HomeMy WebLinkAboutAgenda Report - January 4, 2006 E-07AGENDA ITEM Er 01 CITY OF LODI COUNCIL COMMUNICATION M AGENDA TITLE: Adopt Resolution Awarding Contract for Water Meter Installation Project to Arrow Construction of Modesto and Authorize the City Manager to Execute the Contract (Project Estimate $85,000) MEETING DATE: January 4,2006 PREPARED BY: Public Works Director RECOMMENDED ACTION: That the City Council adopt a resolut i wntract for Water Meter Installation Project to Arrow Construction of Modesto and authorize the City Manager to execute the contract. BACKGROUND INFORMATION: The Water Meter Installation Project is a pilot project intended to initiate compliance with Assembly Bill 2572 to install meters on all of the approximately 17,000 unmetered services within the City by January 1, 2025. Optionsto acceleratethis schedulewill be presented to the Council later this year. The Project includes the installation of approximately 400 domestic water meters with remote read capabilities. The meters are to be installed in existing water meter boxes within the project area as shown on the attached map. The work is anticipated to take approximately 2 months. A contingency of approximately 10% is included in the total project estimate to cover unforeseen field conditions. Plans and specifications for this projectwere approved on October 19, 2005. On December21, 2005 sealed bids were opened with the following results: Bidder Engineering Estimate Arrow Construction Preston Pipeline, Inc. Carl Crutchfield Construction Location Bid $85,000 Modesto $52,831 Lathrop $56,801 Stockton $82,606 The bid received by Arrow Construction is technically compliant with the City's plans and specifications and the Bidder possessesthe required, valid contractor's license. Construction of this project is anticipated to start in February 2006. Inspection and construction management services will be performed by City Engineering Staff. The meters are to be purchased by the City and installed by the contractor. Staff will provide project information to the public to inform the community about the construction schedule and project scope. APPROVED: - 'I Blair Kin ity Manager J TROJECTSMATERNMetersWeter €nstallation\GAward.doc 1212712005 Adopt Resolution Awarding Contractfor Water Meter Installation Projectto Arrow Construction of Modesto and Authorize the City Manager to Execute the Contract (Project Estimate $85,000) January 4, 2006 Page 2 FISCAL IMPACT: In addition to the initial capital costs, it is anticipated that operation and maintenance costs will increase over time to repair and maintain the water meters. FUNDING AVAILABLE: 2005/2006 Budget Appropriation (Acct. 181456) $180,000 Water Utility Capital Outlay Fund Project Estimate (Installation Only): $ 85,000 lawc /*1 R y siste, Interim Finance Director ITichard C fPrfma, Jr. Public Works Director Prepared by Charlie Swimley, Senior Civil Engineer RCP/DES/pmf Attachment cc: F. Wally Sandelin, City Engineer Wes Fujitani, Senior Civil Engineer Sharon Welch, Senior Civil Engineer Paula Fernandez. SeniorTraffic Engineer Joel Harris, Purchasing Officer J:IPROJECTSMATEMMeterS`Meter InstatlaflonlCAward.doc 12/27/2005 917JO U ..`�►�CITY OF LODI PUBLIC WORKS DEPARTMENT VICINITY MAP WATER METER \I1vcTar r aTrnrr r nraTrnNs/ 3 M:\0PEN\EXHIBITS\05X044.dwg, 10/10/2005 3:30:31 PM, Acrobat Distiller rangy RESOLUTION NO. 2006-04 A RESOLUTION OF THE LODI CITY COUNCIL AWARDING CONTRACT FOR WATER METER INSTALLATION PROJECT AND AUTHORIZING THE CITY MANAGER TO EXECUTE THE CONTRACT ON BEHALF OF THE CITY OF LODI WHEREAS, in answer to notice duly published in accordance with law and the order of this City Council, sealed bids were received and publicly opened on December 21, 2005, at 11:00 a.m., for the Water Meter Installation Project, described in the specifications therefore approved by the City Council on October 19,2005; and WHEREAS, said bids have been compared, checked, and tabulated and a report thereof filed with the City Manager as follows: iBidde Location Bid Enc;ineer's Estimate $ai;000,00 Arrcw Construction Modesto $52.' 831 .00 Preston Pipeline, Inc. Lathrop $ 56,801.00 Carl Crutchfield Construction Stockton $ 82,606.00 WHEREAS, staff recommends award of the contract for Water Meter Installation Project to the low bidder, Arrow Construction, of Modesto, California, in the amount of $52,831.00. NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council hereby awards the contract for the Water Meter Installation Project to the low bidder, Arrow Construction, of Modesto, California, in the amount of $52,831.00; and BE IT FURTHER RESOLVED that the Lodi City Council hereby authorizes the City Manager to execute the contract on behalf of the City of Lodi. Dated: January4,2006 hereby certify that Resolution No. 2006-04 was passed and adopted by the City Council of the City of Lodi in a regular meeting held January 4,2006, by the following vote: AYES: COUNCIL MEMBERS — Beckman, Hansen, Johnson, Mounce, and Mayor Hitchcock NOES: COUNCIL MEMBERS— None ABSENT: COUNCIL MEMBERS— None ABSTAIN: COUNCIL MEMBERS— None SUSAN J. BLACKSTON City Clerk 2006-04