee schedule was established. Since its inception, the Abatement Fee Schedule has helped to expedite code enforcement activities requiring the boarding up of vacant, unsecured buildings and the removal of garbage, junk and debris in those cases where the owner has failed to voluntarily secure or clean up their properties after having been givon due notice. The standardized fees based upon the size of window or door openings have streamlined the abatement process considerably and have ensured that costs assessed against properties are reasonable. However, since the inception of this fee schedule there have been no adjustments to the labor -related costs associated with either the board -up or lot clean-up abatement activities. Therefore, a property owner facing an abatement action is likely to find that it would be cheaper to have the City do the abatement rather than contracting with someone who would be charging a more current labor rate. While it is appropriate to keep abatement costs within reason, we should not create a condition where there is an incentive for property owners to rely on the City for the abatement of these conditions, as that creates a burden and additional workload for code enforcement personnel, and is contrary to our desire to achieve voluntary compliance. The contractors participating in our rotating abatement list have also voiced concern that they cannot continue to participate in our eibatement program without an adjustment to the labor -related costs of the fee schedule. Those adjustments are noted in the following summary. Add to that the increase in dumping fees and special charges for disposal of materials that are now classified as either household hazardous waste or require special handling at the dump/transfer facility, staff feels that a review and revision of the current Abatement Fee Schedule, as referenced in Exhibit A, is warranted. APPROVED: Blair , City Manager A summary of those revisions is as follows: Fees fo a g}ri trgctures • rnis 14 addriess the actual board -up of unsecured openings. These fees are based upon both the time and the material necessary to board -up and secure the opening. An average adjustment of 1 S°h is recommend6d to accommodate an increase in labor costs in these fees. • Neffw 10-17 address the actual replacement of doors as a means of securing a building. There is a substantial increase in these fees (an average of 36%) for replacement of garage doors and sliding glass doors from what was originally established in 2000. This is based upon the average of actual quotes that were received for that work to be done. It should be noted that this portion of the Fee Schedule is rarely used, but should still remain as an abatement option. ProDerty.0 _UPS • Mems 18 ±& 1 S originailly differentiated between the cleanup of either junk and debris or weeds and shrubbery with different hourly rates. It has been found during actual clean ups that the abatement of junk and debris is usually done in conjunction with weeds and shrubbery, so it is not practical to have a separate hourly rate for each. An hourly rate of $65 is proposed to be reasonable to accommodate the increase in labor costs since 2000. *mMi . II o ta M2nt Cots su202 have been added to the fee schedule to accommodate the additional costs that are being incurred in the disposal of garbage, junk and debris in the course of an abatement action. This will represent the actual costs based upon either the quote for equipment rental or the current dump fee schedule. FISCAL 111 PACT: The increase in abatement costs is passed directly to the property owner/responsible party. It is likely that the increase in these abatement costs will act as an incentive for voluntary compliance, thereby reducing the amount of abatement funds expended each year. FUNDIIS *VAJLABLE: ood` .y Impro nt'Manager Attachment ition Fund tl.'-'A_"�'I�_ Concurred: Randy ch Community Development Director CITY OF LODI COMMUNITY DEVELOPMENT DEPARTMENT ABATEMENT FEIE SCHEDULE FOR ROTATING CONTRACTOR LIST (April 2004) ITEM # n= DOCRrTM Current Fee ProFee 1. T PI Board -Up, Door, 4'x8' $80 $95 2. Plywood oard-U , Double Door, 8'x8' $170 $200 3. Plywood and -U , Window, <2'6"x 4' $50 $65 4. Plywoo4 Board -Up, Window, <4'x4' $60 $75 5. PI oo. Board -Up, Window, <4'x6' $75 $85 6. Plywood Board -Up, Window, <4'x8' $80 $95 7. oo: Board -Up, Window, <8'x8' $170 $200 8. PI d B :` rd -U , Crawl Space O enin $60 65 9. Plywood Board Up, Exterior Basement Door, 6'x7' Using 3/4" Material $215 $250 10. Re : a Sin le Car Garage Door $270 $450 11. Replace' Double Car Garage Door $535 $700 12. Re 4 Sliding Glass Door, 6' $360 $+400 13. R2place Wood Basement Door, 6'x5' $185 $200 14. Replace F nt Double Wood Entry Doors $465 $500 15. Re la' 99 Gara92 Pedestrian Door $155 $200 16. Re ce Under Floor Vents $30 $50 17. Replace Attic Vents $35 $50 P AM CUM UPI 18. Remove Garb e, Jung and Debris(hourly rate $35 $65 19. Remove Weds and Shrubbery hour) rate $25 $65 20. i T T E i m enta Costs rquote) 21. Standard DuqV Fees based up2n actual costs 22. Additional Du rr4p Fees(based ulpon actual costs Note: hems 18 & 19 to be combined as one hourly rate for property clean ups. Items 21 & 22 will be Usted based upon actual fees posted at the disposal facility. EXHUNT A RESOLUTION NO. 2007-19 A RESOLUTION OF THE LODI CITY COUNCIL :ADOPTING AN AMENDMENT TO THE CODE ENFORCEMENT ABATEMENT FEE SCHEDULE WHEREAS, the Lodi Municipal Code requires the City Council, by resolution, to set fees for various services provided by the City of Lodi to recover those costs associated with providing specific services and programs; and WHEREAS, as part of the Cade Enforcement function in eliminating blight, nuisances, and substandard and dngerous building conditions, the Community Development/Community Improvement Division issues orders requiring the board -up and securing of vacant structures as well as the removal and clean up of garbage, junk, and debris from yard areas; and WHEREAS, vacant, unsecured structures are required to be boarded up within one to ten days, depending on the severity of the hazardous condition; and WHEREAS, currently, in the event that the structure is not secured or the yards are not clued voluntarily within the required time frame, the bid process is initiated in order to allow the City to have the work done god have costs billed to the property owner; and WHEREAS, the City Council adopted Resolution No. 2000-235 on December 20, 2000, approving the Abatement Fee Schedule, and further adopted Resolution No. 2004-62 on April 7, 2004, amending the fee schedule to reflect increase in materials. costs; and WHEREAS, there hag been no adjustments to the labor -related costs associated with either the board - up or lot clean-up abatement activities since the inception of the Abatement Fee Schedule, and staff now reconwnends increasing the Abatement Fee Schedule as shown on Exhibit A attached hereto. NOW, THEREFORE, BE IT RESOLVED that the City Council finds as follows: 1. That the increase in the Abatement Fee Schedule is hereby approved as shown on Exhibit A attached and made a part hereof; and 2. All resolutions or parts of resolutions in conflict herewith are repealed insofar as such conflict may exist; and 3. This resolutign shall be published one time in the "Lodi News -Sentinel," a daily newspaper of general circustion printed and published in the City of Lodi, and shall be in force and take effect immediately ttpon its adoption. Dated: February 7, 2007 I hereby certify that Resolution No. 2007-19 was passed and adopted by the City Council of the City of Lodi in a regular meeting held° February 7, 2007, by the following vote: AYES: COUNCIL MEMBERS — Hansen, Hitchcock, Katzakian, Mounce, and Mayor Johnson NOES: COUNCIL MEMBERS — None ABSENT: COUNCIL MEMBERS — None ABSTAIN: COUNCIL MEMBERS — None JOHL City Cleric 2007-19 EX WBR A CITY OF LODI COWUNITY DEVELOPMENT DEPARTMENT ABATEMENT FEE SCHEDULE FOR ROTATING CONTRACTOR LIST ITEm.# ITE DOCRiP'1'iON Fee 1. Pl ood Board -U , Door, 4'x8' $95 2. Plywood Board -Up, Double Door, 8'x8' $200 3. Pl ood Board -Up, Window, <2�6"x 4' 1 $65 4. Plywood Board -Up, Window, <4)W $75 5. Plywood Board -Up, Window, <4x6' $85 6. Pl Board -Up, Window, <4)L8' $95 7. Plywood Board -Up, Window, <8'x8' $200 8. Plywood Board -Up, Crawl Space Opening $65 9. Plywood Board Up, Exterior Basement Door, 6x7' Using 3/4" Material $250 10. Re lace Sin a Car Gara a Door $450 11. ace Double Car Garage Door R4ace $700 12. R lace SMng Glass Door, 6' $400 13. Re loce Wood Basement Door, 6x5' $200 14. Replace Front Double Wood Entry Doors $500 15. Replace Garage Pedestrian Door $200 16. Re lace Under Floor Vents $50 17. Replace Attic Vents $50 18. Y Remove e, Junk and Debris (hourly rate) $65 19. Remove Weeds and Shrubbery (hourly rate) $65 hMCELAANWM ABATEMENTCOSTS 20. ment Rental Costs rquote) 21. Standard lump Fees (based upon actual costs 22. Additional Dump Fees (based upon actual costs 3 Note: Items 18 & 19 to be combined as one hourly rate for property clean ups. Items 21 & 22 will be listed based upon actual fees posted at the disposal facility. SU E T: PUBLISH DATE: Please har e ' ely con,&m receipt of this fax by c,a afro 333-6702 CITY OF LODI P. O. BOX 3006 LODI, CALIFORNIA 95241-1910 ADVERTISING INSTRUCTIONS RESOLUTION AMENDING THE CODE ENFORCEMENT ABATEMENT FEE SCHEDULE SATURDAY, FEBRUARY 10, 2007 TEAR SHEETS WANTED: Three (3) please SEND AFFIDAVIT AND BILL TO: RANDI JOHL, CITY CLERK City of Lodi P.O. Box 3006 Lodi, CA 95241-1 91 0 DATED: THURSDAY, FEBRUARY 8, 2007 ORDERED BY: ?;NMFEROA. PERRIN, CMC PUTY CITY CLERK forms4dvios.doc RANDIJOHL CITY CLERK DANA R. CHAPMAN ADMINISTRATIVE CLERK PROOF OF PUBLICATION (2015.5 C.C.C.P.) STATE OF CALIFORNIA County of Sten Joaquin I am a citizen of the United States and a resident of the County aforesaid: I am over the age of eighteen years and not a party to or interested in the above entitled matter. I am the principal clerk of the printer of the Lodi News -Sentinel, a newspaper of general circulation, printed and published daily except Sundays and holidays, in the City of Lodi, California, County of San Joaquin and which newspaper had been adjudicated a newspaper of general circulation by the Superior Court, Department 3, of the County of San Joaquin, State of California, under the date of May 26th, 1953. Case Number 65990; that the notice of which the annexed is a printed copy (set in type not smaller than non-pareil) has been published in each regular and entire issue of said newspaper and not in any supplement thereto on the following dates to -wit: February loth, all ill the year 2007. I certify (or declare) under the penalty of perjury that the foregoing is true and correct. D ed atLodi, California, this loth day of br ary�. zo0 i... .................... Signature This space is for the County Clerk's Filing Stamp Proof of Publication Resolution Amending the Code Enforcement Abatement Fee Schedule nVibil UTiON No. 2007-19 A RESOLUTION OF THE LODI CITY COUNCIL ADOPTI iO AN I .AIABMMIT TO THE CODE BUWCEMENT AB11TE51EtfTft6 _ WHEREAS„the Led Mupicipal-Cods requires the City Council. by resolution,10 set foes for various -services provided by. the ., City of Lodi freoover,those �sls associated with providing gxldflc services and programs; and WHEREAS, as part ol.the Code Enforcement function in' eliminating blight, nufeances, and SubstandaM and dangerous building conditions, the Community Devalors requiring the 6poraentlCommunity Improvement Division as Wellasthe removal and cleanupgarbage, junof k. and debris from yard areas; and WHEREAS, vacant, unsecured structures are required to be boarded up within one to ten days, depending on the severity of the hazardous condition; and. WHEREAS, currently, in ft event that the stnxturs.ia not secured or the yards are not cleaned voluntarily within the required time Imme, the bid process is initiated in order to allow the City to have the work done and have !;oats billed 10 the Property owner; and WHEREAS, the City Council adopted Resolution No. 2DD0-235 on December 20, 2000, appfovin� the . Abatament Foe Schedule, and further adopted Resok” No. 2004-62 onAprli 7, 2004, amending the fee schedule to reflect increase in materials costs; and WHEREAS, there has been no adjustro" to the labor - related costs associated with either Ore board -up or lot clean-up abate Ment sctWttiae since them .kmpfion of the Abateant Fee Schedule, and staff now recommends Increasing the Abatement Fee Schedule as.. shown on Exhibit A attached hereto. NOW, THEREFORE, BE IT RESOLVED that the City Council finds as fottows: 1. That the' incrowe in; the Abatement Fee schedule is hereby apfrroved as shown on Exhibit A attached and made a part hereof; and nr,naHo n/ roenkeinn� 1. Oct P, nor 4xB' 595 2. Elywood BomdUp, Double Door,.BxB' 00 3, Plywood 6oard•Up, Window, Q'6"x 4' 565 1.,:s. 4. .-Plywood i3oard-Up, Wkidow 04'x4 $75" 5. Plywood Board -Up, ,p, Window .at°x6 �5 6. Plywood Board -Up, Wb*ow,-axV 5 7.' .15' rPlywpod Boar"p, Window, c6'xe` 52D0 ' 6. plywood Board -Up, Crawl 31)008 opening 565 ' 9. plywood Board Up, Exterior Basement Door, 6'xT $250,. 10. 11. :.Using W4' Material •Repleca,SCar Garage Door Replace ou Car or Garage Do $700 13 Repipce WoodBaeament Glsa&DoorDoor, 6'x5' "Re _ 5200 , 14 .12. i Replace Frod Double wood Entry Doors $500 . $200 15 Reps Garage Pedestrian Door 16 17 Replace Under Floor Vonts Replace NW Vents TM. jupuPS d Deb . 19. Remove Woods and Shru �h rate)) $65 20. 21. qulpmernl Renta! (pet qugte) Standard Dump Fees (based upon actual costs) 22. Additional Dump Fees (based upon actual costs) Note: Itema 16 & 19 to be combined as a* hourly for fees r o art n dis- item 21 & 22 wit be listed basad:trpoq the Mal facility. rebruary 10, 2007 05514370