HomeMy WebLinkAboutAgenda Report - December 21, 2005 K-07AGENDA ITEM K-7
CITY OF LODI
COUNCIL COMMUNICATION
AGENDA TITLE: Adopt resolution to award contract to Rosendin Electric Inc., San Jose, CA
for the reconstruction of Kilielea Substation and the addition of 60kV power
circuit breakers (PCB) at Industrial Substation; accept the bid withdrawal of
Diede Construction; and authorize the transfer of funds in the amount of
$4,231,874 to fund this phase of the project (EUD)
MEETIN43 DATE: December 21, 2005
PREPARED BY: Electric Utility Director
RECOMMENDED ACTION: That the City Council adopt resolution awarding the contract for the
reconstruction of Kilielea Substation and the addition of 60kV PCB
at Industrial Substation to Rosendin Electric (Rosendin) of San
Jose, California, and to further accept the bid withdrawal of Diede Construction (Diede) and authorize the
transfer of sufficient funds of $4,231,874 to fund this phase of the project.
BACKGROUND INFORMATION: Planning for the reconstruction of Kilielea Substation and the
addition of two 60kV PCB at Industrial Substation commenced on
June 7, 2000. Engineering and design were completed on January
19, 2005. On August 3, 2005, the City Council authorized the
advertisement for bid for this project. Bid proposals were received and opened on November 9, 2005
from three bidders with the results shown below.
BIDDER AMOUNT
Rosendin Electric Inc., San Jose CA $4,231,874.00
Wilson Construction, Rancho Cordova, CA 4,854,928.50
Diede Genstfuetien, Wgndbrigimm GA 4,038,026.63
' Bid withdrawn due to clerical error.
In the afternoon of the bid opening, we received a telephone call from Mr. Jeff Gilbertson of Diede
Construction that they are withdrawing their bid due to clerical error. Letter of bid withdrawal from Diede
was received on November 11, 2005 that is within five (5) days after the opening of bids as prescribed in
California Public Contract Code Section 1503. A mistake was incurred in filling out the bid form, which
made the bid materially different than they intended it to be. We therefore recommend to the City Council
the acceptance of the bid withdrawal of Diede Construction.
The EUD Project Team and Power Engineers scrutinized the bid proposal and supporting documents
submitted by the second lowest bidder, Rosendin. The bid proposal and supporting documents
submitted by Rosendin were complete and in order. Due to the withdrawal of Diede and wide bid
estimates on several Construction Units by the bidders, we requested Rosendin to verify their bid costs.
Rosendin responded on November 16, 2005 that their figures are complete and correct for a total project
bid price of $4,231,874. Power Engineers' estimate was $3,869,040 with two (2) power transformers
APPROVED: f
Blair KQ, City Manager
Adopt resolution to award contract to Rosendin Electric Inc., San Jose, CA for the reconstruction of Killowe Substation
and the adilltion of GOO power circuit breakers (PCB) at Industrial Substation; accept the bid withdrawal of Diode
Construction; and authorize the transfer of funds in the amount of $4,231,874 to fund this phase of the project (EUD)
December 21, 2005
Page 2 of 2
bid price of $4,231,874. Power Engineers' estimate was $3,869,040 with two (2) power transformers
included in the cost. Deducting the approximate price of the transformers, the initial estimated
construction cost of the substation would be $3,069,040. Power Engineers furnished this estimated cost
in July 7, 2003. The difference between the engineer's estimate and Rosendin's bid is $1,162,834. The
significant difference is due to market changes, unforeseeable natural events, and drastic price increases
in materials and supplies from 2003 to the present time. During the bidding period, more than twenty-five
(25) sets of bid documents were mailed to potential bidders but only ten (10) prime contractors showed
interest on the project. Three proposals were received and another one missed the 11:00 o'clock
deadline on November 9, 2005. It is assumed that the resurgence of high-voltage transmission projects,
renewable energy resource initiatives and other construction projects resulted in shortage of skilled labor
and relatively low response to this bid request by the City. Rebidding the project, which is not
recommended, would likely draw fewer bids and most probably at a higher price. Based on current
conditions and for purposes of improving the power distribution system of the City, we therefore
recommend that project be awarded to Rosendin Electric.
Total project costs are estimated at $6,208,003 and a breakdown of those costs is provided on
Attachment 1. Currently, funds remaining in the bond proceeds total $11.8 million.
Therefore, we recommend the transfer of funds to finance this portion of the reconstruction of Killelea
Substation and the addition of power circuit breakers (PCB) at Industrial substation. The transfer from
bond proceeds to augment funds in Business Unit 161677 shall be $4,231,874.
FISCAL MPACT: None. Project was scheduled and listed as a bond project. The estimated
completion date is April 2007.
FUNDING AVAILABLE: Transfer from bond proceeds the amount of $4,231,874 to project Business
Unit No. 161677.
-X� "'e. 4,�& .'0 /
James . Krueger, Finance Dire or
David Dockham
Interim Electric Utility Director
PREPARED BY: Demy Bucaneg, Jr., Sr. Power Engineer
DD/DBAst
cc: City Attomey
ATTACHMENT 1
Killelea S/S Reconstruction & Industrial S/S 60kV PCB Addition Project
Date: 8 -Nov -05
Item No. Description Estimate
1 Reconstruction and PCB Addition $4,231,874.00
2 Power Transformer Procurement $1,250,000.00
Construction Management, Test and
3 Commissioning $ 427,579.00
4 Engineering Support $ 61,350.00
5 House Acquisition $ 230,000.00
6 HazMat Test and Survey $ 7.200.00
Total Project Cost $6.208.003.00
RESOLUTION NO. 2005-266
A RESOLUTION OF THE LODI CITY COUNCIL AWARDING CONTRACT FOR THE
RECONSTRUCTION OF KILLELEA SUBSTATION AND THE ADDITION OF 60kV POWER
CIRCUIT BREAKERS AT INDUSTRIAL SUBSTATION; AND FURTHER ACCEPTING THE
BID WITHDRAWAL OF DIEDE CONSTRUCTION, AND AUTHORIZING THE TRANSFER OF
FUNDS IN THE AMOUNT OF $4,231,874 TO FUND THIS PHASE OF THE PROJECT
WHEREAS, in answer to notice duly published in accordance with law and the order of this City
Council, sealed bids were received and publicly opened on November 9, 2005, at 11:00 a.m., for the
reconstruction of Killelea Substation and the addition of 60kV power circuit breakers at Industrial
Substation, described in the specifications therefore approved by the City Council on August 3, 2005;
and
WHEREAS, said bids have been compared, checked, and tabulated and a report thereof filed
with the City Manager as follows:
Bidder Location Bid
EnalgWr'll Eatlmate I
Rosendin Electric Inc. San Jose, CA $4,231,874.00
Wilson Construction Rancho Cordova, CA $4,854,928.50
Diede Construction Woodbridge, CA $4,038,025.63*
Note: * Bird withdrawn due to clerical error.
WHEREAS, the staff recommends award of the contract for the reconstruction of K1111elea
Substation and the addition of 60kV power circuit breakers at Industrial Substation to the second. low
bidder, Rosendin Electric Inc., of San Jose, California, in the amount of $4,231,874.00, a #w bid
withdrawal of Diede Construction, and authorizing the transfer of sufficient funds of $4,04.00 to
fund this phase of the project.
NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council hereby awards the contract
for the reconstruction of Killelea Substation and the addition of 60kV power circuit breakers at Industrial
Substation to the second low bidder, Rosendin Electric Inc., of San Jose, California, in the amount of
$4,231,874.00; and
BE IT FURTHER RESOLVED that the Lodi City Council hereby accepts the bid withdrawal of
Diede Construction, due to a clerical error; and
FURTHER RESOLVED that the Lodi City Council hereby authorizes the transfer of sufficient
funds of $4,231,874.00 to fund this phase of the project.
Dated: December 21, 2005
I hereby certify that Resolution No. 2005-266 was passed and adopted by the City Council of the
City of Lodi in a regular meeting held December 21, 2005, by the following vote:
AYES: COUNCIL MEMBERS — Beckman, Hansen, Johnson, Mounce,
and Mayor Hitchcock
NOES: COUNCIL MEMBERS — None
ABSENT: COUNCIL MEMBERS — None
ABSTAIN: COUNCIL MEMBERS — None
SUSAN J: BLA TON.
City Clerk -
2 -005,286
CITY COUNCIL
SUSAN HITCHCOCK, Mayor
BOB JOHNSON
Mayor Pro Tempore
JOHN BECKMAN
LARRY D. HANSEN
JOANNE L. MOUNCE
John L Brown
Rosendin Electric Inc
880 Mabury Road
San Jose CA 95133
CITY OF LODI
ELECTRIC UTILITY DEPARTMENT
DAVID DOCKHAM, INTERIM DIRECTORY
1331 S HAM LANE T
LODI, CALIFORNIA 95242-3995
(209)333-6762
FAX (209) 339-6839
December 22, 2005
BLAIR KING
City Manager
D. STEPHEN SCHWABAUER
City Attorney
r r SUSAN J. BLACKSTON
City Clerk
Re: Killelea Substation Reconstruction and Industrial Substation-60kV PCB Addition
At the City Council meeting of December 21, 2005, your firm was awarded the contract for
Killelea Substation Reconstruction and Industrial Substation-60kV PCB Addition in the amount
of $4,231,874.00. The bids received for the project are tabulated below:
BIDDER AMOUNT
Rosendin Eloctric Inc., San Jose CA $4,231,874.00
Wilson Construction, Rancho Cordova, CA 4,854,928.50
At this time various documents need to be completed and/or provided by you in order to finalize
the Contract for this project. Therefore, enclosed with this letter you will find:
Contract, 3 copies.
Please execute each copy on page 4.17 under CONTRACTOR and return the three
copies to the City for execution. The effective date of this contract will be the date the
City executes the Contract.
Contract Surety Bonds (Labor and Materials, Faithful Performance) 1 copy of each.
Please have these bonds completed and submitted with the Contract. See section
2.1000 of "Information to Bidders". The bonds must be executed on the forms enclosed
with this letter in addition to any other documents your Surety Company may wish to
supply. The "California All -Purpose Acknowledgment" must also be completed for each
Bond.
Insurance Certificate
Please provide and include the insurance certificates with the Contract, as required per
section 2.1200 and 2.1300 of "Information to Bidders". The "Certificate Holder's"
address should be City of Lodi, 221 West Pine, Lodi, California, 95240.
Please return all documents to:
Demetrio Bucaneg, Jr.-P.E.
City of Lodi, Electric Utility Department
1331 South Ham Lane
Lodi CA 95242-3995
Upon execution of the contract a pre construction meeting will be scheduled at the Electric
Utility Service Center, 1331 S. Ham Lane, Lodi CA. Please indicate the name or names of the
individual(s) in your organization we should contact regarding the specific date and time of the
pre construction meeting.
Upon execution of the contract by the City your Bid Bond will be returned.
you have any
Senior Power Engineer
Enclosures
c: Electric Utility Director
city Clerk
Purchasing Officer
, please do not hesitate to contact me at (209) 333-6811.
CITY COUNCIL
SUSAN HITCHCOCK, Mayor
BOBJOHNSON
Mayor Pro Tempore
JOHN BECKMAN
LARRY D. HANSEN
JOANNE L. MOUNCE
CITY OF LODI
ELECTRIC UTILITY DEPARTMENT
DAVID DOCKHAM, INTERIM DIRECTOR
1331 S HAM LANE
LODI, CALIFORNIA 95242-3995
(209)333-6762
FAX (209) 339-6839
December 22, 2005
Kim E Wilson
Wilson UtNity Construction Company
1190 NW Third Avenue
Canby OR 97013
BLAIR KING
City Manager
D. STEPHEN SCHWABAUER
City Attorney
SUSAN J. SLACKSTON
City Clerk
4.
Re: KiNe(ea Substation Reconstruction and Industrial Substation-6OkV PCB Addition
At the City Council meeting of December 21, 2005, the City Council awarded the bid referenced
above to Rosendin Electric Inc., San Jose CA, the lowest responsible bidder. The bids received
for the project are tabulated below:
BIDDER AMOUNT
1Rosendin Electric Inc., San Jose CA $4,231,874.00
Wilson Construction, Rancho Cordova, CA 4,854,928.50
The bid bond you submitted with your bid proposal will be returned to you once the contract for
this project has been executed, expected within 30 days.
The City of Lodi wishes to thank you for your interest in this project, and assures you that we
welcome proposals from you in the future.
Senior Power Engineer
c: Electric Utility Director
City Cleric
Purchasing Officer
CITY COUNCIL
SUSAN HITCHCOCK, Mayor
BOBJOHNSON
Mayor Pro Tempore
JOHN BECKMAN
LARRY D. HANSEN
JOANNE L. MOUNCE
Steven L Diede
Diede Construction Inc
PO Box 1007
Woodbridge CA 95258
CIN OF LODI
ELECTRIC UTILITY DEPARTMENT
DAVID DOCKHAM, INTERIM DIRECTOR
1331 S HAM LANE
LODI, CALIFORNIA 95242-3995
(209)333-6762
FAX (209) 339-6839
December 22, 2005
BLAIR KING
City Martager
D. STEPHEN SCHWABAUER
City Attomey
' 7 (iWAN J. BLACKSTON
2005 . City Clerk
Re: Killelea Substation Reconstruction and Industrial Substation-60kV PCB Addition
At the City Council meeting of December 21, 2005, the City Council awarded the bid referenced
above to Rosendin Electric Inc., San Jose CA, the lowest responsible bidder. The bids received
for the project are tabulated below:
BIDDER AMOUNT_
Rosendin Electric Inc., San Jose CA $4,231,874.00
Wilson Construction, Rancho Cordova, CA 4,854,928.50
4-839,926.63
The bidder's guarantee you submitted with your bid is herewith returned to you.
The City of
arra Jr. -
Engineer
Enclosures
c: Electric Utility Director
City Clerk
Purchasing Officer
thank you for your interest in this project, and assures you that we
t7'i�the future.