Loading...
HomeMy WebLinkAboutAgenda Report - November 2, 2005 E-05AGENDA ITEM E"b CITY OF LODI COUNCIL COMMUNICATION TM AGENDA TITLE: Adopt Resolution Accepting Improvements at 1020 South Beckman Road MEETING DATE: November 2, 2005 PREPARED BY: Public Works Director RECONIIME14DED ACTION: That the City Council adopt a resolution accepting the development improvements for 1020 South Beckman Road. BACKGROUND INFORMATION: Public improvements at 1020 South Beckman Road have been completed in substantial conformance with the requirements of the improvement agreement between the City of Lodi and GI=LIP III, L.P a California Limited Partnership, as approved by the City Council on February 2, 2005, and as shown on Drawings No. 004DO23-01 through 004D023-05. The project consists of public street and underground utility improvements required for the construction of the Toyota auto dealership expansion at 1020 South Beckman Road. The developer is entitled to reimbursement by the City for the installation of oversize master plan water pipes in conformance with LMC 15.64 Development Impact Mitigation Fees and 16.40 Reimbursements for Construction. The street improvements being accepted at this time are: STREETS Auto Center Drive LENGTH IN MILES 0.23 FISCAL IMPACT: There will be a slight increase in long-term maintenance costs of the public street and underground utility improvements. Funds for the reimbursements are already appropriated. FUNDING AVAILABLE: IMF — Water Improvements (182) $4,385 �-r l mes R. Krueger, Finance birector Richard C. Prima, Jr. l Public Works Director v Prepared by Wesley K. Fujitani, Senior Civil Engineer RCPIWKFIpmf cc: City Attorney Senior Civil Engineer - Development Services Senior Traffic Engineer Street Superintendent Senior Engineering Technician APPROVED: Blair Kin ty Manager J:1DEV_SERV\Caccpt 1020 S Beckman.dac 1012112005 When Recorded, Please Return to: Loci City Clerk P.O. Sox 3006 Lode, CA 95241-1910 RESOLUTION NO. 2005-227 A RESOLUTION OF THE LODI CITY COUNCIL ACCEPTING THE IMPROVEMENTS AT 1020 SOUTH BECKMAN ROAD The City Council of the City of Lodi finds: 1) That all requirements of the Improvement Agreement between the City of Lodi and GFLIP III, L.P., a California Limited Partnership, for the Public Improvements at 1020 South Beckman Road have been substantially complied with. The Improvements are shown on Drawing Nos. 004DO23-01 through 004DO23-05 on file in the Public Works Department and as specifically set forth in the plans and specifications approved by the City Council on February 2, 2005; and 2) That the street improvements being accepted at this time are as follows: Streets Length in Miles Auto Center Drive 0.23 Dated: November 2, 2005 I hereby certify that Resolution No. 2005-227 was passed and adopted by the City Council of the City of Lodi in a regular meeting held November 2, 2005, by the following vote: AYES: COUNCIL MEMBERS — Hansen, Hitchcock, Johnson, Mounce, and Mayor Beckman NOES: COUNCIL MEMBERS — None ABSENT: COUNCIL MEMBERS — None ABSTAIN: COUNCIL MEMBERS — None SUSAN J. BLACKSTON City Clerk 2005-227 CITY COUNCIL JOHN BECKMAN, Mayor SUSAN HITCHCOCK Mayor Pro Tempore LARRY D. HANSEN BOBJOHNSON JOANNE L. MOUNCE GFLIP III, L.P. P.O. Box 1210 Lodi, CA 95241 CITY OF LODI PUBLIC WORKS DEPARTMENT CITY HALL, 221 WEST PINE STREET P.O. BOX 3006 LODI, CALIFORNIA 95241-1910 (209) 333-6706 FAX (209) 333-6710 EMAIL pwdept@lodi.gov http:\lwww.lodi.gov November 3, 2005 SUBJECT: 1020 South Beckman Road BLAIR KING City Manager SUSAN J. BLACKSTON City Clerk D. STEPHEN SCHWABAUER City Attorney RICHARD C. PRIMA, JR. Public Works Director The City Council of the City of Lodi, at its meeting on November 2, 2005, accepted the public improvements that were made in the subject project. Enclosed for your files is a copy of the resolution accepting the public improvements. From the date of the resolution, the City of Lodi will maintain the street and other public improvements installed within rights-of-way and public utility easements as shown on the approved plans. A copy of this letter will be sent to your bonding agency in order that the bond covering faithful performance can be exonerated. The bond covering labor and materials will have to remain in effect for a period of ninety days from the date of the resolution in conformance with State law. If you have any questions, please contact Rebecca Areida, (209) 333-6800 ext. 2658, or me at (209) 333-6709. aU F. Wally tandefin City Engineer FW Slpmf Enclosures cc: Electric Utility Department Water/Wastewater Division Street Division City Clerk Management Analyst Travelers Casualty and Surety Company of America LACCEPT 1020SBECKMAN.DOC Management Analyst, at CITY COUNCIL JOHN BECKMAN, Mayor SUSAN HITCHCOCK Mayor Pro Tempore LARRY D. HANSEN BOBJOHNSON JOANNE L. MOUNCE CITY OF LODI PUBLIC WORKS DEPARTMENT CITY HALL, 221 WEST PINE STREET P.O. BOX 3006 LODI, CALIFORNIA 95241-1910 (209)333-6706 FAX (209) 333-6710 EMAIL pwdept@lodi.gov http:\\www.lodi.gov November 3, 2005 Travelers Casualty and Surety Company of America Randall L. Jorgensen, Attorney -in -Fact 3636 American River Drive, Ste. 200 Sacramento, CA 95684 SUBJECT: 1020 South Beckman Road BLAIR KING City Manager SUSAN J. BLACKSTON City Clerk D. STEPHEN SCHWABAUER City Attorney RICHARD C. PRIMA, JR. Public Works Director The City Council of the City of Lodi, at its meeting on November 2, 2005, accepted the public improvements in the subject project. A copy of the resolution is enclosed. This letter is your authorization to exonerate the bond covering faithful performance. The bond covering labor and materials must remain in effect until January 31, 2006, in conformance with the requirements of State law. You will receive no further correspondence regarding the release of the bond for labor and materials unless a claim is filed. If you have any questions, please contact Rebecca Areida, Management Analyst, at (209) 333-6800, ext. 2658, or me at (209) 333-6709. F. WallyS ndelin City Engineer FW SIRAIpmf Enclosures cc: GFLIP III, L.P. CRy Berk Management Analyst LEON D ING_1020SB ECKMAN. b OC